Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-agent-exec-routing-sandbox-plan.md; R0=890b9b2bf2e9b356351d373a21f358ea04ca958b.
Impact: task metadata only; the feature workspace starts at 890b9b2bf2.
Refs: .task/feature-agent-exec-routing-sandbox-plan.md
Why: The proposal 2026-10-10-agent-delegation-routing-sandbox.md merged
into Documents main (#53) and needs a Dev-side pin plus its task card so
the research, the F1-F5 defect findings, and the E1-E5/S0 increment plan
have a tracked record with evidence receipts.
Evidence: Task card feature-agent-exec-routing-sandbox-plan carries five
SELF receipts (sandbox latency benchmarks, model-endpoint probes) and the
make-test/task-sync runs are appended before the PR; Documents #53 merged
at 0f6d697.
Impact: Gitlink-only bump for modules/documents (3e43193 -> 0f6d697) plus
the task card; no product code changes.
Refs: Documents PR #53; proposals/2026-10-10-agent-delegation-routing-sandbox.md.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d53efd5f14bb339dfe908c5d8850ed0eedec024e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
主记录(Documents #53,merge 0f6d697):docs/proposals/2026-10-10-agent-delegation-routing-sandbox.md——委派 D1–D5、角色路由 R1–R4、任务沙箱 L0–L2(仅记录)、分期 E1–E5/S0;现网缺陷 F1–F5 全部定位到源码/实测。
本 PR:documents gitlink 3e43193→0f6d697 + 任务卡(含 SELF 收据:沙箱延迟基准、模型端点探针、make test、task-sync)。无产品代码改动;实施增量待授权。
Evidence: make test PASS(收据块);CI 于 PR HEAD 复核(GATE)。