Record O2 A01 evidence implementation authorization and scope

Why: The user approved implementing the zero-paid I1/I2 from the
merged design; the card must state that before dispatching workers.
Evidence: User 2026-10-20 continue-in-order; design PR #662 on main.
Impact: Task card only.
Refs: docs/superpowers/plans/2026-10-20-fast-slow-o2-a01-evidence-plan.md

Co-authored-by: Cursor <cursoragent@cursor.com>
This commit is contained in:
2026-10-20 16:07:47 +00:00
co-authored by Cursor
parent 8db7d27e2f
commit da4112b3da
+14 -11
View File
@@ -9,17 +9,19 @@
- 分支类型:standalone;root_target:main;immediate_target:main;accepting_requirements:false
- 需求分流:verdict=NEW;selected_initiative=无;requirement_sha256=d57eef77021d9143f3489bfbc5128eca76d1dcedf35a6751c6942a2228e7d824;triage_receipt=/tmp/o2a01e-20261020/triage.json;receipt_sha256=d6ace7e0bd056b2d9e9583a39a4a07704ddb6bc3950216d0fab09a64e5f3bfd5
- 授权与交付终点:<本次允许的动作与终点;未授权事项写明>
- 授权与交付终点:用户 2026-10-20「按顺序继续」批准实施已合入方案/计划(Dev #662)的零付费部分:I1 Backend(单元 o2a01e-i1)+ I2 Dev 改钉。终点:两 PR 合入。**未授权**:付费 A01/P2、实例系统层配置写入、部署、改 core 校验器或 schema 结构、软降级语义。
- 交付模式:goal-first(目标、范围和交付终点一次确认;范围内连续推进)
- 实施执行:agent-per-unit(配置:AGENT-EXECUTION.md)
- 合入执行:agent(已授权交付范围内,Review 通过、冲突解决且当前 HEAD 的 CI 通过后合入)
- 人工决策点:仅限目标/范围/验收变更、重大取舍、高后果操作或无法自动判定的业务验收
- 当前阶段:需求拆解;当前增量:I1(待定义)
- 当前阶段:实施;当前增量:I1 Backend
- 流程依据:仓库根目录 policy/delivery.md(归档后仍按仓库根目录定位)
## 目标与非目标
<预期结果、受影响入口/模块/契约;明确不做什么。>
**目标**:按 `docs/superpowers/specs/2026-10-20-fast-slow-o2-a01-evidence-design.md` 与计划实施零付费 I1/I2:收紧 `publish_work_checkpoint` 工具说明/字段说明与材料任务提示;评测允许一次检查点修正(累计 2 次被拒才停);新标签 `approved-o2-a01-evidence`;Dev 前移 `modules/backend`。
**非目标**:不改 core/`normalizeMaterialEvidence`/schema 结构;不付费;不写实例配置;不部署。
## Agent 实施收据
@@ -27,25 +29,26 @@
| 单元 ID | 预期范围 | 配置摘要 | 角色 | 候选顺序 | attempt | CLI/模型 | 终态 | transport | fallback | 源码外收据路径 |
|---|---|---|---|---|---|---|---|---|---|---|
| 待定义 | — | NOT_RUN | NOT_RUN | NOT_RUN | NOT_RUN | NOT_RUN | NOT_RUN | NOT_RUN | NOT_RUN | — |
| o2a01e-i1-backend-evidence-guidance | Backend:说明/提示/评测修正一次/新标签(计划 §2) | network=false external_cost=false | implementation | Cursor→agy→pi-glm→pi→Codex | — | — | NOT_RUN | — | never | /tmp/o2a01e-20261020/o2a01e-i1-receipt.json |
## 关联方向与规划
- 适用状态:待核对(无适用规划时说明原因)
- 主记录路径/版本:待核对(路径按仓库根目录定位,归档后不变;只引用唯一正文)
- 对应里程碑:待核对
- 适用状态:适用——O2 A01 证据合规方案(Dev #662 已合入)
- 主记录路径/版本:docs/superpowers/specs/2026-10-20-fast-slow-o2-a01-evidence-design.md;计划 docs/superpowers/plans/2026-10-20-fast-slow-o2-a01-evidence-plan.md
- 对应里程碑:快慢通道 O2 收口(A01)
## 需求分析
| ID | 描述 | 项目符合度及依据 | 优先级 | 验收条件 | 依赖 | 结论 |
|---|---|---|---|---|---|---|
| R1 | 待填写 | 待评估 | 待定 | 待定义 | 待确认 | 待评审 |
| R1 | I1 Backend:说明收紧 + 评测允许修正一次 + 新标签 | 符合已批准方案 §3 | P1 | 计划 T1–T9 通过;Backend PR CI 通过并合入 | 方案 #662 | 实施中 |
| R2 | I2 Dev:modules/backend 改钉 | 符合计划 §3 | P1 | Dev PR CI 通过并合入 | R1 | 待启动 |
## 方案与计划
- 方案引用:待填写(含对象版本)
- 实施计划引用:待填写(含增量与需求 ID)
- 测试计划引用:待填写(含需求 ID 与验收条件)
- 方案引用:docs/superpowers/specs/2026-10-20-fast-slow-o2-a01-evidence-design.md(main 经 #662)
- 实施计划引用:docs/superpowers/plans/2026-10-20-fast-slow-o2-a01-evidence-plan.md(I1/I2;R1/R2)
- 测试计划引用:同计划 §2 T1–T9
## 阶段记录