Commit Graph
299 Commits
Author SHA1 Message Date
weichen c29b3585bd Pin documents with the U6 gate record (#72) 2026-10-11 15:01:32 +00:00
weichen 6b6351c847 Pin the U5 component set: documents #71, backend #155, ui #46/#47, frontend #56 2026-10-11 14:24:52 +00:00
weichen a8eedbe756 Pin documents with the U5 action-scope proposal (#70) 2026-10-11 13:50:27 +00:00
weichen b877eddbbe Merge remote-tracking branch 'origin/main' into feature/generative-ui-u4
ci / test-pg (pull_request) Successful in 1m12s
ci / test (pull_request) Successful in 3m13s
2026-10-11 13:37:44 +00:00
weichen 2338a6995c Merge authoritative main into the task branch
ci / test (pull_request) Failing after 1s
ci / test-pg (pull_request) Failing after 1s
Why: resolve the interrupted sync: take the reconciled Documents pin eb36571 (union of U2 progress and template/final-target plans) plus main's card/PROJECT updates.

Evidence: Documents PR #68 merge eb36571; gitlink conflict resolved to the superset tip.

Impact: task-branch integration merge only.

Refs: Documents #68; Dev #340/#354
2026-10-11 13:11:18 +00:00
weichen 123a7db972 Re-pin ui with the knip baseline bump (#45) 2026-10-11 12:27:10 +00:00
weichen 13c59a9a74 Re-pin backend with the core dep bump (#150) 2026-10-11 12:22:53 +00:00
weichen da4365eed9 Pin the U4 component set: core surface TS types, ui SurfaceView, frontend preview 2026-10-11 12:21:12 +00:00
weichen 296a54b3e8 Pin the U2 progress update into the Dev combination
Why: the master record now records U2 as merged (Documents 559af219); the Dev gitlink and PROJECT.md entry must follow.

Evidence: Documents PR #67 merged=True (API); closeout doc check receipt in card; RDM PR #197 merge fe8a75b.

Impact: modules/documents gitlink, PROJECT.md planning entry, task card; no code change.

Refs: Documents PR #67; RDM PR #197/#198
2026-10-11 11:23:22 +00:00
weichen 55b520aee2 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=866086c2a080716195c3dd35e6ef362016347c94.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 11:02:45 +00:00
weichen 014a72fad4 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=56152323f6179d8f99cfb2b4808573f1d95a63a2.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 10:38:39 +00:00
weichen 48ae08150f Pin backend with the generative-ui plugin (u3, #149) 2026-10-11 10:38:36 +00:00
weichen 971a1860c2 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=36897a1009eb8d3ec63fac8974446bbd4c59bbc0.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 09:37:01 +00:00
weichen ca4f5a57bb Merge remote-tracking branch 'origin/main' into feature/generative-ui-u2
ci / test (pull_request) Successful in 2m17s
ci / test-pg (pull_request) Successful in 53s
2026-10-11 09:21:46 +00:00
weichen d97be88cd6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=0bda404ac0c0169edc8ac00688528e29ff327c3d.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 09:17:09 +00:00
weichen 4c8e6a8db8 Record the complete RDM final-target planning candidate
Why: retain the clarified shared-project and private-document design with complete requirements coverage.

Evidence: SELF source receipt, 112-row requirements matrix, plan review and documentation checks in the task card.

Impact: local planning candidate only; no business implementation, push, merge to main or deployment.

Refs: modules/documents/docs/proposals/2026-10-11-rdm-final-target-completion.md
2026-10-11 08:54:39 +00:00
weichen d1d7189f68 Re-pin backend with the core dep bump (#146) 2026-10-11 08:46:56 +00:00
weichen 9cbac4a14a Pin the U1 progress update into the Dev combination
Why: the master record now records U1 as merged (Documents 2a5f658); the Dev gitlink and PROJECT.md entry must follow.

Evidence: Documents PR #66 merged=True (API); closeout doc check receipt in card; RDM PR #195 merge 05b7d1a.

Impact: modules/documents gitlink, PROJECT.md planning entry, task card; no code change.

Refs: Documents PR #66; RDM PR #195
2026-10-11 08:45:35 +00:00
weichen 24d71db597 Re-pin core #26 and the regenerated contract mirrors (frontend #52, ui #41) 2026-10-11 08:45:33 +00:00
weichen d90f1c494a Preserve the approved pilot-order planning checkpoint
Why: save this task owned pending documentation before resuming the broader system plan.

Evidence: user confirmation and SELF documentation check receipt are retained in the task card.

Impact: local documentation snapshot only; no push or implementation.

Refs: .task/feature-rdm-template-dialog-plan.md
2026-10-11 08:39:47 +00:00
weichen 3deae0ff2f Pin modules/core to the Surface contract merge (match backend's core pin)
Why: backend main pins deps/agent-system-core at 452daf3 (Surface types, core PR #25); Dev's top-level core gitlink lagged at a253a40, failing make test-pins after task-sync.

Evidence: check-pins green after the bump; core origin-main tip is 452daf3.

Impact: gitlink bump only.

Refs: core PR #25; backend PR #143.
2026-10-11 08:38:31 +00:00
weichen 32f7861c42 Pin the U4 merges: backend PR #144/#145, documents PR #65
Why: the parent must pin the merged component SHAs for the combined build and CI gates.

Evidence: backend origin-main merges of #144 (storage-migrate) and #145 (surface tables in copy list); documents origin-main merge of #65 (runbook section 10).

Impact: gitlink updates only.

Refs: backend PR #144, #145; documents PR #65.
2026-10-11 08:33:08 +00:00
weichen 0696104598 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=80a518628c526fd6ddece4abeb707ab4bb0b5618.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 08:27:33 +00:00
weichen fc6be95e03 Pin the U2 component set: core surface contract, backend store, mirrors
Why: The U2 increment landed across four component repos (Core #25
Surface contract types and validation; Backend #143 surface store,
activation guard, EXT-17 SurfaceHost, direct API; UI #40 and Frontend
#51 id/source contract mirrors); Dev pins the combined set for the
authoritative make test/build gate.

Evidence: Component PRs merged (core 452daf3, backend d795143, ui
5b03b8f, frontend a26d7c5); combined verification receipts follow in
this branch via make evidence.

Impact: Gitlink pins only in this commit; task-card updates follow.

Refs: Documents proposal r2 U2; Dev task feature/generative-ui-u2
2026-10-11 08:27:30 +00:00
weichen 67dc8085f2 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=80a518628c526fd6ddece4abeb707ab4bb0b5618.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 08:24:06 +00:00
weichen fee68dc8f5 Record the local RDM document-generation planning candidate
Why: retain the requested template audit and proposed delivery design in the project entrypoints.

Evidence: SELF precheck, source inventory and documentation checks are preserved in the task card; business and combination tests NOT_RUN.

Impact: local documentation candidate only; no push, merge, migration or deployment.

Refs: .task/feature-rdm-template-dialog-plan.md
2026-10-11 08:24:03 +00:00
weichen 19148c71bb Repin backend to the notice-redelivery recursion fix (PR #142)
Why: the real-PG CI gate on PR #333 exposed the stack overflow; PR #142 fixes it with a regression test.

Evidence: backend origin-main merge of #142 fetched post-merge and checked out.

Impact: gitlink only.

Refs: backend PR #142; Dev PR #333.
2026-10-11 08:12:23 +00:00
weichen 07dc864938 Pin the U3 slice-2 merges: backend PR #141, documents PR #64
Why: the parent must pin the merged component SHAs for the combined build and CI gates.

Evidence: both origin-main merge commits fetched post-merge and checked out.

Impact: gitlink updates only.

Refs: backend PR #141; documents PR #64.
2026-10-11 05:18:32 +00:00
weichen 80741d42d6 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=bfcdeef9aa335ca605c5794de9fc3889eeb1c2ab.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 05:15:02 +00:00
weichen 53682572b9 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=90c07a5b4fb75251ea72b492ccb6714e5e699fe5.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 04:55:57 +00:00
weichen 0876477918 Integrate the approved two-trees plan into the Dev combination
ci / test (pull_request) Successful in 2m22s
ci / test-pg (pull_request) Successful in 55s
Why: the plan was approved and merged in Documents (PR #63); the Dev pin and planning entry must follow the approved master record.

Evidence: modules/documents gitlink d3e40c783d1a092b67d025303f28384a564548f4 (Documents PR #63 merge, SELF API query); task card backfilled with the user rulings and merge record.

Impact: documents gitlink, PROJECT.md planning entry, and task-card metadata only; no code change.

Refs: Documents PR #63; .task/feature-rdm-two-trees-audit-plan.md
2026-10-11 04:45:11 +00:00
weichen 954ea710df Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=6479eb5c38636e758b7e44a36fdc7ce6883ad1c9.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 04:43:06 +00:00
weichen 1c25d65ae9 Record the U1 trial: harness, results, and task-card outcomes
Why: The U1 controlled trial finished; its fixtures, validator, runner,
per-run results, report, and renderer spike must be reviewable from the
task branch, and the task card needs the final PASS/FAIL record.

Evidence: results/summary.json + report.md (SELF, MiniMax official
channel, CNY 3 of 200 cap); make evidence receipts for precheck,
task-sync, and make test follow in this branch.

Impact: Task-scoped experiment artifacts only (.task/genui-u1/); no
production code changes.

Refs: Documents PR #62 (proposal r2); task card feature/generative-ui-u1
2026-10-11 04:43:03 +00:00
weichen f3e7e67fb3 Pin the backend U3 atomicity merge (PR #140)
Why: the parent must pin the merged component SHA for the combined build and CI gates.

Evidence: backend origin-main merge of #140 fetched and checked out.

Impact: gitlink only.

Refs: backend PR #140.
2026-10-11 04:38:09 +00:00
weichen bb82924454 Repin backend to the migration busy-retry fix (PR #139)
ci / test-pg (pull_request) Successful in 52s
ci / test (pull_request) Successful in 2m16s
Why: the racing-migrator test failed deterministically on slow CI disks from the connection-open phase; PR #139 adds a bounded Begin retry and pre-materializes the racing test database.

Evidence: backend PR #139 merged (CI logs jobs 2285/2293 cited there); local store suite green.

Impact: gitlink only.

Refs: PR #325.
2026-10-11 04:09:07 +00:00
weichen 53defb4bb4 Fix the CI test-pg setup: single bracket test and the vector extension name
ci / test-pg (pull_request) Failing after 53s
ci / test (pull_request) Successful in 2m22s
Why: the runner-container guard had a doubled '[[' from a string replacement (exit '[: too many arguments'), and pgvector's extension is named 'vector' (control file vector.control) - CREATE EXTENSION pgvector failed with 'extension not available' (jobs 2285/2286 logs).

Evidence: job 2286 log 'ERROR: extension pgvector is not available ... pgvector.control: No such file'; package postgresql-16-pgvector 0.6.0 installed fine.

Impact: test-pg job only; repins backend to the #138 merge (30s SQLite busy timeout for serialized migrators).

Refs: backend PR #138; Dev PR #325.
2026-10-11 03:43:06 +00:00
weichen 94d8158fba Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=2afcfd5d6db29e76ae89b34798b8f34f030a3a69.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 03:14:49 +00:00
weichen 02f3e8e8e1 Pin the U1/U2 merges: backend PR #137, documents PR #61
Why: the parent must pin the merged component SHAs so the combined build and CI gate run against the delivered U2 code and U1 runbook.

Evidence: backend origin-main merge commit of #137 and documents origin-main merge commit of #61 (fetched post-merge, replacing a stale pre-merge pin attempt).

Impact: gitlink updates only.

Refs: backend PR #137; documents PR #61.
2026-10-11 03:14:41 +00:00
weichen 52e87133df Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=2afcfd5d6db29e76ae89b34798b8f34f030a3a69.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync

# Conflicts:
#	PROJECT.md
2026-10-11 03:11:55 +00:00
weichen 6ec034b46f Publish the Generative UI proposal r1 and record the user rulings
Why: The user ruled the three open choices on 2026-10-11 (first pilot =
in-conversation analysis page; trusted compiled-plugin delivery for
enable/disable; U1 trial limited to MiniMax M3 + M2.7-highspeed,
sanitized materials, CNY 200 cap), converting the research draft into a
publishable direction record.

Evidence: Precheck and evidence receipts live in the task card;
Documents PR #60 (merged at 3304efe) carries the proposal and index
entry that this gitlink pins.

Impact: Dev-side PROJECT.md entry, documents gitlink, and the task card
only; no code or contract changes.

Refs: modules/documents/docs/proposals/2026-10-10-generative-ui-plugin.md
2026-10-11 03:11:19 +00:00
weichen af5acebca8 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=7743f53c5dfe9ed8dfd0663d05e3be15544d8942.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 02:46:30 +00:00
weichen 5915c2018c Land the three-column workbench layout with the Files entry
Why: The approved three-column redesign converges entries and hierarchy:
preview merges into a Work/Files third column, the left rail moves
project switching to the top and sinks files/workspaces/account to the
bottom, stop control consolidates into the input area with a light
fast/slow-lane status hint, and the top bar stops repeating project
identity. DESIGN.md 6 and 9.3 are revised in the same changeset per the
design gate (no token changes; 12.2 records the revision).

Evidence: Frontend npx vitest run 85/85 and npm run build passed in this
worktree (SELF receipts below); full make test to follow before review.

Impact: bumps modules/frontend to 3ed10e1 (two commits: layout rework +
workspace builtin expectations); DESIGN.md 6/9.3/12.2; task card records
requirements R1-R6 and the authorized-continuous scope.

Refs: three-column workbench proposal (2026-10-11).
2026-10-11 02:43:27 +00:00
weichen 45e08b926d Pin the documents collaboration-storage plan merge (PR #59)
Why: the approved plan r1 landed on documents main via PR #59; the Dev parent must pin it for the combined build.

Evidence: documents origin/main=95e5c9d307626727db2d1df3b42d74873bc8bbe4 containing proposal r1, index entry, review record, audit receipt.

Impact: gitlink only; no code or runtime change.

Refs: documents PR #59.
2026-10-11 02:43:09 +00:00
weichen 5566509ec3 Pin the documents S0-1 backfill alongside the card close
ci / test (pull_request) Successful in 2m19s
2026-10-11 02:30:34 +00:00
weichen 8faac84195 Pin backend bd4b3bc (S0 overlay with shell cleanup) 2026-10-11 02:20:56 +00:00
weichen 55fbe2651d Pin backend with the S0 workspace overlay 2026-10-11 02:14:45 +00:00
weichen b7aace7f0a Pin the documents E4 backfill alongside the card close
ci / test (pull_request) Successful in 2m33s
2026-10-11 01:35:38 +00:00
weichen 2c2775fcfa Pin backend with the R4 injection logging 2026-10-11 01:24:53 +00:00
weichen 8244822407 Pin backend with the R4 sliding window 2026-10-10 18:44:18 +00:00
weichen 4d6feedc41 Pin backend ebec49d (E4 fix-up merged) 2026-10-10 18:22:41 +00:00