Files
Agent-System/.doc/ops/short-term/2026-09-15-durable-event-track-e.md
T
weichenandCursor 7647215513 docs(ops): land Phase 2 Track E/S/P plans onto a legal feature branch
Move the reviewed durable-event, HTTP envelope, and PI typed-result
designs off the docs/ prefix so Track E can start from latest dev.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-09-15 08:11:29 +00:00

2.0 KiB
Raw Blame History

title, status, created, updated, owner, branch, worktree, mutex
title status created updated owner branch worktree mutex
Track E 持久事件交付 planned 2026-09-15 2026-09-15 TBD fix/event-production-scope-contract - events

Track E 持久事件交付

目标

按 E0A→E0B→E1A→E1B→E1C 完成 notify、workflow advance、projection 的 PG 持久交付,并用授权页面刷新/重启恢复证据关闭 DOC-RELIABILITY-PILOT 的事件部分。

范围

  • E0A:生产入口/UoW、event contract、runtime registry、历史数据与 sequence 门。
  • E0B:PG dispatcher、attempt audit、独立进程、并发与故障注入。
  • E1A/B/C:三个消费者独立 shadow、switch、rollback 和真实恢复验收。

非目标

  • FAV consumer 激活、bizdev/chat/intent 结构重构、HTTP 错误信封、PI typed result。
  • 删除或覆盖历史事件;在 E0A 通过前启动 dispatcher。

步骤

  1. E0A 单独建 short-term/分支,dispatcher 保持 off。
  2. E0A 报告通过后再认领 E0B。
  3. 依次交付 E1A notify、E1B workflow advance、E1C projection;每步独立 go/no-go。
  4. 一个兼容发布窗口后 contract 删除闭包 API。
  5. 同步 test report、CURRENT、FEATURE-MATRIX、gap-matrix。

验收标准

  • 满足 Phase 2 Track E Definition of Done。
  • 每个波次拥有独立 owner、mutex、分支、报告和回滚证据。
  • 未把计划、MemoryBus、stub 或日志冒充生产 PG/browser/restart 验收。

相关链接

证据 / 备注

本条只建立执行入口,不代表已批准 E0A 或已认领 mutex。实施前必须按 CURRENT 检查冲突并从当时最新 dev 建分支。