Why: Keep the exact failed-sync receipt and the safe component reconciliation before retrying task synchronization.
Evidence: The Documents merge preserved both histories; materialization completed at Backend e6c3d0d87608f3053c89151e8d0cf3fa3f8788f1 and recursive check-worktree verify passed.
Impact: Task card only; no product change or stage-four acceptance claim.
Refs: stage 4 work-observation review; task-sync
Why: The authoritative target advanced while this task recorded approved source and risk requirements.
Evidence: Documents HEAD merges both the task branch and incoming 46506aec34a8803d1b7f4de1a048de9dba591da2 pin; the staged superproject diff has no whitespace errors.
Impact: Include upstream task cards, Backend pin, governance changes, and this task Documents branch without rewriting approved records.
Refs: task-sync; stage 4 work observation review
Why: Save the approved scope expansion, reviewable X3 design, and local combination evidence before synchronizing the authoritative target.
Evidence: Stage-three amendment was approved by the user; fixed stage-four document hash c9edb25c1decbbcb31220ef0cec8703c37e4aaa87bee31eb308169000b335d8c passed link/hash checks and the Documents combination passed make test with SELF receipt 77c20093727a7748f807fb7c22d523e416ca649b98fa839ec48ecd47290223c3.
Impact: Task record and Documents pointer only; X3 public API and product behavior remain unimplemented pending manual stage-four and five review.
Refs: TT-N03, TT-R01; stage 4 addendum
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-vendor-popular-skills.md; R0=e1bc2602e18a89e4d75a4bf6cd80bc7f9b4d2164.
Impact: task metadata only; the feature workspace starts at e1bc2602e1.
Refs: .task/feature-vendor-popular-skills.md
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-dhf-plan-progress-note.md(PR#547) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=3538d40f45ad5a7c779426eb3322f79751db380c.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Documents PR (feature/dhf-plan-progress-note) corrects the stale
WIP/stage-8 wording in the DHF plan progress note; the Dev combo must
pin the updated Documents commit so combined verification covers it.
Evidence: task card records make test exit 2 (transient lock-probe flake
in test_recover_skips_when_lock_held, single rerun OK) then exit 0 on
rerun; make build and task-sync receipts follow in later commits.
Impact: gitlink moves 6619835 -> 46506ae (Documents PR head); note-only
doc change, no code paths affected.
Refs: Documents PR feature/dhf-plan-progress-note; Dev task card
feature-dhf-plan-progress-note
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-pptx-register-structural-gate.md(PR#543) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-plan-progress-note.md; R0=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: task metadata only; the feature workspace starts at c8eead49c5.
Refs: .task/feature-dhf-plan-progress-note.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=c8eead49c5e68b2e295927c0e82cc57bcb04bad5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: branches merged into main had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: feature-card-merge-squash-detect.md(PR#544) — merges verified via git log --merges plus Gitea API squash lookup against origin/main.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7e9ebdea5055a63c713ccc0fb1f938ffe35a6b9d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Preserve the successful synchronized combination and fixed-object review records without changing product code.
Evidence: Current-main task-sync and make test plus make build exited zero; original local and reviewer receipts are retained with their source labels.
Impact: Task record only; P2 review does not stand in for time repair, increment acceptance, CI, or deployment.
Refs: stage 6; verified code object 0db52ed5da
Why: The archived card should remain accurate after its own closure PR merges.
Evidence: Only three temporal phrases changed; the card still points to PR #542 as the authoritative closure result.
Impact: Review, CI and cleanup records remain intact.
Refs: Dev PR #542
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=11aa76a3bc1c5047791f9a2de154e451634b6567.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The archived card still listed Review, synchronization, CI, merge and cleanup as NOT_RUN despite recorded completion.
Evidence: Exact PR heads, CI runs, merge SHAs, queue release and owner Stage 10 approval are linked in the card.
Impact: The terminal delivery section now agrees with its stage table and remaining U1 boundary.
Refs: Dev PR #542; Dev PR #540; RDM PR #365
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=11aa76a3bc1c5047791f9a2de154e451634b6567.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Save the reviewed stage 6 boundaries, component probes, dependency state, and service fixture evidence before current-main synchronization.
Evidence: Complete working-combination make test exited zero after isolated-port fixture repair; earlier failures and original SELF receipts remain recorded in the task card.
Impact: Local checkpoint only; no product acceptance, PR, release, deployment, or real database migration.
Refs: stage 6 W4a, W6, W9; approved time-contract SHA256 d78849440e6346482fc09925d402790a7ad257ef76c85275610046a845a45f37