Why: Dev has to record the library commits the product now builds against.
Evidence: make test
Impact: runtime.entry stays direct. This commit only moves gitlinks.
Refs: feature/native-squad-full-upgrade
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The product needs the new content rules and the optional squad entry, while the library pins must match the kernel and router those paths compile against.
Evidence: Backend go test ./... -count=1 passed on 268f4a9. runtime.entry stays direct because no paired live scores exist.
Impact: Dev now points at the quality and squad-entry backend, agent-native cfc840c, and agent-squad d38f838. make eval-deliverables runs the scorecard tests.
Refs: deliverable-quality-system
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The deliverable standards landed in Agent-System-Backend and were
merged, so the Dev pin has to move to that commit before this branch
can be reviewed.
Evidence: Backend PR #38 merged as 2079b2dfa851bd4cbe8f399a015126c842c441ec.
make test passed on this worktree before the pin move; the pin itself
does not change Dev source.
Impact: modules/backend now points at the merged standards. No other
submodule moved.
Refs: feature/agent-professional-deliverables
https: //git-home.u1680832.nyat.app:30319/weichen/Agent-System-Backend/pulls/38
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: Main moved the backend pin to the B10 assembly after this branch
was opened, so the Dev pin has to follow the merged backend branch.
Evidence: modules/backend is b1fa89b, which contains origin/main and
the timeline changes. No other path conflicted.
Impact: This branch contains current main. The backend gitlink is the
merged feature tip.
Refs: feature/chat-timeline-preview
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: Backend PR #36 closes the three open B10 sub-items (MCP config
injection, subagent bridge, explicit roles, skill-borne recipes); the
parent repo pins the new backend head.
Evidence: backend go vet + go test 21 packages ok; Dev make test all
green (core + backend 21 + frontend 42 + ui 68 + agent-command);
task card filled with per-item evidence.
Impact: modules/backend gitlink bump only; task card updated.
Refs: .task/feature-full-agent-b10-r2.md; Backend PR #36.
Why: Acceptance has to include the latest main, including the
agent-native kernel pin that landed in backend.
Evidence: Backend merge ca8aa5d contains both parents. go test passed
for runtime, tools, and squadadapter.
Impact: This branch now contains origin/main. The backend feature
branch includes that kernel pin.
Refs: feature/chat-timeline-preview
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The design system still described preview as a right-rail tab,
while the implementation now keeps a timeline in the transcript and
opens files in a closable pane beside the chat.
Evidence: make test passed (core, backend, frontend 51, ui 71, agent-command).
Impact: Dev pins core d437530, backend dab8f31, ui 8bfe8a8, frontend 0ed8ad3.
DESIGN.md §6, §9.3, and §9.6 match that layout.
Refs: feature/chat-timeline-preview
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the settled direction requires a complete agent kernel (web
search, code tooling, system tools, external tool calls, skills,
prompts) fused with squad orchestration; the three sub-repos landed
their batches and this bumps the gitlinks and records the task card.
Evidence: Agent-Native PR #3 (go vet + go test 15 pkgs ok), Agent-Squad
PR #3 (6 pkgs ok), Backend PR #35 (19 pkgs ok after rebasing onto the
concurrently merged #34); Dev make test all green (core + backend 19 +
frontend vitest 40 + ui vitest 68 + agent-command).
Impact: deps/agent-native -> f9ab2ef, deps/agent-squad -> 9a402e4,
modules/backend -> 87a3d0d; task card filled with per-PR evidence and
remaining-item notes (sandbox honesty, injection surfaces,
progressive enablement, deployment validation pending).
Refs: .task/feature-full-agent-r1.md batches B1-B10.
Why: The empty-create branch was synced onto frontend main after the input queue landed, so the parent gitlink must follow that tip.
Evidence: The synced tip 0cc0f40 is on frontend main, and vitest reported 42 passed with the default-project path still present.
Impact: Dev gitlink only.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Frontend/pulls/29
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The input-queue branch was synced onto frontend main after the preview fallback landed, so the parent gitlink must follow that tip.
Evidence: Frontend main ba52fad contains aad5871, and vitest reported 42 passed on that tip.
Impact: Dev gitlink only. The queue and files tab stay, and the preview sniff changes remain in the pinned tree.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Frontend/pulls/28
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The index branch was synced onto backend main after the interpreter merge, so the parent gitlink must follow that tip.
Evidence: Backend main 42fe619 contains 34be855, and go test of tools and runmgr passed on that tip.
Impact: Dev gitlink only. The write guard and text index stay, and the interpreter files remain in the pinned tree.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Backend/pulls/34
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The first click on 新建任务 did nothing useful when the workspace had no project.
Evidence: Frontend 288d3ac; tsc -b passed and vitest reported 40 passed. A browser check on the dev server created 默认项目 and a conversation on the first click, and a second click added a conversation without a second project.
Impact: Dev gitlink only. Backend is unchanged.
Refs: modules/frontend fix/empty-create-task
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: follow-up messages were rejected while a run was in flight, and
the file list was only available from the workspace overlay.
Evidence: frontend 3c81525; tsc clean; vitest 42 tests.
Impact: gitlink only. Backend conversation serialization is unchanged.
Refs: task feature/input-queue
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: pseudo-binary Office writes and unsearchable generated documents
were the two pieces of the closed docx PR that main still needs.
Evidence: backend 3e5699c; go test ./... 19 packages ok. Dev #99 and
Backend #27 are closed as superseded.
Impact: gitlink only. Merge after Dev #113 so the refusal text names
tools that are already on main.
Refs: task feature/binary-doc-index
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the preview sniff branch predated the shell redesign and could not
merge. Module gitlinks now include current main plus ZIP fallback for
docx, xlsx, and pptx.
Evidence: conflict was only the shared sync-log card; both sides' rows
kept. UI and Frontend tests passed on the updated module SHAs.
Impact: parent branch contains origin/main. .mimosa/ ignore stays.
Refs: task feature/preview-sniff-fallback, Dev PR #96
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the open preview-sniff PRs were cut before the shell redesign, so
they could not merge. UI and Frontend now contain origin/main plus the
ZIP sniff, including xlsx and pptx text fallback.
Evidence: UI vitest 68 and tsc clean; Frontend vitest 40 and tsc clean.
UI pulls/21 and Frontend pulls/22 updated.
Impact: gitlinks only. Dev still needs to merge origin/main before the
parent PR can land.
Refs: task feature/preview-sniff-fallback
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the deliverable workflow prompts call run_shell and run_python, but
those tools were not in the registered binary, so generation fell back
to text-only write_artifact.
Evidence: backend feature/exec-interpreters 2880b58; go test ./... 19
packages ok in modules/backend.
Impact: Dev gitlink moves to the interpreter commit. Merge the backend
PR before this one so the recorded SHA is on backend main.
Refs: task feature/exec-interpreters
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: the card was folded into PR #109 already marked complete, so
task-close skipped it; archive it manually per the no-open-cards rule
and advance the frontend gitlink past the mimosa-ignore chore (#26).
Evidence: .task has no deliverable-docx-r1.md left; precheck [cards]
to be re-run after merge; frontend -> de38791 (chore #26 merged).
Impact: housekeeping only; no code paths touched.
Refs: task feature/deliverable-docx-r1 (PR #109), frontend PR #26
Why: users received plain-text .docx files and had to dig through the
process collapse or workspace panel to find deliverables; deliverables
must appear directly in the conversation and open with real formatting.
Evidence: module PRs merged — Agent-System-Backend#31 (docgen Markdown
to styled OOXML, write_docx tool, artifact_ref pinned as content after
final text, prompt routing, mock #doc dogfood) and
Agent-System-Frontend#25 (deliverable card renderer, live projection
pinned tail). Combination `make test` green in this worktree: backend
go test 19 pkgs, frontend vitest 40/40 + tsc clean, ui tsc + vitest
68/68 incl design-guard, agent-command ok. Task card records scope,
sync nodes and leftovers.
Impact: gitlinks backend -> 8550bb0, frontend -> b048d90; core/ui
unchanged.
Refs: task feature/deliverable-docx-r1
Why: Submodule branches merged their origin/main (CF3) and were pushed;
record the new heads so the parent sync merges cleanly.
Evidence: submodules green post-merge (ui 68 / frontend 39 tests, tsc
clean); parent task-sync re-run follows this commit.
Impact: gitlinks only.
Refs: task feature/ui-tokens-v3.
Why: Land phase 4 of the UI redesign in the parent repo: ToolBlock chat
contract, Collapsible migration of all folds, live sweep with worked-time,
and the honest in-progress input hint. Completes the four-phase plan on
this branch (deviation recorded in the task card).
Evidence: combined make test -> go core/backend/agent-command ok, frontend
39 vitest passed, ui 66 vitest passed; tsc clean in both submodules.
Impact: modules/ui and modules/frontend gitlinks move to their
feature/ui-tokens-v3 heads; task card records results and remaining items.
Refs: task feature/ui-tokens-v3.
Why: Land phase 3 of the UI redesign in the parent repo.
Evidence: frontend submodule commit on feature/ui-tokens-v3; tsc -b and
38 vitest tests pass; task card records the runs.
Impact: modules/frontend gitlink moves; no API changes.
Refs: task feature/ui-tokens-v3.
Why: Land phase 2 of the UI redesign in the parent repo: admin-only
full-screen system management, conversation-first sidebar, role-aware
workspace shortcuts.
Evidence: frontend submodule commit on feature/ui-tokens-v3; tsc -b and
38 vitest tests pass in the submodule; combined make test re-run recorded
at phase boundaries in the task card.
Impact: modules/frontend gitlink moves; no API or contract changes.
Refs: task feature/ui-tokens-v3.
Why: The approved frontend redesign requires a durable design constitution
so future UI work stays consistent (user directive: make this project's
standing design guidance, four principles: beautiful/modern/concise/usable).
DESIGN.md encodes the Zai-calibrated rules (surface ladder, type scale,
radius nesting, MotionKit recipes, ToolBlock contract, IA principles) and
AGENTS.md adds a mandatory UI gate; submodules land phase 1 (tokens v3,
MotionKit, Collapsible, panel layout, mono primary buttons).
Evidence: make test in this worktree -> frontend 38 passed (incl. new
host design-guard ratchet), ui 61 passed (incl. collapsible + design-guard),
go core/backend/agent-command ok. precheck READY at R0 0be23f9a4d.
Impact: gitlinks advance to Agent-System-UI/Agent-System-Frontend
feature/ui-tokens-v3 heads; AGENTS.md gains a UI section; no backend or
contract changes.
Refs: session-approved redesign plan v2 (8 decisions recorded in task card).
Why: CF-A lands in backend (ctxasm backfill + facade cards) and documents.
Evidence: backend commit recorded in module log; combination make test in
task card.
Impact: gitlink-only.
Why: CF-S (D44/D45) implementation lands in backend and documents; Dev
tracks the tested combination.
Evidence: backend 24a2873 (tools+cardsvc+runmgr+mock+tests), documents
3d2da4e (usage guide); combination make test recorded in task card.
Impact: gitlink-only on Dev.
Refs: documents 2026-09-30-card-stream-artifact-unify-project-inbox.md (D44/D45).
Why: track 2 of the fake-docx remediation — read-only preview fallback for
stock text-masquerading docx artifacts; also ignore the Mimosa plugin's
per-session .mimosa state dir that kept dirtying the tree and blocking precheck.
Evidence: modules/ui 83367f7 (doc->binary dispatch + readable Office error),
modules/frontend cd77340 (PK magic sniff + markdown fallback); make test-ui
49/49, make test-frontend 33/33, frontend tsc --noEmit clean.
Impact: parent pins move to the two submodule branches; .gitignore gains
.mimosa/; no code outside those modules.
Refs: .task/feature-preview-sniff-fallback.md
Why: two strands land together — (1) the remaining 20 module-level govulncheck advisories against x/crypto v0.37.0 clear to the upstream floor via Backend#25 (19 fixed, GO-2026-5932 unfixed upstream); (2) backend main (daddac8) and core main (cafd9a5) from the parallel cardflow merge were not yet pinned, and backend main no longer built against the Dev-pinned core — pinning the coherent pair keeps main verifiable.
Evidence: combined make test exit 0 at backend daddac8 + core cafd9a5 (backend packages ok, frontend 33/33, ui 37/37, agentcmd ok); backend go test green and govulncheck 0 affected / 0 import-level / 1 module-level; task.sh hardening smoke-verified (drift measurement, identity probe, abandon cleanup all PASS).
Impact: two gitlink pins + task card; no Dev-repo source change; remote branch hygiene (55 merged branches deleted) and global git identity were environment fixes outside the repo.
Refs: .task/fix-followup-hardening.md, Backend PR #25
Why: Dev gitlinks lagged behind merged module mains (backend fa494c3,
frontend b067b57, documents f0361f38, plus deps advances); the integrated
build should track each repo's main.
Evidence: make pin advanced all listed submodules; make test exit 0
(frontend 33/33, ui 37/37, backend go test all ok, agent-command ok).
Impact: gitlink bumps only, no source changes.
Refs: housekeeping after chat-process-split-r1 (PR #79)
Why: PR #73 merged a branch whose worktree carried stale submodule
pointers, regressing modules/{backend,documents,frontend,ui} on main to
pre-#71 commits; documents also advanced with the file-preview proposal
(PR #23).
Evidence: submodule status now matches each module's main tip
(backend 239cf76, documents 5882448+, frontend fb219e0, ui efa6c69,
core fd44179 unchanged); make test combo verification green.
Impact: composed checkout sees the merged chat-order and proposal work
again; no source changes in this repo beyond pointers and the task card.
Refs: task feature/file-preview-proposal.