Commit Graph
3 Commits
Author SHA1 Message Date
weichenandCursor e8f84b8cf1 Add a reversible release switch and a lifecycle pin
Why: an update that stops the old process and overwrites the binary cannot
get the previous version back, and a migration the old binary cannot read
must be refused before that stop. CI also had no fixed RDM SHA to build from.
Evidence: python3 -m unittest tests.test_svc_identity tests.test_svc_recover tests.test_svc_deploy_txn tests.test_lifecycle_pin passed. make test-lifecycle exits 2 when AGENT_PG_TEST_DSN is unset.
Impact: installs land in releases/<rid> and current switches with mv -T.
Deploy keeps the desired state and rolls back a non-terminal journal.
Schema compatFloor above the installed target is refused unless
--migrate-schema --confirm is paired with a backup. test-lifecycle fails
closed without PostgreSQL and an RDM checkout. Login stays NOT_RUN.
Refs: recovery plan r3.1 D2 and D3; Backend feature/d1-identity-open

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 14:43:27 +00:00
weichenandCursor a5d44df505 Clear must_change before API-key use in multi-instance U7
ci / test-pg (pull_request) Successful in 1m28s
ci / test (pull_request) Successful in 3m7s
Why: Backend login_keys gate blocks Key traffic while
must_change_password is set; U7 failed on PUT settings/user 403.
Evidence: go test -c multi-instance compiles; CI test-pg will GATE.
Impact: loginAlice does session password change alicePass0→alicePass.
Refs: Dev PR #426; Backend #170 pin e7b70c2

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 05:24:02 +00:00
weichen f705f99b8f Add U7 two-process acceptance, k6 load harness and release checklist
Why: collaboration storage U7 (proposal sections 3/5/7) requires two-process
HTTP-level acceptance over shared PG, a reproducible load-test entry honoring
the load contract, and an auditable pre-release checklist; capacity windows and
dual-host runs need user-scheduled resources, so the deliverable here is the
verifiable entry, not capacity claims.
Evidence: make test green (composite); make test-multi-instance green locally
against an isolated PG (five scenarios incl. crash-takeover and restart
invariants); run_load.sh --profile smoke end-to-end green (SSE probe p95~18ms,
zero seq duplicates, stack auto-recycled); backend pinned to feature branch
with the three cross-instance fixes.
Impact: new tests/integration/multi-instance (CI test-pg job step), new
tests/load/collaboration (k6 + SSE probe + run_load.sh), release checklist at
docs/release-multi-instance.md; no runtime behavior change in Dev repo itself.
Refs: backend PR #164; task card feature/u7-load-fault-release.
2026-10-12 02:31:35 +00:00