Wire inbox components (frontend) #4

Merged
weichen merged 1 commits from feature/inbox-r2 into main 2026-09-30 06:58:18 +00:00
Owner

T2 inbox wiring/frontend side. Refs: proposal 2026-09-30-ui-inbox-command-workspace

T2 inbox wiring/frontend side. Refs: proposal 2026-09-30-ui-inbox-command-workspace
weichen added 1 commit 2026-09-30 06:58:17 +00:00
Why: T2 frontend of the inbox (D25): the inbox is the first tab with a live
  pending count; card events (created/updated/status/resolved) upsert the
  projection in real time; confirm-projection cards route clicks back to HITL
  resolution (run resumes, server syncs both sides); other actions call the
  cards API and append the server-persisted receipt into the timeline.

Evidence: tsc + build green; vitest 9/9; card state resets/refreshes on
  conversation open and reconcile.

Impact: default right tab becomes 收件箱 (localStorage-persisted preference
  still honored for existing users).

Refs: modules/documents docs/proposals/2026-09-30-ui-inbox-command-workspace.md
weichen merged commit 801a684c26 into main 2026-09-30 06:58:18 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Frontend#4