Why: The index branch was synced onto backend main after the interpreter merge, so the parent gitlink must follow that tip.
Evidence: Backend main 42fe619 contains 34be855, and go test of tools and runmgr passed on that tip.
Impact: Dev gitlink only. The write guard and text index stay, and the interpreter files remain in the pinned tree.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Backend/pulls/34
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: pseudo-binary Office writes and unsearchable generated documents
were the two pieces of the closed docx PR that main still needs.
Evidence: backend 3e5699c; go test ./... 19 packages ok. Dev #99 and
Backend #27 are closed as superseded.
Impact: gitlink only. Merge after Dev #113 so the refusal text names
tools that are already on main.
Refs: task feature/binary-doc-index
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the preview sniff branch predated the shell redesign and could not
merge. Module gitlinks now include current main plus ZIP fallback for
docx, xlsx, and pptx.
Evidence: conflict was only the shared sync-log card; both sides' rows
kept. UI and Frontend tests passed on the updated module SHAs.
Impact: parent branch contains origin/main. .mimosa/ ignore stays.
Refs: task feature/preview-sniff-fallback, Dev PR #96
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the open preview-sniff PRs were cut before the shell redesign, so
they could not merge. UI and Frontend now contain origin/main plus the
ZIP sniff, including xlsx and pptx text fallback.
Evidence: UI vitest 68 and tsc clean; Frontend vitest 40 and tsc clean.
UI pulls/21 and Frontend pulls/22 updated.
Impact: gitlinks only. Dev still needs to merge origin/main before the
parent PR can land.
Refs: task feature/preview-sniff-fallback
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the deliverable workflow prompts call run_shell and run_python, but
those tools were not in the registered binary, so generation fell back
to text-only write_artifact.
Evidence: backend feature/exec-interpreters 2880b58; go test ./... 19
packages ok in modules/backend.
Impact: Dev gitlink moves to the interpreter commit. Merge the backend
PR before this one so the recorded SHA is on backend main.
Refs: task feature/exec-interpreters
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the card was folded into PR #109 already marked complete, so
task-close skipped it; archive it manually per the no-open-cards rule
and advance the frontend gitlink past the mimosa-ignore chore (#26).
Evidence: .task has no deliverable-docx-r1.md left; precheck [cards]
to be re-run after merge; frontend -> de38791 (chore #26 merged).
Impact: housekeeping only; no code paths touched.
Refs: task feature/deliverable-docx-r1 (PR #109), frontend PR #26
Why: users received plain-text .docx files and had to dig through the
process collapse or workspace panel to find deliverables; deliverables
must appear directly in the conversation and open with real formatting.
Evidence: module PRs merged — Agent-System-Backend#31 (docgen Markdown
to styled OOXML, write_docx tool, artifact_ref pinned as content after
final text, prompt routing, mock #doc dogfood) and
Agent-System-Frontend#25 (deliverable card renderer, live projection
pinned tail). Combination `make test` green in this worktree: backend
go test 19 pkgs, frontend vitest 40/40 + tsc clean, ui tsc + vitest
68/68 incl design-guard, agent-command ok. Task card records scope,
sync nodes and leftovers.
Impact: gitlinks backend -> 8550bb0, frontend -> b048d90; core/ui
unchanged.
Refs: task feature/deliverable-docx-r1
Why: Submodule branches merged their origin/main (CF3) and were pushed;
record the new heads so the parent sync merges cleanly.
Evidence: submodules green post-merge (ui 68 / frontend 39 tests, tsc
clean); parent task-sync re-run follows this commit.
Impact: gitlinks only.
Refs: task feature/ui-tokens-v3.
Why: Land phase 4 of the UI redesign in the parent repo: ToolBlock chat
contract, Collapsible migration of all folds, live sweep with worked-time,
and the honest in-progress input hint. Completes the four-phase plan on
this branch (deviation recorded in the task card).
Evidence: combined make test -> go core/backend/agent-command ok, frontend
39 vitest passed, ui 66 vitest passed; tsc clean in both submodules.
Impact: modules/ui and modules/frontend gitlinks move to their
feature/ui-tokens-v3 heads; task card records results and remaining items.
Refs: task feature/ui-tokens-v3.
Why: Land phase 3 of the UI redesign in the parent repo.
Evidence: frontend submodule commit on feature/ui-tokens-v3; tsc -b and
38 vitest tests pass; task card records the runs.
Impact: modules/frontend gitlink moves; no API changes.
Refs: task feature/ui-tokens-v3.
Why: Land phase 2 of the UI redesign in the parent repo: admin-only
full-screen system management, conversation-first sidebar, role-aware
workspace shortcuts.
Evidence: frontend submodule commit on feature/ui-tokens-v3; tsc -b and
38 vitest tests pass in the submodule; combined make test re-run recorded
at phase boundaries in the task card.
Impact: modules/frontend gitlink moves; no API or contract changes.
Refs: task feature/ui-tokens-v3.
Why: The approved frontend redesign requires a durable design constitution
so future UI work stays consistent (user directive: make this project's
standing design guidance, four principles: beautiful/modern/concise/usable).
DESIGN.md encodes the Zai-calibrated rules (surface ladder, type scale,
radius nesting, MotionKit recipes, ToolBlock contract, IA principles) and
AGENTS.md adds a mandatory UI gate; submodules land phase 1 (tokens v3,
MotionKit, Collapsible, panel layout, mono primary buttons).
Evidence: make test in this worktree -> frontend 38 passed (incl. new
host design-guard ratchet), ui 61 passed (incl. collapsible + design-guard),
go core/backend/agent-command ok. precheck READY at R0 0be23f9a4d.
Impact: gitlinks advance to Agent-System-UI/Agent-System-Frontend
feature/ui-tokens-v3 heads; AGENTS.md gains a UI section; no backend or
contract changes.
Refs: session-approved redesign plan v2 (8 decisions recorded in task card).
Why: CF-A lands in backend (ctxasm backfill + facade cards) and documents.
Evidence: backend commit recorded in module log; combination make test in
task card.
Impact: gitlink-only.
Why: CF-S (D44/D45) implementation lands in backend and documents; Dev
tracks the tested combination.
Evidence: backend 24a2873 (tools+cardsvc+runmgr+mock+tests), documents
3d2da4e (usage guide); combination make test recorded in task card.
Impact: gitlink-only on Dev.
Refs: documents 2026-09-30-card-stream-artifact-unify-project-inbox.md (D44/D45).
Why: track 2 of the fake-docx remediation — read-only preview fallback for
stock text-masquerading docx artifacts; also ignore the Mimosa plugin's
per-session .mimosa state dir that kept dirtying the tree and blocking precheck.
Evidence: modules/ui 83367f7 (doc->binary dispatch + readable Office error),
modules/frontend cd77340 (PK magic sniff + markdown fallback); make test-ui
49/49, make test-frontend 33/33, frontend tsc --noEmit clean.
Impact: parent pins move to the two submodule branches; .gitignore gains
.mimosa/; no code outside those modules.
Refs: .task/feature-preview-sniff-fallback.md
Why: two strands land together — (1) the remaining 20 module-level govulncheck advisories against x/crypto v0.37.0 clear to the upstream floor via Backend#25 (19 fixed, GO-2026-5932 unfixed upstream); (2) backend main (daddac8) and core main (cafd9a5) from the parallel cardflow merge were not yet pinned, and backend main no longer built against the Dev-pinned core — pinning the coherent pair keeps main verifiable.
Evidence: combined make test exit 0 at backend daddac8 + core cafd9a5 (backend packages ok, frontend 33/33, ui 37/37, agentcmd ok); backend go test green and govulncheck 0 affected / 0 import-level / 1 module-level; task.sh hardening smoke-verified (drift measurement, identity probe, abandon cleanup all PASS).
Impact: two gitlink pins + task card; no Dev-repo source change; remote branch hygiene (55 merged branches deleted) and global git identity were environment fixes outside the repo.
Refs: .task/fix-followup-hardening.md, Backend PR #25
Why: Dev gitlinks lagged behind merged module mains (backend fa494c3,
frontend b067b57, documents f0361f38, plus deps advances); the integrated
build should track each repo's main.
Evidence: make pin advanced all listed submodules; make test exit 0
(frontend 33/33, ui 37/37, backend go test all ok, agent-command ok).
Impact: gitlink bumps only, no source changes.
Refs: housekeeping after chat-process-split-r1 (PR #79)
Why: PR #73 merged a branch whose worktree carried stale submodule
pointers, regressing modules/{backend,documents,frontend,ui} on main to
pre-#71 commits; documents also advanced with the file-preview proposal
(PR #23).
Evidence: submodule status now matches each module's main tip
(backend 239cf76, documents 5882448+, frontend fb219e0, ui efa6c69,
core fd44179 unchanged); make test combo verification green.
Impact: composed checkout sees the merged chat-order and proposal work
again; no source changes in this repo beyond pointers and the task card.
Refs: task feature/file-preview-proposal.
Why: the origin/main merge recorded a stale ui pointer (c7564791); this
branch verifies against efa6c69 (ui main), which carries the icons the
merged frontend needs.
Evidence: git submodule status shows checkout efa6c69 (ui origin/main);
frontend tsc -b exit 0 and vitest 33/33 against it.
Impact: gitlink update only.
Refs: feature/chat-process-split-r1
Why: frontend 6483757 fixes the tsc breakage left by the main merge and
ports artifact events onto the items stream.
Evidence: tsc -b exit 0; vitest 33/33.
Impact: gitlink update only.
Refs: feature/chat-process-split-r1
Why: card must carry result and verification state before review.
Evidence: targeted behavior checks recorded in the card; bash -n passed.
Impact: documentation only.
Refs: feature-gitea-access-facts
Why: task-sync requires a clean tree; both submodule branches now carry
merges of their respective mains (backend 9e694c0, frontend 765789f).
Evidence: git submodule status shows the new SHAs; backend go test ./...
ok after its merge; frontend vitest 32/32 after its merge.
Impact: gitlink update only.
Refs: feature/chat-process-split-r1
Why: the review of feature/chat-process-split-r1 required untracking the
frontend node_modules symlink, per-turn interleaving of live parts with
tool-call-driven process marking, a long-reply excerpt, and marking
artifact_ref parts as process in the backend.
Evidence: frontend 22a8723 (untrack symlink) + 754ce83 (interleave and
mark); backend ae8e5d0 (artifact process). make test green: frontend
27/27, ui 35/35, backend go test ./... ok.
Impact: parent task branch now points at the reviewed submodule commits;
ready for PR.
Refs: code review of feature/chat-process-split-r1 (2026-09-30)
Why: make contracts regenerates modules/ui/src/contracts.ts from Core
as authority; the mirror commit (UI PR #15) must be pinned or the
combined tree stays dirty after make test.
Evidence: UI PR #15 merged on ui main; make test re-run on this tree
below.
Impact: gitlink-only change.
Refs: Core PR #6; UI PR #15; Dev task feature/cross-session-reading.
Why: integrate the approved cross-session reading feature (proposal +
core contract + backend gate/tools/UI) into the Dev composition.
Evidence: subrepo PRs all merged on their mains — Documents #21
(bf0988b), Core #6 (fd44179), Backend #18 (cb7f79d), Frontend #16
(9c87953); combined make test to follow on this exact tree before the
Dev PR is requested.
Impact: gitlink-only change plus task card; no Dev-repo code touched.
Refs: modules/documents/docs/proposals/2026-09-30-cross-session-reading.md;
task card .task/feature-cross-session-reading.md.
Why: R-platform spans core/ui/frontend/documents; also honors the
agreed housekeeping item — .env.dev must be gitignored (it holds live
API keys).
Evidence: make test full suite green on this head (exit 0); headless
walk on the real binary: avatar columns, settings shell with badges,
admin-row avatars, zero console errors.
Impact: capability layer only, no behavior changes. Merge order:
core -> ui -> frontend -> documents -> this PR.
Refs: proposal 2026-09-30-ui-redesign-and-auth.md (capability platform)