Commit Graph
15 Commits
Author SHA1 Message Date
weichenandCursor 3785408e71 Archive the completed project-member-runtime task card
ci / test-pg (pull_request) Successful in 9m3s
ci / test (pull_request) Successful in 7m48s
ci / svc-realcombo (pull_request) Successful in 2m34s
Why: the 8788 project-member runtime delivery finished (code merged via #526/#530) but its card and operation records lived only on an unpushed task branch, leaving the worktree impossible to recycle and the record invisible on main.
Evidence: card status "已完成(运行目标)" on feature/project-member-runtime 835d807; branch diff against merge-base touches only .task (card + 29 operation records); credential scan finds only variable-based Authorization headers and sha256 digests.
Impact: adds .task/archive/feature-project-member-runtime.md and .task/artifacts/project-member-runtime/**; no code, gitlink or policy change.
Refs: worktree cleanup 2026-10-18
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-18 09:01:23 +00:00
weichen 59414e2e16 Archive the merged IAM integration task with actual gate results
ci / svc-realcombo (pull_request) Successful in 1m49s
ci / test (pull_request) Successful in 5m24s
ci / test-pg (pull_request) Successful in 7m14s
Why: Close the delivered I1 task without modifying unrelated task records or shared workspaces.

Evidence: Dev PR 534 merged after all three exact-head CI jobs passed; RDM 360/362 and Documents 98/99 actual results and independent reviews are retained.

Impact: Archive this task card and preserve original receipts only; leave all worktrees, branches, production services and later IAM increments unchanged.

Refs: Dev PR 534; policy/delivery.md task closure authorization; IAM I1.
2026-10-13 16:55:34 +00:00
weichen 9c052a25e6 Fix the reviewed IAM integration candidate for final CI
Why: Preserve independent final review and current-source equivalence before platform admission.

Evidence: Final document and integration metadata review has zero findings; full composition test and source equivalence receipts are retained with precise SELF object boundaries.

Impact: Delivery evidence only; no production, provider, guideline or document changes from the reviewed candidate.

Refs: IAM I1 integration task; Documents 98/99; RDM 360/362.
2026-10-13 16:40:23 +00:00
weichen 19b02b3cad Record merged IAM delivery and validate the final integration
Why: Preserve actual component merge results and current delivery authorization before integration CI.

Evidence: RDM PR 360 merged at exact successful CI head; new Dev make test passed and independent metadata checks preserved approved digests and pins.

Impact: Clarify historical task records and current approved repair scope; preserve documentation and delivery evidence only.

Refs: Documents PRs 98 and 99; RDM PRs 360 and 362; IAM I1 task record.
2026-10-13 16:36:35 +00:00
weichen d26e1b0b5b Adopt the approved IAM projection contract and delivery evidence
Why: Carry the actual merged contract and approved permission implementation boundary into the integration composition.

Evidence: Documents PR 99 merged as a7ff466d9ae91fc67a53d2bf4991f47fc63a2a4c after independent review and verified source digest; RDM PR 360 preserves actual-actor projection semantics.

Impact: Update documentation pin, navigation and delivery records only; new composition tests and final-head CI remain required.

Refs: IAM I1 permission contract section 8; Documents PRs 98 and 99; RDM PR 360.
2026-10-13 16:26:05 +00:00
weichen f3c0551feb Adopt the reviewed IAM contract from merged Documents
Why: Record user acceptance and use the actual merged permission contract in the integration composition.

Evidence: Documents PR 98 merged as 3cf263962bd106529ee0531c8415cb16eecedfe3; independent document review and full SELF receipts retained in the task record.

Impact: Advance only Documents and delivery evidence; full IAM later increments and deployment remain outside scope.

Refs: Documents PR 98; IAM I1 U1-U2; policy/delivery.md stages 8-9.
2026-10-13 15:41:52 +00:00
weichen 9334f37c98 Preserve final scoped task archive checks
ci / svc-realcombo (pull_request) Successful in 2m27s
ci / test (pull_request) Successful in 6m23s
ci / test-pg (pull_request) Successful in 9m35s
Why: Keep complete archive verification after the active card is moved.

Evidence: Original SELF synchronization and scoped diff receipts confirm no product or unrelated card changes.

Impact: Task records only.

Refs: Dev #526; RDM #354
2026-10-13 14:54:56 +00:00
weichen 5977882900 Close project membership delivery after downstream integration
Why: The approved base and downstream project membership delivery has reached its merge endpoint.

Evidence: Dev #526 and RDM #354 actual merge records, exact-head gates and independent reviews are preserved with original source labels.

Impact: Archive this task and record the separately authorized deployment follow-up; no product change, worktree cleanup or 8788 write.

Refs: Dev #526; RDM #354
2026-10-13 14:52:59 +00:00
weichen ac07a9716c Record merged base delivery and pending tag consumption
Why: Base merge and downstream completion have distinct authority and validation boundaries.

Evidence: Exact CI head, runner identity, actual merge tree and component commits verified; original platform and tool records preserved.

Impact: Save the handoff for owner-run tags and later RDM pin consumption, without deployment or cleanup.

Refs: Dev526 Backend195 Frontend82 Documents97
2026-10-13 12:08:45 +00:00
weichen 3606ed4ee8 Select merged project membership components
Why: The final base combination must reference actual reviewed main commits.

Evidence: Component PRs are merged, and each merged tree matches the independently tested candidate; whole review receipts remain unmodified.

Impact: Advance gitlinks and preserve acceptance evidence; new exact-head CI follows with no runtime changes.

Refs: Backend195 Frontend82 Documents97; feature/project-member-access
2026-10-13 11:53:42 +00:00
weichen 8406fc08db Record final project member acceptance and review evidence
Why: The composed candidate and its validation limits must be available for independent review and current-head CI.

Evidence: Original receipts, fixed manifests, independent identities and real before/after task outcomes are preserved without source relabeling.

Impact: Archive acceptance and gate references in the canonical task; no product code, deployment or live data changes.

Refs: feature/project-member-access; Backend195 Frontend82 Documents97
2026-10-13 11:33:00 +00:00
weichen 82acec9ee3 Compose the final private project event candidate
Why: Existing upload history must stay private after project adoption, and final object evidence must remain traceable.

Evidence: Original tool receipts and independent reports saved byte-for-byte; new fixed combination and CI remain pending.

Impact: Select Backend d26f3cf and proposal r1.1 with unchanged public downstream contracts; preserve workspaces and live data.

Refs: feature/project-member-access; Frontend PR82; Documents PR97
2026-10-13 11:14:22 +00:00
weichen 0a5d218b06 Compose system project membership implementation candidates
Why: Host-only project creation and domain membership must form one verified identity.

Evidence: Tool-imported SELF receipts and independent Backend and Frontend replay attestations; composed acceptance and final CI remain in progress.

Impact: Advance fixed component pins and record the authorized implementation and privacy boundaries without deployment or runtime changes.

Refs: .task/feature-project-member-access.md; system-project-membership proposal r1
2026-10-13 09:57:00 +00:00
weichen 503bda306b Preserve the diagnostic replay and sync evidence
Why: retain the repeatable membership check and current integration checkpoint.

Evidence: SELF receipts in the task card; readiness fails on the reported data state.

Impact: diagnosis metadata only; product implementation remains pending stage review.

Refs: .task/feature-project-member-access.md
2026-10-13 07:44:15 +00:00
weichen 80c9674dbb Record the project membership diagnosis and repair requirements
Why: a saved host-project membership has no registered RDM project or binding,
so member discovery and private conversation creation cannot resolve it.

Evidence: metadata-only read probes and forge scans are preserved as SELF
receipts in the task card; HTTP and browser replay remain NOT_RUN.

Impact: task documentation and read-only diagnostic helpers only; product
code, runtime databases and deployments are unchanged pending stage review.

Refs: .task/feature-project-member-access.md; policy/delivery.md
2026-10-13 07:42:41 +00:00