Why: CI run 4176 failed because Dev main pinned unmerged super-admin component commits.
Evidence: Backend #217 and Frontend #112 merged with CI success; make test-pins ok (SELF).
Impact: Task card only.
Refs: Dev #512, Backend #217, Frontend #112, merge queue #518
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-fast-slow-u2-u3-plan.md -> .task/archive/feature-fast-slow-u2-u3-plan.md; status 已完成(合入前闭合); PR #512https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/512.
Impact: task metadata only; the card is archived within PR #512 and lands with its merge commit.
Refs: task.sh close --self
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=38ac2b0687514b480cc61dec425e1affb37c6295.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-regkb-components-pin-8a396cf.md -> .task/archive/feature-regkb-components-pin-8a396cf.md; status 已完成(合入前闭合); PR #631https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/631.
Impact: task metadata only; the card is archived within PR #631 and lands with its merge commit.
Refs: task.sh close --self
Why: The independent review flagged stale pre-close header lines (PR, stage, to-do) on the archived card.
Evidence: Review approved both PRs with two Important stale-text findings; Documents stage table fixed in 6973a99.
Impact: Task card only; the preceding transport commit pins modules/documents to 6973a99.
Refs: Dev #630, Documents #116
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-rdm-two-trees-latest-templates.md -> .task/archive/feature-rdm-two-trees-latest-templates.md; status 已完成(合入前闭合); PR #630https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/630.
Impact: task metadata only; the card is archived within PR #630 and lands with its merge commit.
Refs: task.sh close --self
Why: Record the dev-superadmin-repair-multi-instance repair unit that fixed the multi-instance tests, test_svc port, and load test scripts for super-admin credentials.
Evidence: Receipts in /home/weichen/.cache/agent-system-dev/evidence/dev-superadmin-repair-multi-instance.json; make test-multi-instance passes (15.753s).
Impact: Task card metadata updated.
Refs: PR #627
Why: Record the dev-superadmin-repair-svc-realcombo repair unit that fixed the real combo test fixture and service environment forwarding.
Evidence: Receipts in /home/weichen/.cache/agent-system-dev/evidence/dev-superadmin-repair-svc-realcombo.json; tests pass.
Impact: Task card metadata updated.
Refs: PR #627
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-super-admin.md -> .task/archive/feature-super-admin.md; status 已完成(合入前闭合); PR #627https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/627.
Impact: task metadata only; the card is archived within PR #627 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-iam-u3-account-directory-recovery.md -> .task/archive/feature-iam-u3-account-directory-recovery.md; status 已完成(合入前闭合); PR #626https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/626.
Impact: task metadata only; the card is archived within PR #626 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-regkb-corpus-wiring.md -> .task/archive/feature-regkb-corpus-wiring.md; status 已完成(合入前闭合); PR #625https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/625.
Impact: task metadata only; the card is archived within PR #625 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation.md -> .task/archive/feature-norm-remediation.md; status 已完成(合入前闭合); PR #616https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/616.
Impact: task metadata only; the card is archived within PR #616 and lands with its merge commit.
Refs: task.sh close --self
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=eef7e5e778cabcb6216f74b74213a3d7511f383b.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u6.md -> .task/archive/feature-norm-remediation-u6.md; status 已完成(合入前闭合); PR #624https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/624.
Impact: task metadata only; the card is archived within PR #624 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u5.md -> .task/archive/feature-norm-remediation-u5.md; status 已完成(合入前闭合); PR #623https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/623.
Impact: task metadata only; the card is archived within PR #623 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u7.md -> .task/archive/feature-norm-remediation-u7.md; status 已完成(合入前闭合); PR #622https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/622.
Impact: task metadata only; the card is archived within PR #622 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u4.md -> .task/archive/feature-norm-remediation-u4.md; status 已完成(合入前闭合); PR #621https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/621.
Impact: task metadata only; the card is archived within PR #621 and lands with its merge commit.
Refs: task.sh close --self
Why: Record the final pre-merge sync against the current initiative head.\nEvidence: make task-sync exited 0 with changed=0 at target fe0f1cd.\nImpact: Keep exact-target evidence with the archived task card.\nRefs: PR #620
Why: The child card must distinguish root main from its immediate initiative target.\nEvidence: Initiative PR #616 is open with base main; task-pr-check rejected the incorrect root_target.\nImpact: Restore correct target provenance without changing policy or gates.\nRefs: PR #620, PR #616
Why: Retain the SELF receipt for task-card closure in the archived U3 record.\nEvidence: task-close SELF=1 exited successfully for PR #620.\nImpact: Keep the pre-merge closeout reproducible without changing policy code.\nRefs: PR #620
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u3.md -> .task/archive/feature-norm-remediation-u3.md; status 已完成(合入前闭合); PR #620https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/620.
Impact: task metadata only; the card is archived within PR #620 and lands with its merge commit.
Refs: task.sh close --self
Why: Record the cached-target outage fix, host review, and final local verification for U2.\nEvidence: SELF receipts cover 84 focused tests and 495 governance tests; 18 checks skipped.\nImpact: Preserve exact-head delivery traceability without changing implementation.\nRefs: PR #618
Why: Preserve the final network-error classification, child-parent identity gate, and full governance test result.
Evidence: 83 focused tests and all 494 governance tests passed (18 skips) on the code candidate; child outage/missing-parent contrast tests passed.
Impact: New task and formal delivery gates remain strict; current PR head CI and final review are still required.
Refs: U2 / PR #618
Why: Preserve final root/child offline resume behavior and its reachable-parent-missing guard.
Evidence: 80 evidence/recovery tests and all 491 governance tests pass (18 expected skips) on the code candidate.
Impact: Local resume remains bounded; known missing remote parent refuses, network outage may use the registered local parent. Final-head CI remains required.
Refs: U2 / PR #618
Why: Preserve host verification and worker transport records for offline root and child task resume.
Evidence: 79 evidence/recovery tests passed; governance validation is being rerun on the final implementation candidate.
Impact: LOCAL_READY remains local-only; exact-head CI and final independent review remain required.
Refs: U2 / PR #618
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-iam-u4-role-authority.md -> .task/archive/feature-iam-u4-role-authority.md; status 已完成(合入前闭合); PR #619https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/619.
Impact: task metadata only; the card is archived within PR #619 and lands with its merge commit.
Refs: task.sh close --self
Why: Preserve the final guard for a reachable advertised target whose commit object cannot be compared locally.
Evidence: The regression test, 74 focused evidence/recovery tests, and all 485 governance tests pass.
Impact: Network outages retain LOCAL_READY; known but unverified target history returns REMOTE_UNVERIFIED. Exact-head CI remains pending.
Refs: U2 / PR #618
Why: Preserve the final test matrix and review corrections for the U2 candidate.
Evidence: All 484 governance tests pass (18 skipped); the targeted evidence and recovery cases pass on the same implementation.
Impact: SELF evidence only; final-head CI and independent review remain required.
Refs: U2 / PR #618
Why: Preserve the closed-task and remote-target rewind corrections with their regression and governance test evidence.
Evidence: 71 focused tests and all 482 governance tests passed; the previous exact-head CI failed in an unrelated backend runtime test and requires a fresh run.
Impact: Review findings are fixed in scope; independent final review and current-head CI remain required.
Refs: U2 / PR #618
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-regulations-kb.md -> .task/archive/feature-regulations-kb.md; status 已完成(合入前闭合); PR #614https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/614.
Impact: task metadata only; the card is archived within PR #614 and lands with its merge commit.
Refs: task.sh close --self
Why: Capture the final offline recovery cases and host verification on the PR candidate.
Evidence: 68 focused evidence and task-recovery tests pass; two broader task-start failures reproduce on the parent baseline.
Impact: Local evidence remains SELF; exact-head CI and independent review are still required.
Refs: U2 / PR #618
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-norm-remediation-u2.md -> .task/archive/feature-norm-remediation-u2.md; status 已完成(合入前闭合); PR #618https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/618.
Impact: task metadata only; the card is archived within PR #618 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-rdm-settings-phase1a.md -> .task/archive/feature-rdm-settings-phase1a.md; status 已完成(合入前闭合); PR #617https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/617.
Impact: task metadata only; the card is archived within PR #617 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-u8-sqlite-instance-guard-r2.md -> .task/archive/feature-u8-sqlite-instance-guard-r2.md; status 已完成(合入前闭合); PR #615https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/615.
Impact: task metadata only; the card is archived within PR #615 and lands with its merge commit.
Refs: task.sh close --self
Why: the 8788 project-member runtime delivery finished (code merged via #526/#530) but its card and operation records lived only on an unpushed task branch, leaving the worktree impossible to recycle and the record invisible on main.
Evidence: card status "已完成(运行目标)" on feature/project-member-runtime 835d807; branch diff against merge-base touches only .task (card + 29 operation records); credential scan finds only variable-based Authorization headers and sha256 digests.
Impact: adds .task/archive/feature-project-member-runtime.md and .task/artifacts/project-member-runtime/**; no code, gitlink or policy change.
Refs: worktree cleanup 2026-10-18
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-ecs-sync-local-dev.md -> .task/archive/feature-ecs-sync-local-dev.md; status 已完成(合入前闭合); PR #612https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/612.
Impact: task metadata only; the card is archived within PR #612 and lands with its merge commit.
Refs: task.sh close --self
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-delivery-model-v3.md -> .task/archive/feature-delivery-model-v3.md; status 已完成(合入前闭合); PR #608https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/608.
Impact: task metadata only; the card is archived within PR #608 and lands with its merge commit.
Refs: task.sh close --self
Why: branches merged into their immediate or root target had left their task cards open; backfill status and archive to prevent bookkeeping debt.
Evidence: fix-agent-exec-terminal-wrapper.md(PR#610 into main) — merges verified via git log --merges plus Gitea API squash lookup against each card's origin target.
Impact: .task/*.md moved to .task/archive/ with status backfilled; no code or submodule change.
Refs: task.sh close (card-autoclose-r1)
Why: Remove stale pending labels after delivery.
Evidence: Independent metadata review matched the raw merge, CI and runtime receipts.
Impact: Task metadata only.
Refs: #565; Agent-System-RDM #404
(cherry picked from commit c4f7a79752)
Why: Record the deployed 8788 result and preserve its acceptance limits.
Evidence: Imported raw CI verification and 24-scenario deployed-browser receipts; independent review is closed.
Impact: Only this task card is archived; product pins and runtime remain unchanged.
Refs: #565; Agent-System-RDM #404
(cherry picked from commit 2352f486b7)
Why: the archived task card still described pre-deployment state and the earlier CI candidate.
Evidence: PR #606 merge 6c90e6c; run 3702 passed on 8adc154; 8788 doctor and local/external HTTP checks passed.
Impact: records the actual merged, deployed, and verified outcome without product-code changes.
Refs: Agent-System-Dev PR #606
(cherry picked from commit e7d72e996a)
Why: PR #606 merged the sandbox interpreter fix and the authorized 8788 deployment is verified.
Evidence: main contains PR #606; run 3702 passed all required checks; deployed env doctor passed and local/external 8788 serve the new assets.
Impact: marks the task complete and archives its card without changing product code or submodule pins.
Refs: Agent-System-Dev PR #606
(cherry picked from commit 9e11eda11c)
Why: PR #572 merged successfully and the completed task record must be archived without leaving bookkeeping debt.
Evidence: PR head 8228043 passed run 3363 test, test-pg, and svc-realcombo; main e8d3e61 has the identical tree.
Impact: Archives only feature-agent-cli-enforcement.md; no other task card is modified.
Refs: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/572
(cherry picked from commit 65889e2013)
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=6455b54a6e2753f7d9f17ca65e62ba77fcaf81e8.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: closure re-review (head ad4485e) left the per-repo evidence sentence as an unlabelled universal claim; the API check missed Agent-System-UI (15 archived cards, not 14).
Evidence: Gitea contents API on Agent-System-UI main (SELF); PR #604 run 3694 job logs for the flaky backend tests.
Impact: docs/superpowers/plans and .task only.
Refs: PR #604
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: closure re-review (head d2fb19a) blocked the bare claim that every adoption card was archived.
Evidence: Gitea contents API on each repo main (SELF): 14 archived adoption cards, no open ones; Guidelines records adoption in policy/guidelines-adoption.md (PR #9).
Impact: docs/superpowers/plans and .task only.
Refs: PR #604
Co-authored-by: Cursor <cursoragent@cursor.com>
Why: independent review blocked a869453: CLOSED asserted cleanup of other repos without evidence and before this PR's own merge/cleanup; the archived card kept template placeholders.
Evidence: review output /tmp/review-gov-dev-closed.out (VERDICT BLOCK, SELF-held, out of tree).
Impact: docs/superpowers/plans and .task only; no code.
Refs: PR #604
Co-authored-by: Cursor <cursoragent@cursor.com>