Adopt the DESIGN.md constitution and land the four-phase UI redesign (gitlinks) #107

Merged
weichen merged 9 commits from feature/ui-tokens-v3 into main 2026-10-01 02:00:49 +00:00
9 Commits
Author SHA1 Message Date
weichen f8af2f1ccb Record PR #107 as the task master record
ci / test (pull_request) Failing after 31s
Why: The task card requires the PR link as its master record once the
PR exists (delivery workflow); sub-PR numbers recorded for merge order.
Evidence: PRs created via Gitea API — UI #23, Frontend #24, Dev #107.
Impact: task card only.
Refs: task feature/ui-tokens-v3.
2026-09-30 19:33:22 +00:00
weichen e50426e9f2 Record the sync checkpoint
ci / test (pull_request) Failing after 1m31s
2026-09-30 19:31:01 +00:00
weichen 6b78db5977 Merge remote-tracking branch 'origin/main' into feature/ui-tokens-v3 2026-09-30 19:31:01 +00:00
weichen b35ea7058f Advance submodule gitlinks to post-merge heads
Why: Submodule branches merged their origin/main (CF3) and were pushed;
record the new heads so the parent sync merges cleanly.
Evidence: submodules green post-merge (ui 68 / frontend 39 tests, tsc
clean); parent task-sync re-run follows this commit.
Impact: gitlinks only.
Refs: task feature/ui-tokens-v3.
2026-09-30 19:30:58 +00:00
weichen c0f0200abd Advance submodule gitlinks: phase 4 chat flow and motion
Why: Land phase 4 of the UI redesign in the parent repo: ToolBlock chat
contract, Collapsible migration of all folds, live sweep with worked-time,
and the honest in-progress input hint. Completes the four-phase plan on
this branch (deviation recorded in the task card).
Evidence: combined make test -> go core/backend/agent-command ok, frontend
39 vitest passed, ui 66 vitest passed; tsc clean in both submodules.
Impact: modules/ui and modules/frontend gitlinks move to their
feature/ui-tokens-v3 heads; task card records results and remaining items.
Refs: task feature/ui-tokens-v3.
2026-09-30 19:26:39 +00:00
weichen f323d3f417 Advance frontend gitlink: artifact preview convergence (phase 3)
Why: Land phase 3 of the UI redesign in the parent repo.
Evidence: frontend submodule commit on feature/ui-tokens-v3; tsc -b and
38 vitest tests pass; task card records the runs.
Impact: modules/frontend gitlink moves; no API changes.
Refs: task feature/ui-tokens-v3.
2026-09-30 19:14:31 +00:00
weichen 05ebf3d9e1 Advance frontend gitlink: admin zone IA (phase 2)
Why: Land phase 2 of the UI redesign in the parent repo: admin-only
full-screen system management, conversation-first sidebar, role-aware
workspace shortcuts.
Evidence: frontend submodule commit on feature/ui-tokens-v3; tsc -b and
38 vitest tests pass in the submodule; combined make test re-run recorded
at phase boundaries in the task card.
Impact: modules/frontend gitlink moves; no API or contract changes.
Refs: task feature/ui-tokens-v3.
2026-09-30 19:11:20 +00:00
weichen 80a4fa5e32 Adopt DESIGN.md constitution and phase-1 Zai visual foundation
Why: The approved frontend redesign requires a durable design constitution
so future UI work stays consistent (user directive: make this project's
standing design guidance, four principles: beautiful/modern/concise/usable).
DESIGN.md encodes the Zai-calibrated rules (surface ladder, type scale,
radius nesting, MotionKit recipes, ToolBlock contract, IA principles) and
AGENTS.md adds a mandatory UI gate; submodules land phase 1 (tokens v3,
MotionKit, Collapsible, panel layout, mono primary buttons).
Evidence: make test in this worktree -> frontend 38 passed (incl. new
host design-guard ratchet), ui 61 passed (incl. collapsible + design-guard),
go core/backend/agent-command ok. precheck READY at R0 0be23f9a4d.
Impact: gitlinks advance to Agent-System-UI/Agent-System-Frontend
feature/ui-tokens-v3 heads; AGENTS.md gains a UI section; no backend or
contract changes.
Refs: session-approved redesign plan v2 (8 decisions recorded in task card).
2026-09-30 19:02:22 +00:00
weichen 7e9d666785 Record the task card for feature-ui-tokens-v3 2026-09-30 18:27:24 +00:00