Why: The RDM plan's 2026-10-07 snapshot (downstream at zero, N1 in
flight, O1/O3/O7 blocked) was contradicted by the RDM repo's 103 merged
PRs; the planning index registered this as an open reconciliation item
and named it the preferred follow-up to the stage-record task.
Evidence: isolated clone replay at RDM 4feb2f0 (pins=v0.1.0) - make
test exit 0, -ms1 PASS (same-source gold caveat recorded), ms0
acceptance PASS=9/SKIP=0 on a disposable postgres container, five
upload probes, and entrance probes (chat 400 vs commands 200); card/
PR snapshot JSON; all receipts SELF (RDM has no CI), stored under
docs/records/2026-10-08-rdm-status-*.json. The private minutes probe
receipt stays local by decision; only hashes and metrics are recorded.
Impact: adds plan SS2.3 (row-by-row re-verdict, MS1 seven-clause audit,
six registered gaps), marks SS2 as a historical snapshot, updates the
index milestone table and closes the RDM-snapshot open item, registers
the dual-main-record ruling and the missing-CI gap.
Refs: Dev task feature/rdm-status-review; Documents index next-step
(2026-10-08).
Why: The planning index listed the stage-record reconciliation as the
preferred next task: N1 WP6b/6c transfers, the Q1 platform-task vs
squad-run boundary, I1 reserved command consumption, and the I2 card's
dangling reference all feed N2/Q3 and RDM dependency judgments.
Evidence: Dev merges #230/#231/#234/#235/#237/#240/#242 verified in
main via git log --merges on 2026-10-08; stage claims are SELF-level
card statements, explicitly not replayed; intent command.go:18-25/78-84
checked for the Cancel/Handoff ruling.
Impact: Adds a status-backfill section (SS7) to the N1/Q1/I1 plan with
per-item done/transferred/todo ownership, an I2 status note in the
stack completion plan (the sole I2 main record), and INDEX navigation
updates; registers the truncated Q2/Q3 archive lines as a new open
item.
Refs: Dev task feature/agent-stack-stage-records; planning index
"next-step" recommendation (2026-10-08).
Why: documents main gained two plans after the index snapshot, and Dev has since merged N2, N3, Q2, and Q3.
Evidence: 21 markdown proposals are present at HEAD; merge SHAs were read from Dev origin/main git log --merges.
Impact: navigation only; proposal bodies and acceptance claims are unchanged.
Refs: Documents #43#44; Dev #244#247#248#249#250#251#253
Why: expose existing milestone records and distinguish source observations from combination tests.
Evidence: linked records exist at the fixed source version; proposal blobs and the observation receipt remain unchanged.
Impact: index wording and navigation only; no plan or acceptance decision changes.
Refs: docs/proposals/INDEX.md
Why: author and task-account names do not establish ownership of a plan.
Evidence: independent review found four missing owner fields in the adopted set and N2 also has none; fourteen source headers explicitly name weichen.
Impact: correct the index attribution and clarify the local N2 document adoption boundary; source proposals remain unchanged.
Refs: planning-index review P2; docs/proposals/INDEX.md
Why: make existing directions, milestones and tasks discoverable without treating document claims as acceptance.
Evidence: fixed file blobs, 55 PR API records and Git ancestry are preserved as SELF observations; document links and all 19 proposals are checked.
Impact: navigation and evidence only; original plans, approval scope and business code are unchanged.
Refs: Dev feature/planning-index; docs/proposals/INDEX.md