Why: include the current integration baseline before verification.
Evidence: fetched origin/main=866086c2a080716195c3dd35e6ef362016347c94.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=56152323f6179d8f99cfb2b4808573f1d95a63a2.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=36897a1009eb8d3ec63fac8974446bbd4c59bbc0.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=0bda404ac0c0169edc8ac00688528e29ff327c3d.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: retain the clarified shared-project and private-document design with complete requirements coverage.
Evidence: SELF source receipt, 112-row requirements matrix, plan review and documentation checks in the task card.
Impact: local planning candidate only; no business implementation, push, merge to main or deployment.
Refs: modules/documents/docs/proposals/2026-10-11-rdm-final-target-completion.md
Why: the master record now records U1 as merged (Documents 2a5f658); the Dev gitlink and PROJECT.md entry must follow.
Evidence: Documents PR #66 merged=True (API); closeout doc check receipt in card; RDM PR #195 merge 05b7d1a.
Impact: modules/documents gitlink, PROJECT.md planning entry, task card; no code change.
Refs: Documents PR #66; RDM PR #195
Why: save this task owned pending documentation before resuming the broader system plan.
Evidence: user confirmation and SELF documentation check receipt are retained in the task card.
Impact: local documentation snapshot only; no push or implementation.
Refs: .task/feature-rdm-template-dialog-plan.md
Why: backend main pins deps/agent-system-core at 452daf3 (Surface types, core PR #25); Dev's top-level core gitlink lagged at a253a40, failing make test-pins after task-sync.
Evidence: check-pins green after the bump; core origin-main tip is 452daf3.
Impact: gitlink bump only.
Refs: core PR #25; backend PR #143.
Why: the parent must pin the merged component SHAs for the combined build and CI gates.
Evidence: backend origin-main merges of #144 (storage-migrate) and #145 (surface tables in copy list); documents origin-main merge of #65 (runbook section 10).
Impact: gitlink updates only.
Refs: backend PR #144, #145; documents PR #65.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=80a518628c526fd6ddece4abeb707ab4bb0b5618.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The U2 increment landed across four component repos (Core #25
Surface contract types and validation; Backend #143 surface store,
activation guard, EXT-17 SurfaceHost, direct API; UI #40 and Frontend
#51 id/source contract mirrors); Dev pins the combined set for the
authoritative make test/build gate.
Evidence: Component PRs merged (core 452daf3, backend d795143, ui
5b03b8f, frontend a26d7c5); combined verification receipts follow in
this branch via make evidence.
Impact: Gitlink pins only in this commit; task-card updates follow.
Refs: Documents proposal r2 U2; Dev task feature/generative-ui-u2
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=80a518628c526fd6ddece4abeb707ab4bb0b5618.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: retain the requested template audit and proposed delivery design in the project entrypoints.
Evidence: SELF precheck, source inventory and documentation checks are preserved in the task card; business and combination tests NOT_RUN.
Impact: local documentation candidate only; no push, merge, migration or deployment.
Refs: .task/feature-rdm-template-dialog-plan.md
Why: the real-PG CI gate on PR #333 exposed the stack overflow; PR #142 fixes it with a regression test.
Evidence: backend origin-main merge of #142 fetched post-merge and checked out.
Impact: gitlink only.
Refs: backend PR #142; Dev PR #333.
Why: the parent must pin the merged component SHAs for the combined build and CI gates.
Evidence: both origin-main merge commits fetched post-merge and checked out.
Impact: gitlink updates only.
Refs: backend PR #141; documents PR #64.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=90c07a5b4fb75251ea72b492ccb6714e5e699fe5.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the plan was approved and merged in Documents (PR #63); the Dev pin and planning entry must follow the approved master record.
Evidence: modules/documents gitlink d3e40c783d1a092b67d025303f28384a564548f4 (Documents PR #63 merge, SELF API query); task card backfilled with the user rulings and merge record.
Impact: documents gitlink, PROJECT.md planning entry, and task-card metadata only; no code change.
Refs: Documents PR #63; .task/feature-rdm-two-trees-audit-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The U1 controlled trial finished; its fixtures, validator, runner,
per-run results, report, and renderer spike must be reviewable from the
task branch, and the task card needs the final PASS/FAIL record.
Evidence: results/summary.json + report.md (SELF, MiniMax official
channel, CNY 3 of 200 cap); make evidence receipts for precheck,
task-sync, and make test follow in this branch.
Impact: Task-scoped experiment artifacts only (.task/genui-u1/); no
production code changes.
Refs: Documents PR #62 (proposal r2); task card feature/generative-ui-u1
Why: the parent must pin the merged component SHA for the combined build and CI gates.
Evidence: backend origin-main merge of #140 fetched and checked out.
Impact: gitlink only.
Refs: backend PR #140.
Why: the racing-migrator test failed deterministically on slow CI disks from the connection-open phase; PR #139 adds a bounded Begin retry and pre-materializes the racing test database.
Evidence: backend PR #139 merged (CI logs jobs 2285/2293 cited there); local store suite green.
Impact: gitlink only.
Refs: PR #325.
Why: the runner-container guard had a doubled '[[' from a string replacement (exit '[: too many arguments'), and pgvector's extension is named 'vector' (control file vector.control) - CREATE EXTENSION pgvector failed with 'extension not available' (jobs 2285/2286 logs).
Evidence: job 2286 log 'ERROR: extension pgvector is not available ... pgvector.control: No such file'; package postgresql-16-pgvector 0.6.0 installed fine.
Impact: test-pg job only; repins backend to the #138 merge (30s SQLite busy timeout for serialized migrators).
Refs: backend PR #138; Dev PR #325.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=2afcfd5d6db29e76ae89b34798b8f34f030a3a69.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the parent must pin the merged component SHAs so the combined build and CI gate run against the delivered U2 code and U1 runbook.
Evidence: backend origin-main merge commit of #137 and documents origin-main merge commit of #61 (fetched post-merge, replacing a stale pre-merge pin attempt).
Impact: gitlink updates only.
Refs: backend PR #137; documents PR #61.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=2afcfd5d6db29e76ae89b34798b8f34f030a3a69.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
# Conflicts:
# PROJECT.md
Why: The user ruled the three open choices on 2026-10-11 (first pilot =
in-conversation analysis page; trusted compiled-plugin delivery for
enable/disable; U1 trial limited to MiniMax M3 + M2.7-highspeed,
sanitized materials, CNY 200 cap), converting the research draft into a
publishable direction record.
Evidence: Precheck and evidence receipts live in the task card;
Documents PR #60 (merged at 3304efe) carries the proposal and index
entry that this gitlink pins.
Impact: Dev-side PROJECT.md entry, documents gitlink, and the task card
only; no code or contract changes.
Refs: modules/documents/docs/proposals/2026-10-10-generative-ui-plugin.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=7743f53c5dfe9ed8dfd0663d05e3be15544d8942.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The approved three-column redesign converges entries and hierarchy:
preview merges into a Work/Files third column, the left rail moves
project switching to the top and sinks files/workspaces/account to the
bottom, stop control consolidates into the input area with a light
fast/slow-lane status hint, and the top bar stops repeating project
identity. DESIGN.md 6 and 9.3 are revised in the same changeset per the
design gate (no token changes; 12.2 records the revision).
Evidence: Frontend npx vitest run 85/85 and npm run build passed in this
worktree (SELF receipts below); full make test to follow before review.
Impact: bumps modules/frontend to 3ed10e1 (two commits: layout rework +
workspace builtin expectations); DESIGN.md 6/9.3/12.2; task card records
requirements R1-R6 and the authorized-continuous scope.
Refs: three-column workbench proposal (2026-10-11).
Why: the approved plan r1 landed on documents main via PR #59; the Dev parent must pin it for the combined build.
Evidence: documents origin/main=95e5c9d307626727db2d1df3b42d74873bc8bbe4 containing proposal r1, index entry, review record, audit receipt.
Impact: gitlink only; no code or runtime change.
Refs: documents PR #59.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=4c8ad93892e5c8a88d7160220288720c40805251.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=5fa6cfbd8c8995c4267d0a76390f652b62d953dc.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Frontend PR #49 merged; the pin must point at component main so the
merged content is actually contained (branch-head pins drop unmerged diff).
Evidence: vitest 85/85 and browser replay recorded earlier cover the branch
head; make test rerun on this pin before the Dev PR.
Impact: modules/frontend gitlink 84b73ab -> 339a9eb.
Refs: Frontend PR #49; task card feature/empty-state-preview-fix.