ci / vet-and-test (pull_request) Successful in 45s
Why: Reusing an exhausted authorization label would overwrite or misattribute the next controlled quality sample. Evidence: New label/output and 30000-token guarded-run tests failed before implementation and passed after; full Backend Go suite passed. Impact: The r0.2 A01 harness can be used only after separate resource approval, with an independent output name and existing two-run guard. Refs: U3 quality implementation plan r0.2, Task 6 preparation
交付物评测
仓内 testdata/ 是脱敏短样例,用来确认评分卡能区分“结论先行”和“栏目式笔记”。
真实会议材料不要放进仓库。放到 ~/.agent-system/eval/,或设置 EVAL_DIR。其中的 .md 会在 go test ./eval/ 里被打分并打印,缺失该目录时测试跳过。
cd modules/backend && go test ./eval/ ./internal/quality/ -count=1
两种入口的切换由 DecideSwitch 判断:squad 分数不低于 direct,并且直通路径多出来的首字延迟 P50 不超过 3 秒。没有同一评测集上的实测分数时,结果是不切换,runtime.entry 默认保持 direct。