From 5dd13d24b89209eb4eb717ee4c2036c9bd03f79b Mon Sep 17 00:00:00 2001 From: weichen Date: Sat, 10 Oct 2026 07:08:47 +0000 Subject: [PATCH] Pin backend to d2bb936 for the dual-speed slow-lane observability merge Why: Backend #125 (background subagent inbox card lifecycle, delegate/base-method dual-speed guidance, #background mock demo) merged into component main; the Dev gitlink must move to the merged head for the combo to build with it. Evidence: Backend PR #125 CI green (ci/vet-and-test on 43087a7); Dev-level make test to be rerun on the committed pin (previous run failed only the drift check that expects exactly this commit). Impact: modules/backend gitlink 421fee8 -> d2bb936; no other component moves. Refs: Backend PR #125; task card feature/dual-speed-tasks. --- modules/backend | 2 +- 1 file changed, 1 insertion(+), 1 deletion(-) diff --git a/modules/backend b/modules/backend index 421fee81..d2bb9367 160000 --- a/modules/backend +++ b/modules/backend @@ -1 +1 @@ -Subproject commit 421fee81c314c05530bc809e224b5d0818ec3472 +Subproject commit d2bb9367843a3202b43fc37b064af292b2f23e27