Why: Agent-Squad PR #26 and Backend PR #82 landed; Dev pins must
point at those merged component main heads.
Evidence: check-pins exit=0.
Impact: Two gitlinks.
Refs: Agent-Squad PR #26; Agent-System-Backend PR #82
Why: All seven work packages landed; the card carries the three
acceptance clauses' evidence and the follow-ups.
Evidence: CI success on the two PRs of this increment; make test
exit=0 at 516cdf62; all module suites green.
Impact: Task card only.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Pin the merged SQLite convergence(Q1 增量四的 Dev 指针推进)
Q1 任务随此 PR 进入验收/闭合流程。
内容
deps/agent-squad→ eba77e78(Agent-Squad PR #26:SQLiteStore、单库挂载、X6、端口导出)modules/backend→ 32611351(Backend PR #82:嵌套级联)验证
check-pins.shexit=0;make testexit=0 @ 516cdf62(receipt 入卡)。主任务:Dev 仓
feature/agent-stack-q1。