目标(计划 U1:R1/R2/R9/R11/R13)

  • 角色权限收窄为单一「项目访问」布尔:读面过滤旧 system/user 行(保留审计数据);有效值 = allowed&&capAllowed 归一(true,true→允许;false,true→拒绝);写时双写两列、仅接受 project.create。
  • R13 门禁拆分:ReplaceRolePermissions 门禁 system.permissions.manage→system.roles.manage;角色读=system.roles.view;system grants/平台上限保持 system.permissions.manage(负控测试在)。
  • 管理员不再绕过项目创建检查(AuthorizeSystem 中 project.create 先于 is_admin/system-grant);受保护系统动作判定不变。
  • Frontend:角色编辑单「项目访问」checkbox,可编辑性只看 system.roles.manage,只读有原因文案;409 重放;旧模型测试重写。

证据

  • Backend:4 次派发(2 次合理 scope-expansion、1 次 cursor 网络失败)后 success,transport cf9c35a;过滤套件+vet PASS。
  • Frontend:1 次 success,transport 2c19439;vitest+design-guard+tsc PASS。
  • 组合:child @ 7519672(backend 03646b5 含 review 修复 + frontend 2c19439);make test-affected PASS(/tmp/pal-u1-affected3.json)。
  • 独立 Review:全新 cursor 会话;结论 BLOCKED(1)→修复(03646b5)后闭环;报告存 /tmp/pal-u1-review-output.txt,记录在任务卡。

Impact

组合 gitlink:backend c8b1b7e→03646b5、frontend dab1605→2c19439。任务卡随 PR 合入(已合入前闭合)。

Refs

计划 2026-10-19-1440 U1;L1 PR #634。

## 目标(计划 U1:R1/R2/R9/R11/R13) - 角色权限收窄为单一「项目访问」布尔:读面过滤旧 system/user 行(保留审计数据);有效值 = allowed&&capAllowed 归一(true,true→允许;false,true→拒绝);写时双写两列、仅接受 project.create。 - R13 门禁拆分:ReplaceRolePermissions 门禁 system.permissions.manage→system.roles.manage;角色读=system.roles.view;system grants/平台上限保持 system.permissions.manage(负控测试在)。 - 管理员不再绕过项目创建检查(AuthorizeSystem 中 project.create 先于 is_admin/system-grant);受保护系统动作判定不变。 - Frontend:角色编辑单「项目访问」checkbox,可编辑性只看 system.roles.manage,只读有原因文案;409 重放;旧模型测试重写。 ## 证据 - Backend:4 次派发(2 次合理 scope-expansion、1 次 cursor 网络失败)后 success,transport cf9c35a;过滤套件+vet PASS。 - Frontend:1 次 success,transport 2c19439;vitest+design-guard+tsc PASS。 - 组合:child @ 7519672(backend 03646b5 含 review 修复 + frontend 2c19439);make test-affected PASS(/tmp/pal-u1-affected3.json)。 - 独立 Review:全新 cursor 会话;结论 BLOCKED(1)→修复(03646b5)后闭环;报告存 /tmp/pal-u1-review-output.txt,记录在任务卡。 ## Impact 组合 gitlink:backend c8b1b7e→03646b5、frontend dab1605→2c19439。任务卡随 PR 合入(已合入前闭合)。 ## Refs 计划 2026-10-19-1440 U1;L1 PR #634。
weichen added 8 commits 2026-10-19 16:09:45 +00:00
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-project-access-lifecycle-u1-role-project-access.md; R0=3e70d76a20a6caf6f2edfd738a86f501c31064b6.

Impact: task metadata only; the feature workspace starts at a8557f27ed.

Refs: .task/feature-project-access-lifecycle-u1-role-project-access.md
Why: the U1 backend unit (single project-access boolean, R13 gate split,
admin bypass removal, legacy-row normalization) was delivered after four
dispatches — two legitimate scope-expansions (old-model test files, scratch
dir), one cursor network failure — and applied as transport cf9c35a.

Evidence: /tmp/pal-u1a-verify.json (build, filtered tests, vet, clean tree).

Impact: task card only.

Refs: plan 2026-10-19-1440 U1; PR #634.
Why: the U1 frontend unit (single project-access checkbox gated by
system.roles.manage, legacy dual-control model removed, tests rewritten)
was delivered in one cursor dispatch and applied as transport 2c19439.

Evidence: /tmp/pal-u1b-verify2.json (vitest suites + design guard + tsc).

Impact: task card only.

Refs: plan 2026-10-19-1440 U1; PR #634.
Why: the composed child (backend cf9c35a + frontend 2c19439) passed
make test-affected; recording it fixes the dirty checkout that blocked the
review dispatch.

Evidence: /tmp/pal-u1-affected.json (exit 0).

Impact: task card only.

Refs: PR #634.
Record independent review closure and final composition
ci / svc-realcombo (pull_request) Skipped
ci / test (pull_request) Failing after 3s
ci / test-pg (pull_request) Skipped
0c5a5674d6
Why: the independent reviewer blocked on the missing provider-failure test
scenario; the repair transport 03646b5 added it and the filtered suite
passes. pins2 mistakenly reverted the frontend pin and pins3 restored the
final composition (backend 03646b5 + frontend 2c19439).

Evidence: /tmp/pal-u1-affected3.json (test-affected exit 0 on 7519672).

Impact: task card only.

Refs: PR #634.
weichen added 1 commit 2026-10-19 16:09:53 +00:00
Fold-close the task card before merge
ci / test-pg (pull_request) Skipped
ci / test (pull_request) Successful in 8m56s
ci / svc-realcombo (pull_request) Skipped
7e3d09faf9
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-project-access-lifecycle-u1-role-project-access.md -> .task/archive/feature-project-access-lifecycle-u1-role-project-access.md; status 已完成(合入前闭合); PR #637 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/637.
Impact: task metadata only; the card is archived within PR #637 and lands with its merge commit.
Refs: task.sh close --self
weichen merged commit a32e2227b0 into feature/project-access-lifecycle 2026-10-19 16:21:47 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Dev#637