Why: Main advanced during UI delivery and task metadata must identify the new combined candidate.
Evidence: task-sync source-out receipt 6122ca6; Backend ead5ade includes both reviewed run history and concurrent vendor skills.
Impact: Fill the task PR link and mark the new Backend combination and final checks pending.
Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
Why: Dev main advanced with a vendor skills task while this UI combination was being verified.
Evidence: Backend main ead5ade contains both Backend #199 and #200; the component merge affects recipes, not run-history handlers.
Impact: Preserve the new main task card and pin the Backend merge containing both changes; combination checks follow on this head.
Refs: Agent-System-Dev #550; Agent-System-Backend #199 and #200
Why: The fast and slow channel UI duplicated work cards and hid intermediate output after the final reply.
Evidence: SELF isolated-network make test and make build; 15 browser scenarios; independent component review; component PRs #55, #199, #85.
Impact: Pin merged Backend, Frontend and UI revisions and update DESIGN.md for one detail location and durable folded history.
Refs: .task/feature-work-companion-visibility.md; Agent-System-UI #55; Agent-System-Backend #199; Agent-System-Frontend #85
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-vendor-popular-skills.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-vendor-popular-skills.md
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-work-companion-visibility.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-work-companion-visibility.md
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.
Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.
Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.
Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: task metadata only; the feature workspace starts at c8eead49c5.
Refs: .task/feature-dhf-plan-progress-note.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The archived card should remain accurate after its own closure PR merges.
Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.
Impact: Review, CI and cleanup records remain intact.
Refs: Dev PR #542
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=11aa76a3bc1c5047791f9a2de154e451634b6567.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.
Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.
Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.
Refs: Dev PR #542; Dev PR #540; RDM PR #365
Why: Automatic card backfill left the current stage and result summary describing the old WIP candidate.
Evidence: PR #102/#365/#540 merge readbacks, exact-head CI runs 3095/3092, independent review, owner Stage 7 recheck, and approved Stage 10 cleanup are recorded.
Impact: The archived card now shows the current U1 increment outcome and keeps historical checkpoints labeled as such.
Refs: Dev PR #540; RDM PR #365; Documents PR #102
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-template-pipeline-plan.md(PR#540) — merges verified via git log --merges against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)