Commit Graph
58 Commits
Author SHA1 Message Date
weichen c256558ca8 Record approved DHF implementation progress
Why: Keep the planning index aligned with the approved scope and actual U1 results.

Evidence: The RDM branch saved the 44-asset catalog and E1 receipts; exact candidate fidelity remains under human review.

Impact: Documentation status only; no template is published and no runtime behavior changes here.

Refs: DHF plan r0.1; RDM feature/dhf-template-assets@6af4497
2026-10-14 03:21:21 +00:00
weichen 8e9587ca1d Preserve the approved DHF integration plan
Why: Keep the owner-reviewed scope and asset evidence available for implementation.

Evidence: Plan review and SELF document/source receipts are recorded in the Dev task card.

Impact: Documentation and asset inventory only; no product behavior changes.

Refs: DHF plan r0.1; owner approval to begin implementation
2026-10-14 01:52:56 +00:00
weichen 30bceb748f Align IAM contract navigation with accepted delivery stage
Why: Remove stale local-review and pending-acceptance statements after user confirmation.

Evidence: Independent stage 8 documentation review identified the status mismatch.

Impact: Update delivery status only; preserve permission semantics and the approved plan digest.

Refs: 2026-10-13 IAM I1 acceptance record; Dev policy/delivery.md.
2026-10-13 15:34:16 +00:00
weichen 1f83bb7ffe Merge remote-tracking branch 'origin/main' into feature/iam-i1-permission-contract 2026-10-13 15:27:22 +00:00
weichen 064d4b5f68 Present the bounded I1 acceptance candidate and evidence gaps
Why: Stage 6 is approved and formal command/API results need a version-bound human acceptance decision.

Evidence: Complete SELF receipts and independent replays are linked to fixed Dev/RDM subjects; the original implementation approval is retained.

Impact: Record test coverage, predicate corrections, immutable product digests and explicitly untested later scopes. Do not mark user acceptance or shipping complete.

Refs: IAM I1 U1-U2; phase 7 acceptance
2026-10-13 14:52:43 +00:00
weichen 8375057829 Merge commit '047d362c72ec2c095ec14e1d2f2d152f94471faf' into feature/iam-i1-permission-contract 2026-10-13 14:21:43 +00:00
weichen 32d6c8487a Merge the authoritative document baseline before delivery
Why: The process-document main branch advanced with project membership and privacy records after this implementation plan was reviewed.

Evidence: origin/main was freshly fetched; the reviewed plan remains the same and the final combined document checks will be replayed on the resulting head.

Impact: Preserve the other task's proposal and index entries alongside the approved merge queue plan, without changing its scope or execution authorization.

Refs: Documents PR #96; origin/main 047d362; independent review docs_delivery_review
2026-10-13 14:20:31 +00:00
weichen 6c096b9360 Record project event privacy and duty replay refinements
Why: Legacy upload events and synced duty flows need the same private-data and current-state guarantees as new member work.

Evidence: Real legacy SSE leakage and independent duty replay findings; correction evidence remains in the canonical task record.

Impact: Describe trusted per-event sharing and durable duty versions without new mandatory downstream interfaces or runtime changes.

Refs: system-project-membership r1.1; Dev feature/project-member-access
2026-10-13 11:06:42 +00:00
weichen b8fcf01062 Record the I1 local implementation candidate and review boundaries
Why: The approved plan needs traceable local progress and explicit capability limitations before human implementation review.

Evidence: The owning task cards retain full local SELF startup, sync, red and green outputs; final combination checks and independent review are pending in this checkpoint.

Impact: Preserve the original approved plan and identify I1 behavior, deferred capabilities and the next separately authorized unit.

Refs: IAM plan r1; I1 U1-U2
2026-10-13 10:39:21 +00:00
weichen 61e0aef39c Specify system project membership and shared knowledge boundaries
Why: Joined members must see one globally named project and keep private conversations and source documents.\n\nEvidence: Proposal links the fixed implementation plan, explicit authorization and task evidence without claiming deployment or CI success.\n\nImpact: Define optional lifecycle extension, identity recovery, private reads and published knowledge for U2/U3/U5.\n\nRefs: Dev feature/project-member-access
2026-10-13 09:56:06 +00:00
weichen 2cc00da9e0 Define the I1 permission and public extension contract
Why: separate protected system actions from project authority and freeze the approved identity and resource boundaries.

Evidence: SELF document check recorded by Dev evidence; approved plan digest retained and fixed-base core rules preserved.

Impact: contract and navigation only; provider implementations, multi-role migration and deployment remain later increments.

Refs: IAM plan r1 U1; Agent-System-Dev feature/iam-i1-permission-boundaries
2026-10-13 09:30:34 +00:00
weichen 652be93a60 Record plan approval and link implementation evidence
Why: preserve the approved plan and point readers to the actual task objects instead of treating historical planning state as current delivery status.

Evidence: user approval of plan r1 and Dev task-card receipts; actual platform activation and real trial remain NOT_RUN.

Impact: plan metadata, test-file organization and navigation only; task state remains authoritative in Dev.

Refs: docs/proposals/2026-10-13-merge-queue-implementation-plan.md; Dev .task/feature-merge-queue-policy-draft.md
2026-10-13 08:22:35 +00:00
weichen ba4044d57e Plan serial delivery windows and compatible task recovery
Why: turn the confirmed scheduling specification into sequenced work with explicit interfaces, evidence handling and admission validation.

Evidence: SELF plan checks verified fixed source commits, 83 relative links, six units and four Python example blocks; implementation and runtime checks remain NOT_RUN.

Impact: reviewable implementation plan and navigation only; no task scripts, workflow, platform settings or business behavior are implemented.

Refs: docs/proposals/2026-10-13-merge-queue-implementation-plan.md; Dev policy/merge-queue.md r1; Development-Guidelines draft.11
2026-10-13 06:40:14 +00:00
weichen 0b290b7461 Record the login recovery implementation as proposal r3
Why: The 2026-10-13 login recovery flow was approved and merged
(Backend #187, Frontend #76, Dev #504); the master proposal must carry
the three adjudications, implementation record, and evidence pointers
per the repo's lineage conventions.

Evidence: Dev #504 HEAD CI (test/test-pg/svc-realcombo) success; browser
acceptance receipts be7ae9a2/b3a9e691 bound to Dev HEAD 268ef29 (SELF).

Impact: r3 is an implementation record only; R/KTD/U numbering semantics
unchanged; U7 explicitly NOT marked complete (atomic bootstrap and CLI
credential delivery remain). INDEX.md status line updated.

Refs: Dev docs/svc-deploy/2026-10-13-login-recovery-contract.md
2026-10-13 04:30:04 +00:00
weichen a73c84b5be Add RDM settings, members, duties and permissions increment plan r1
Why: 固化 2026-10-13 评审通过的 RDM 完善增量方案(承接总案 U3/U4/U6,衔接 U5),含三处技术评审补充与顺序裁定。
Evidence: 方案核查记录见提案文末;源码锚点 Backend settings.go / RDM perms.go, plugin.go / Frontend adminRdmSections.tsx。
Impact: 仅新增提案文档与索引条目,无代码变更。
Refs: 2026-10-12-rdm-function-implementation-plan.md
2026-10-13 03:22:46 +00:00
weichen 8d8600024d Record the approved progressive workbench design and implementation plan
Why: implement a simple workbench for nontechnical users under continuous authorization.

Evidence: current source audit and the reviewed r0.1 prototype; runtime verification remains pending.

Impact: design and plan only; task execution state stays in the Dev task card.

Refs: UI01-UI13 and the existing fast-slow display design r1.1.
2026-10-12 15:03:27 +00:00
weichenandCursor f9d96dfc59 Add fast-slow display design r1.1 and U1 plan
Why: Record approved stage-4 design with R03 splits and U1 exit
whitelist, plus stage-5 U1 implementation plan for review.
Evidence: Document edits only; no runtime verification.
Impact: Documents proposals INDEX; no business code.
Refs: feature/fast-slow-display-design

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 07:31:46 +00:00
weichenandCursor 7df7d786d0 Record r1 approval for svc unified deploy proposal
Why: user approved the proposal and U1/U4 specs and authorized push/PRs
plus U1/U4 implementation start.
Evidence: SELF conversation approval 2026-10-12; implementation still NOT_RUN.
Impact: planning status only.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:32:55 +00:00
weichenandCursor 923537e9a1 Add svc unified deploy and one-time login key proposal r1
Why: capture the reviewed design for binary/source install, env prep,
and passwordless activation via one-time restricted sessions.
Evidence: SELF source review against Dev af9c2de; implementation NOT_RUN.
Impact: Documents planning index only; no runtime change.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:28:37 +00:00
weichen 877d0683cd Add the Generative UI usage guide and U1-U6 evaluation record (final)
Why: The direction closes at U7 - the master record needs its
companion usage guide (enable/generate/revise/act/disable for owners)
and the combined evaluation record covering every landed increment
with its evidence chain and known boundaries.

Evidence: Live E2E on dev@b634a27 (real MiniMax-M3): progress page
presented autonomously, conversation surfaces=2, project aggregation
returns cross-conversation pages under the owner scope; receipts in
Dev task feature/generative-ui-u7-acceptance.

Impact: Documents-only (new guide + index closeout).

Refs: r2 master record; U5 scope r2; Dev task
feature/generative-ui-u7-acceptance
2026-10-12 02:47:27 +00:00
weichen da59ccff04 Track the merged svc-autorecover outcome in the review record and index
Why: between the review round and the approval decision another session completed and merged svc-autorecover (PR #396/#400/#401/#402), so the (a)-decision tracking must reflect the landed slice and the remaining U2 delta.

Evidence: SELF - merged main history c622372 and archived card .task/archive/feature-svc-autorecover.md (10/10 tests, 146/146 governance, CI green on e0b49d1).

Impact: review record, INDEX; proposal r2 body unchanged.

Refs: PR #396 #401
2026-10-12 01:29:31 +00:00
weichen 5a807933c2 Record the r2 approval and the svc-autorecover vehicle decision
Why: the human gate resolved on 2026-10-12 - r2 approved (five stages at once) and option (a) adopted; the review record, proposal index and status navigation must reflect it.

Evidence: SELF - user decision relayed in conversation; stage-review details in the Dev task card; proposal r2 body unchanged (SHA256 9cfda252...).

Impact: review record, INDEX entry; no plan content change.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-12 01:26:50 +00:00
weichen cbc64eb8ab Revise the recovery proposal to r2 with external review findings
Why: absorb the external source-review round - pin the shutdown budget change, close the U1 acceptance gap for program/cwd changes, gate U4 public states on a mapping table, and make the svc-autorecover coordination an explicit human decision.

Evidence: SELF - external review round 2 in the review record; r2 SHA256 9cfda2520b913e6966c68fb3f66fb7bc8382a8f7a2b69cb364122216dcdb72cd; all reviewed claims re-verified against the pinned baselines.

Impact: documents only; four targeted amendments (U1/U3/U4/section 9) plus version bump and INDEX update; requirements and metrics unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:45:09 +00:00
weichen 54fc24e4d5 Add the service restart and recovery proposal r1 with review record
Why: pin the reviewed candidate as a fixed git object before human review (external review P1.1); untracked drafts made check-evidence report unverified.

Evidence: SELF - proposal SHA256 cfc9b768a4596a268810e20101cddc2a6040e24a640e6e34dbda17b838cd45ed matches the review record; source baseline Dev 5e57029b, Backend eb12f102, Core 89f3906c, Frontend aaced879, Documents 23e2276.

Impact: documents repo only; adds proposal r1, six-lens review record and INDEX entry; no implementation, NOT_RUN statuses preserved.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:42:23 +00:00
weichen 2085447701 Record U5 progress and mark U1-U5 implementation complete in the master plan
Why: U5 landed via RDM PR #213 (merge 1dce69d); all five implementation units now complete.

Evidence: RDM PR #213 merged=True.

Impact: plan status + U5 progress + INDEX.

Refs: RDM PR #213
2026-10-11 15:57:13 +00:00
weichen 895a7204b9 Record U4 progress in the two-trees master plan and index
Why: U4 landed via Dev PR #368 (merge 7aa8fd9).

Evidence: Dev PR #368 merged; CI green.

Impact: status line + U4 progress + INDEX only.

Refs: Dev PR #368
2026-10-11 15:07:53 +00:00
weichen b6b6059222 Record the user ruling to gate U6 on owner experience
Why: The U6 precondition (benefit evidence from U4/U5) resolves to the
owner actually using the landed U1-U5 capability - the human usability
comparison marked NOT_RUN since U1 finds its execution path here; the
user ruled 2026-10-11 to evaluate first and decide U6 after.

Evidence: Ruling collected via the session question panel on
2026-10-11; U1-U5 all merged (Dev #329/#336/#345/#351/#367).

Impact: Documents-only (master record U6 gate note + index status).

Refs: r2 U6 clause; Dev task feature/generative-ui-u6-gate-record
EOF
)
2026-10-11 15:01:08 +00:00
weichen aba1d6a3d6 Record the user approval of the U5 action scope
Why: The user ruled on the three questions (categories and ranges
approved as proposed; C-class limited to plugin KV plus task ledger;
confirm UX reuses the inline card); the proposal becomes the approved
scope and unblocks the U5 implementation task.

Evidence: Ruling collected via the session question panel on
2026-10-11; implementation task feature/generative-ui-u5 starts under
policy/delivery.md.

Impact: Documents-only (proposal r2 + index status).

Refs: r2 master record U5; Dev task feature/generative-ui-u5
EOF
)
2026-10-11 14:09:20 +00:00
weichen c7c5f94b64 Propose the U5 action scope for user review
Why: The r2 U5 clause requires a human review of the action scope
before implementation; this draft grounds the decision in the current
command inventory and existing safety machinery.

Evidence: Source facts cited inline (builtin command list with risk
levels, DangerHigh inline-confirm flow with pendingStore, audit
envelope) verified against backend main on 2026-10-11.

Impact: Documents-only (new proposal + index entry); no code changes.

Refs: 2026-10-10-generative-ui-plugin.md (r2 U5); Dev task
feature/generative-ui-u5-scope
2026-10-11 13:50:10 +00:00
weichen a8f1096e78 Record U3 progress in the two-trees master plan and index
Why: U3 landed via RDM PR #201 (merge dbc41b6); the master record must reflect actual progress.

Evidence: SELF U3 closeout doc check exit 0 (receipt in Dev closeout task card).

Impact: proposal status line, U3 progress paragraph, INDEX row only.

Refs: RDM PR #201; Dev feature/rdm-u3-closeout
2026-10-11 13:40:12 +00:00
weichen 9cb09b967c Merge the template/final-target planning branch into main lineage
Why: Dev PR #340 pinned this Documents branch tip while it was never merged into Documents main (cross-repo pin discipline); this reconciliation unifies both planning lineages.

Evidence: merge-base 2a5f658; INDEX conflict resolved as union (U1+U2 progress row + two new plan entries).

Impact: docs only.

Refs: Dev #340
2026-10-11 13:10:38 +00:00
weichen 1673f3cea6 Record U2 progress in the two-trees master plan and index
Why: U2 landed via RDM PR #197 (merge fe8a75b); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF U2 closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #197 merged=True via API.

Impact: proposal status line, U2 progress paragraph, and INDEX row only.

Refs: RDM PR #197; Dev feature/rdm-u2-closeout
2026-10-11 11:22:59 +00:00
weichen 10b0dbe908 Merge the current Documents baseline and preserve both planning entries
Why: retain the newly merged RDM U1 progress alongside the final-target plan.

Evidence: resolved the single index conflict by keeping the updated U1 entry and both new plan links; diff check passed.

Impact: documentation merge only; business validation NOT_RUN.

Refs: docs/proposals/INDEX.md
2026-10-11 08:54:39 +00:00
weichen 6183e99cdb Plan full RDM delivery around shared projects and controlled documents
Why: reconcile the confirmed project, privacy and duty rules with all approved product requirements.

Evidence: current RDM d8d7e743 source review, recorded source receipt, and exact 34 UR/68 SR/10 F matrix checks; business validation NOT_RUN.

Impact: reviewed planning documents only, covering all 69 template types and the existing XLSX asset; no runtime changes.

Refs: docs/proposals/2026-10-11-rdm-final-target-completion.md
2026-10-11 08:54:07 +00:00
weichen 6efdd7dbc7 Record U1 progress in the two-trees master plan and index
Why: U1 landed via RDM PR #195 (merge 05b7d1a); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #195 merged=True via API.

Impact: proposal status line, U1 progress paragraph, and INDEX row only; no scope or requirement change.

Refs: RDM PR #195; Dev feature/rdm-u1-closeout
2026-10-11 08:44:18 +00:00
weichen 90f73ba4e8 Record the confirmed pilot documents and full-catalog direction
Why: preserve the user decision from the previous planning turn before expanding scope.

Evidence: r1.1 records the explicit user response; prior documentation-check receipt is in the Dev task card.

Impact: planning metadata only; no business changes.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:39:47 +00:00
weichen db6daafde4 Plan template-driven document generation through project conversations
Why: connect the existing RDM assets and two-trees model to a reviewable document workflow.

Evidence: source inventory at RDM 0081628a; document structure and local link checks recorded as SELF in the Dev task card; business validation NOT_RUN.

Impact: planning and inventory documents only; no implementation or deployment.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:23:53 +00:00
weichen 76f49b2bc7 Merge authoritative main into the task branch
Why: branch protection requires the head to contain the current base before merge.

Evidence: fetched origin/main=336a90f0ade0ffe049879ca5159a61f0a3948708.

Impact: integrate upstream changes without rewriting task history.

Refs: Documents PR #63
2026-10-11 04:43:23 +00:00
weichen 474955b64d Revise the Generative UI proposal to r2 with the U1 trial results
Why: The U1 controlled trial (three arms on synthetic materials,
MiniMax M3 + M2.7-highspeed, CNY 3 spent of the 200 cap) finished on
2026-10-11; its evidence changes the plan and must live in the master
record: goal-driven structure divergence holds (6/6), generation must
go through tool arguments (text-channel JSON discipline is the floor),
highspeed is rejected as the generator, and the first release keeps the
in-house renderer.

Evidence: Full data and failure taxonomy in Dev task
feature/generative-ui-u1 (.task/genui-u1/report.md, SELF; CI gate on
the Dev PR). Tool-channel and response_format probes recorded there.

Impact: Proposal r1 -> r2 (new results section, catalog/model/channel
revisions); INDEX entry updated. No code or contract changes.

Refs: Dev task feature/generative-ui-u1; Documents PR #60 (r1)
2026-10-11 04:42:37 +00:00
weichen b857595025 Publish the approved two-trees traceability plan r1 with user rulings
Why: the user reviewed and approved the plan (2026-10-11, five stages bundled) and chose a two-tier admin model for KTD4 instead of strict ledger separation.

Evidence: SELF user session rulings recorded in the Dev task card; document-check receipt follows in the task card evidence section.

Impact: proposal r1 and INDEX now record approval and the two-tier admin ruling; no code or deployment change.

Refs: Dev feature/rdm-two-trees-audit-plan
2026-10-11 04:41:29 +00:00
weichen b3171b3d51 Plan RDM project traceability and audit integration
Why: assess existing two-tree and trace-network capabilities and define project-scoped inspection.

Evidence: SELF source receipt and document checks; business and runtime verification were not run.

Impact: pending-review proposal and index only; no product implementation or deployment.

Refs: Dev feature/rdm-two-trees-audit-plan
2026-10-11 04:02:38 +00:00
weichen 95a7c111d5 Add the Generative UI research and plugin proposal r1 with user rulings
Why: The user ruled on 2026-10-11 the three open product choices (first
pilot = full analysis page inside the conversation; enable/disable via a
trusted compiled plugin; U1 trial on MiniMax M3 + M2.7-highspeed with
sanitized materials and a CNY 200 cap), so the proposal now publishes as
the direction's master record instead of a local draft.

Evidence: Doc self-check receipts live in the Dev task card
feature/generative-ui-research; the rulings are recorded in the doc's
"用户裁定记录" section and mirrored in INDEX.md.

Impact: Documents-only change (new proposal + index entry). No runtime,
contract, or code changes; U1 trial start and deployment stay separately
reviewed.

Refs: Dev task feature/generative-ui-research
2026-10-11 03:10:16 +00:00
weichen 228cf74468 Merge authoritative main into the task branch 2026-10-11 02:40:54 +00:00
weichen 0f5df5147e Add the approved collaboration storage and distribution plan r1
Why: freeze the direction for 10-100 user multi-project collaboration storage (PostgreSQL team tier, migration, staged multi-instance) before U1+U2 implementation starts.

Evidence: static review record and SELF audit receipt included; user approval recorded in Dev task card 2026-10-11 (instruction to start the transformation per the plan).

Impact: docs only - new proposal, index entry, review record, audit receipt; no code or runtime change.

Refs: Dev .task/feature-collaboration-storage-plan.md; plan section 5 names U1+U2 as the first increment.
2026-10-11 02:40:02 +00:00
weichen 4a3ca0eb5a Backfill the S0-1 completion in the plan and index 2026-10-11 02:29:16 +00:00
weichen cc54cdac76 Backfill the E4 completion in the plan and index 2026-10-11 01:34:07 +00:00
weichen 077ebdf184 Backfill the E5 MiniMax-family A/B result in the plan and index 2026-10-10 17:27:25 +00:00
weichen 19b77a28bc Backfill the E3 completion in the plan and index 2026-10-10 16:39:02 +00:00
weichen 352b7aa540 Backfill the E1 completion status in the index row too 2026-10-10 09:47:50 +00:00
weichen 3947a12700 Propose the delegation, model-routing and task-sandbox plan
Why: The user asked for a researched design covering subagent use,
tiered model routing (Claude via dmxapi for complex work, MiniMax for
the rest), a millisecond/sub-second task sandbox (record-only), and a
verdict on why the agent still feels weaker than codex/claude-code/kimi.
Why: Four research threads (external frontier survey, subagent/routing
evidence, harness-vs-model attribution, local code audit and probes)
converge on role/stage routing instead of whole-task routing, and on
three corrections to the sandbox assumptions (overlay is not a snapshot;
snapshots defer conflicts to merge time; destroy must follow sealing).

Evidence: Local measurements are SELF receipts in the Dev task card
(bwrap namespace ~7ms, overlay same, docker ~142ms; MiniMax reasoning
split; dmxapi /v1/messages cache_read; EXT-16 sandbox missing the
python-docx layer). External claims carry per-item source URLs in the
proposal's section 8.

Impact: Documents-only addition: new proposal 2026-10-10 (E1-E5/S0
increments, D/R workstreams, sandbox tiers L0-L2) plus INDEX rows for it
and the previously unlisted G1 package. No product code changes; all
implementation increments stay unauthorized until approved.

Refs: proposals/2026-10-09-agent-quality-improvement-plan.md (P4/P5,
model A/B), 2026-10-09-ext-g1-b1-b3-exec-backend.md (EXT-16),
Dev task feature/agent-exec-routing-sandbox-plan.
2026-10-10 07:39:56 +00:00