Pin Documents to the GenUI prod upgrade record #679

Merged
weichen merged 4 commits from feature/genui-prod-upgrade-docsync into main 2026-10-21 13:18:37 +00:00
Owner

Summary

Pin modules/documents to 2e9c3bc (Documents #119), which records the 2026-10-21 GenUI prod upgrade: prod now runs dev@5360884 (schema v25 → v51) and both prod and pg1 are managed by scripts/svc.sh in the main checkout.

The upgrade itself was an out-of-repo operation (backups, rehearsal on a DB copy, adopt → agent-system migrate → svc.sh prod deploy); its facts and verification are recorded on the task card.

Why: the closure doc and the Dev pin should reflect the upgraded prod.
Evidence: Documents #119 CI success at 518e381; agent-exec receipts on the task card.
Impact: documentation pin and task card only.
Refs: task card .task/feature-genui-prod-upgrade-docsync.md (same document as this PR description).

## Summary Pin `modules/documents` to 2e9c3bc (Documents #119), which records the 2026-10-21 GenUI prod upgrade: prod now runs `dev@5360884` (schema v25 → v51) and both `prod` and `pg1` are managed by `scripts/svc.sh` in the main checkout. The upgrade itself was an out-of-repo operation (backups, rehearsal on a DB copy, adopt → `agent-system migrate` → `svc.sh prod deploy`); its facts and verification are recorded on the task card. Why: the closure doc and the Dev pin should reflect the upgraded prod. Evidence: Documents #119 CI success at 518e381; agent-exec receipts on the task card. Impact: documentation pin and task card only. Refs: task card `.task/feature-genui-prod-upgrade-docsync.md` (same document as this PR description).
weichen added 3 commits 2026-10-21 13:01:24 +00:00
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/feature-genui-prod-upgrade-docsync.md; R0=e634608d97333354c3ead85d47c9e9e368a992a0.

Impact: task metadata only; the feature workspace starts at e634608d97.

Refs: .task/feature-genui-prod-upgrade-docsync.md
Why: Documents PR #119 records the 2026-10-21 prod upgrade to dev@5360884
(schema v25 to v51) with prod and pg1 managed by scripts/svc.sh.
Evidence: agent-exec unit dev-genui-prod-upgrade-docsync-repin (cursor,
attempt 1, terminal=success); gitlink fcea466 -> 2e9c3bc.
Impact: Documentation pin only.
Refs: Documents #119; task feature/genui-prod-upgrade-docsync

Co-authored-by: Cursor <cursoragent@cursor.com>
Record the prod upgrade facts and receipts on the task card
ci / svc-realcombo (pull_request) Successful in 4m51s
ci / test (pull_request) Successful in 11m15s
ci / test-pg (pull_request) Successful in 16m31s
8dc8edf3a8
Why: The card must carry the authorization, the out-of-repo upgrade steps,
the verification results and the agent-exec receipts for both units.
Evidence: Receipts /tmp/genui-prod-upgrade-doc/{docs,dev}-run.json;
Documents #119 CI success at 518e381.
Impact: Task card only.
Refs: Documents #119

Co-authored-by: Cursor <cursoragent@cursor.com>
weichen added 1 commit 2026-10-21 13:01:30 +00:00
Fold-close the task card before merge
ci / svc-realcombo (pull_request) Successful in 4m32s
ci / test (pull_request) Successful in 11m4s
ci / test-pg (pull_request) Successful in 16m42s
37c6e0a883
Why: close the task card inside its own PR so landing it needs no post-merge backfill or separate close PR.
Evidence: .task/feature-genui-prod-upgrade-docsync.md -> .task/archive/feature-genui-prod-upgrade-docsync.md; status 已完成(合入前闭合); PR #679 https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/679.
Impact: task metadata only; the card is archived within PR #679 and lands with its merge commit.
Refs: task.sh close --self
weichen merged commit ccb6dfaa9c into main 2026-10-21 13:18:37 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Dev#679