T3: pin the command-bus combo (cmdbus, InlineConfirmCard, symmetric entries) #21

Merged
weichen merged 3 commits from feature/command-bus-r1 into main 2026-09-30 07:56:27 +00:00
3 Commits
Author SHA1 Message Date
weichen b9d4df0561 Record the sync checkpoint
ci / test (pull_request) Failing after 1m35s
2026-09-30 07:56:03 +00:00
weichen 0cc7725611 Pin the T3 command-bus combo: cmdbus backend, InlineConfirmCard, wiring
Why: T3 submodule PRs merged (backend #10, ui #7, frontend #6, documents #11) and the Dev combo must pin the verified combination.
Evidence: combo make test PASS at pinned heads (backend 15 pkgs incl. cmdbuf; ui 18/18; frontend 9/9); record at documents docs/records/2026-09-30-t3-command-bus-verification.md (PR#11).
Impact: gitlinks backend=0f74026 frontend=6a2b21a ui=76f976d documents=<PR#11 head>; task card backfilled; no Dev-side code change.
Refs: task card feature/command-bus-r1; proposal T3
2026-09-30 07:56:02 +00:00
weichen f6ee9f0ebe Record the task card for feature-command-bus-r1 2026-09-30 07:38:51 +00:00