From bbd9d04cd40abc5f82bc13b6f1b1f36e53ac143e Mon Sep 17 00:00:00 2001 From: weichen Date: Fri, 23 Oct 2026 04:49:53 +0000 Subject: [PATCH] Record the lifecycle re-verification covering increment D MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit Why: the rdm.pin upgrade merged via #715; the lifecycle suite rerun now exercises the increment D delivery through the real pipeline. Evidence: receipt w12-lifecycle-increment-d-green.json — 40 tests OK (skipped 1), exit 0 against pin 9176476b after the documented schema reset of the reused PG instance. Impact: Task card only. Refs: PR #715; RDM #477 --- .task/feature-rdm-two-trees-followup-d-w11-w12.md | 1 + 1 file changed, 1 insertion(+) diff --git a/.task/feature-rdm-two-trees-followup-d-w11-w12.md b/.task/feature-rdm-two-trees-followup-d-w11-w12.md index b9f10239..80dd25bd 100644 --- a/.task/feature-rdm-two-trees-followup-d-w11-w12.md +++ b/.task/feature-rdm-two-trees-followup-d-w11-w12.md @@ -105,6 +105,7 @@ - RDM 候选 800edbe:`make test` 17 包全绿;`make product-smoke` PASS(root=React/未认证 401/7×rdm.inspect.* enabled,合成凭据)。 - `make test-lifecycle`(SVC_RDM_SRC_DIR=RDM 增量 D 工作区 + SVC_REAL_RDM_BIN=product @800edbe):套件运行但失败——pin_build NOT_RUN(RDM 源目录缺 pin-build-digests.txt,生成器待考)、登录/rdm.ping NOT_RUN(账户方案 U7/U5 依赖,设计内)、真实组合用例未通过(失败明细见收据 ~/.cache/agent-system-dev/agent-exec-receipts/w12-lifecycle-attempt.json,输出含 41 位笔误 pin 目标 SHA 的记录属 W9 历史非本仓)。**已修复并绿**:根因=复用 PG 库内上一轮残留身份行(instance_id 不匹配被正确拒绝);`psql "$DSN" -c "DROP SCHEMA public CASCADE; CREATE SCHEMA public;"` 重置后套件全绿(40 tests OK/skipped 1,exit 0,25 分钟;收据 ~/.cache/agent-system-dev/agent-exec-receipts/w12-lifecycle-green.json)。登录/rdm.ping 保持设计内 NOT_RUN。 +- **lifecycle 复验含增量 D 通过**:rdm.pin 升级 PR #715 合入(3dae91ec,sha=9176476b 增量 D 交付版);套件重跑前重置复用 PG schema(残留身份行 fail-closed 拒绝为已知行为,重置程序=psql "$DSN" DROP/CREATE SCHEMA public);40 tests OK/skipped 1(exit 0,14 分钟;收据 ~/.cache/agent-system-dev/agent-exec-receipts/w12-lifecycle-increment-d-green.json)。 - 待办:auth-on 浏览器矩阵、模型 A/B(预算 0/48 未动)。 ## 阶段 6 评审包(2026-10-22)