Why: The review candidate needs reproducible evidence bound to the exact Dev and Frontend commits.
Evidence: SELF receipts record 272 unit tests, the production build, and 16 browser scenarios on Dev 49ef24b.
Impact: Updates only the task record; product behavior is unchanged.
Refs: feature/workbench-visual-redesign
Why: The Dev composition must consume the reviewed Frontend and UI changes from their authoritative main branches.
Evidence: Frontend and UI merge trees equal the locally verified candidate trees; UI exact-head CI passed.
Impact: Advances only the Frontend and UI pins and records the component merge results.
Refs: Frontend #87; UI #56
Why: The review candidate needs reproducible evidence bound to the exact Dev and Frontend commits.
Evidence: SELF receipts record 272 unit tests, the production build, and 16 browser scenarios on Dev 49ef24b.
Impact: Updates only the task record; product behavior is unchanged.
Refs: feature/workbench-visual-redesign
Why: Independent review found that the visual frame bypassed token and motion ownership and lacked dark/molv proof.
Evidence: UI 4cae1c4 passes 163 tests; Frontend 9b9f24b passes its design guard and 19 browser scenarios across all themes.
Impact: Pairs the new UI tokens with their Frontend consumer and documents the governing design rule.
Refs: Frontend #87; UI #56
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=33261925a10c4eee40d1b6175b3895e78a47ef02.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The review candidate needs reproducible evidence bound to the exact Dev and Frontend commits.
Evidence: SELF receipts record 272 unit tests, the production build, and 16 browser scenarios on Dev 49ef24b.
Impact: Updates only the task record; product behavior is unchanged.
Refs: feature/workbench-visual-redesign
Why: The inverse create control needed its divider and hover state adapted to the new dark navigation surface.
Evidence: Frontend 8dc68fd passes the focused browser layout test and production build locally.
Impact: Advances the Frontend pin and records the final local candidate.
Refs: feature/workbench-visual-redesign
Why: The review candidate needs reproducible evidence bound to the exact Dev and Frontend commits.
Evidence: SELF receipts record 272 unit tests, the production build, and 16 browser scenarios on Dev 49ef24b.
Impact: Updates only the task record; product behavior is unchanged.
Refs: feature/workbench-visual-redesign
Why: The first spacing-focused candidate still resembled the flat gray workspace and did not meet the user's visual target.
Evidence: Frontend ddf3135 passes 272 unit tests, 16 browser scenarios across 320-1920px, and a production build locally.
Impact: Advances the Frontend pin to the visibly differentiated navigation, conversation, and work surfaces.
Refs: feature/workbench-visual-redesign
Why: The deployed workbench needs a clear visual hierarchy across context, conversation, and work without adding new product concepts.
Evidence: Frontend b04f4de passes 272 unit tests, 16 browser scenarios across 320-1920px, and a production build locally.
Impact: Advances only the Frontend pin and records the approved visual increment; runtime adoption remains separately verified.
Refs: feature/workbench-visual-redesign
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-workbench-visual-redesign.md; R0=99119a733830bc120cd6747b8b61736ea6da6078.
Impact: task metadata only; the feature workspace starts at 99119a7338.
Refs: .task/feature-workbench-visual-redesign.md
Why: the close commit still said the live 8788 check had not run, which contradicts the user acceptance already recorded in the same card.
Evidence: user confirmation on 2026-10-15 of conversation order, pane deduplication, and folded process review; cutover notes already in the card. Local checks stay SELF.
Impact: task-card text only. No code, schema, or runtime change.
Refs: Dev PR #550, close PR #552
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-work-companion-visibility.md(PR#550) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=bc76b68cd075379122430acb24fa080b0a38ff5e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Main advanced during UI delivery and task metadata must identify the new combined candidate.
Evidence: task-sync source-out receipt 6122ca6; Backend ead5ade includes both reviewed run history and concurrent vendor skills.
Impact: Fill the task PR link and mark the new Backend combination and final checks pending.
Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
Why: Dev main advanced with a vendor skills task while this UI combination was being verified.
Evidence: Backend main ead5ade contains both Backend #199 and #200; the component merge affects recipes, not run-history handlers.
Impact: Preserve the new main task card and pin the Backend merge containing both changes; combination checks follow on this head.
Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-vendor-popular-skills.md(PR#549) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: The fast and slow channel UI duplicated work cards and hid intermediate output after the final reply.
Evidence: SELF isolated-network make test and make build; 15 browser scenarios; independent component review; component PRs #55, #199, #85.
Impact: Pin merged Backend, Frontend and UI revisions and update DESIGN.md for one detail location and durable folded history.
Refs: .task/feature-work-companion-visibility.md; Agent-System-UI #55; Agent-System-Backend #199; Agent-System-Frontend #85
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-vendor-popular-skills.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-vendor-popular-skills.md
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-work-companion-visibility.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-work-companion-visibility.md
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.
Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.
Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.
Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: task metadata only; the feature workspace starts at c8eead49c5.
Refs: .task/feature-dhf-plan-progress-note.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)