Why: The planning index listed the stage-record reconciliation as the
preferred next task: N1 WP6b/6c transfers, the Q1 platform-task vs
squad-run boundary, I1 reserved command consumption, and the I2 card's
dangling reference all feed N2/Q3 and RDM dependency judgments.
Evidence: Dev merges #230/#231/#234/#235/#237/#240/#242 verified in
main via git log --merges on 2026-10-08; stage claims are SELF-level
card statements, explicitly not replayed; intent command.go:18-25/78-84
checked for the Cancel/Handoff ruling.
Impact: Adds a status-backfill section (SS7) to the N1/Q1/I1 plan with
per-item done/transferred/todo ownership, an I2 status note in the
stack completion plan (the sole I2 main record), and INDEX navigation
updates; registers the truncated Q2/Q3 archive lines as a new open
item.
Refs: Dev task feature/agent-stack-stage-records; planning index
"next-step" recommendation (2026-10-08).
Why: The completion proposal defines the N1/Q1/I1 phases but not their
work packages; D1 has landed, so the three phases are now unblocked and
need file-level plans grounded in the current pins.
Evidence: docs-only change; file:line claims verified against the pinned
worktrees (native 3a110a7, squad 5a57636, intent 65aaebc, backend
e7fb276).
Impact: Adds one proposal and one link line; no code changes.
Refs: docs/proposals/2026-10-02-agent-stack-completion.md
Why: The comparison has to say what was borrowed, what was refused, and which product behaviors changed, without copying upstream text.
Evidence: The record lists the verified security gaps and the features implemented in this task. Proposal section 2.5 links to it.
Impact: Deferred and rejected items stay deferred and rejected. Adopted context and secret behavior is no longer described as a later batch.
Refs: feature/sillytavern-review
Why: The October 3 durable note described Pico5 before packages 1-23 existed, and the stack proposal had no place for the v1.0.1 and ZCode v3.14.3 findings.
Evidence: The new record, the correction at the top of the durable note, and proposal section 2.4 link to each other. No code changes.
Impact: Documents only. Later batches can cite the adopt, hold, and reject rows.
Refs: Dev feature/pi-zcode-second-pass
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: The three libraries cannot be reused or recovered independently, and the tested dependency combination is not the one the product builds.
Evidence: Read-only audit at native c6d867c, squad 590fd86, intent 1dbbe81, recorded with file references in docs/records/2026-10-02-agent-stack-audit.md.
Impact: Documents only. No library code or gitlinks change in this commit. Later stages stay separate tasks.
Refs: Dev feature/agent-stack-blueprint
Co-authored-by: Cursor <cursoragent@cursor.com>