Why: Agent-Squad PR #25 and Backend PR #81 landed; Dev pins must
point at those merged component main heads.
Evidence: check-pins exit=0.
Impact: Two gitlinks.
Refs: Agent-Squad PR #25; Agent-System-Backend PR #81
Why: WP4/WP6/WP7 landed with the three closing-out items; the
record carries the acceptance mapping.
Evidence: Agent-Squad #25 and Backend #81 merged; make test exit=0
at cc6970c7.
Impact: Task card only.
Why: Agent-Squad PR #25 and Backend PR #81 landed; Dev pins must
point at those merged component main heads.
Evidence: check-pins exit=0.
Impact: Two gitlinks.
Refs: Agent-Squad PR #25; Agent-System-Backend PR #81
Why: WP4/WP6/WP7 landed with the three closing-out items; the
record carries the acceptance mapping.
Evidence: Agent-Squad #25 and Backend #81 merged; make test exit=0
at cc6970c7.
Impact: Task card only.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Pin the merged Store and termination work(Q1 增量三的 Dev 指针推进)
Q1 任务进行中的增量交付(任务不闭合,SQLite 收编继续)。
内容
deps/agent-squad→ 1c3995be(Agent-Squad PR #25:Store 端口、三档检查点、图连续性校验、Termination 收编与 Q23/Q26/Q6 关账)modules/backend→ 5883d108(Backend PR #81:嵌套级联)验证
check-pins.shexit=0;make testexit=0 @ cc6970c7(receipt 入卡)。主任务:Dev 仓
feature/agent-stack-q1。