Commit Graph
6 Commits
Author SHA1 Message Date
weichen 4577b0d6f2 Connect the project entrypoint to the planning index candidate
Why: make existing directions, milestones and tasks discoverable with their evidence boundaries.

Evidence: all 19 proposals are covered, 55 PR records were checked, and make test passed on the staged combination; original SELF receipts are preserved.

Impact: local documentation candidate only; the Documents candidate includes the N2 proposal already on Documents main, with Dev PR 244 coordination still recorded.

Refs: .task/feature-planning-index.md; Documents b87b929; PROJECT.md
2026-10-07 13:51:30 +00:00
weichen 908504e8b5 Connect long-term plans to task completion
Why: preserve project direction across tasks and require grounded next-task recommendations.

Evidence: the generated task-card regression fails before the template update and passes afterward; original SELF receipts are in the task card.

Impact: document the planning entrypoint and extend task records without granting new-task execution rights.

Refs: .task/feature-goal-continuity.md; policy/delivery.md
2026-10-07 06:10:51 +00:00
weichen 8af945a1d5 Make development gates preserve work and verifiable evidence
Why: cleanup, component synchronization, receipt recording and credential handling could contradict the documented development boundaries.

Evidence: SELF 75 isolated governance tests and source checks are captured in .task/feature-governance-reliability.md; combination and CI verification follow.

Impact: hardens local task and CI tooling, aligns policy and component documentation, and adds continuous regression tests without changing product behavior.

Refs: .task/feature-governance-reliability.md; policy/governance.md; policy/platform-admission.md
2026-10-05 12:36:02 +00:00
weichenandCursor 978bf8bdae Check nested library pins and test the three agent libraries
Why: Dev could ship a combination whose nested gitlinks differed from the top-level pins, and make test never ran the three agent libraries.
Evidence: A go.work was measured and not adopted: workspace MVS selected newer golang.org/x crypto, exp, net, term, and text than backend with GOWORK=off. check-pins passes on the new pins and fails when backend's squad pin is 5cbac00.
Impact: make test adds pin checks and GOWORK=off vet/test for intent, native, and squad. make build still compiles inside backend; the pin check requires those gitlinks to match Dev.
Refs: R0
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-03 02:10:00 +00:00
weichen 15f0da6374 Wire Agent-System-UI and Agent-Command into the Dev combo
Why: Foundation task T0 of the UI/interaction base (proposal 2026-09-30,
  D25-D33): add the new UI component library and command-bus ecosystem repos,
  extend build/test/pin orchestration to twelve submodules.

Evidence: make test green on the pinned combo (core + backend 13 pkgs +
  frontend 9 + ui 6 tests); make build produces bin/agent-system with combo
  version string including ui; make contracts now generates to frontend and ui
  with submodules staying clean; renderer/tokens migration verified
  CSS-rule-identical (zero behavior change).

Impact: New modules/ui and deps/agent-command gitlinks; frontend consumes ui
  via source alias; backend vendors agent-command (replace only, no import
  yet); follows provider-first merges (ui PR#1/#2, agent-command PR#1,
  documents PR#8, frontend PR#2, backend PR#6).

Refs: modules/documents docs/proposals/2026-09-30-ui-inbox-command-workspace.md
2026-09-30 05:56:08 +00:00
weichen 6eaa9b6bea Assemble the dev integration repo: submodules, cross-repo Makefile, and repo guides
Details (original message):
Assemble the dev integration repo: submodules, cross-repo Makefile, and repo guides.
2026-09-29 17:31:39 +00:00