Record r0.6 design approval in the fast-slow task card
Why: The previous session staged the stage 4 approval of the r0.6 transport design and its precheck receipt without committing them. Evidence: Card-only change; the precheck receipt was written by make evidence on 2026-10-14. Impact: Task card only; PROJECT.md and the documents pointer are refreshed during the main sync. Refs: .task/feature-fast-slow-u2-u3-plan.md Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
File diff suppressed because one or more lines are too long
Reference in New Issue
Block a user