Docs + pins only. Plan r1 approved by the user on 2026-10-11 (instruction: start the transformation per the plan).
- documents PR #59: proposal r1, index entry, static review record, SELF audit receipt.
- Dev: pin documents 95e5c9d3, PROJECT.md entry, task card with authorization record, stage-review verdicts, precheck/task-sync/make-test evidence (evidence tool, SELF).
- Implementation starts with U1+U2 in a follow-up task per plan section 5.
Task card: .task/feature-collaboration-storage-plan.md
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-collaboration-storage-plan.md; R0=73c901fa341a3653d6e0826d0da3497507995482.
Impact: task metadata only; the feature workspace starts at 73c901fa34.
Refs: .task/feature-collaboration-storage-plan.md
Why: the user approved plan r1 on 2026-10-11 (instruction to start the transformation per the plan); the card must carry the authorization basis and stage-review verdicts before publication.
Evidence: user instruction quoted verbatim in the card; resume precheck receipt imported (receipt_sha256 e8e77e87fc5990b9...).
Impact: task metadata and PROJECT.md entry only; plan content lives in the documents component PR #59.
Refs: documents PR #59; plan section 5 first increment U1+U2.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d9cd5c7dbe8bc62a8abd02f9f8f9014730be88af.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: the approved plan r1 landed on documents main via PR #59; the Dev parent must pin it for the combined build.
Evidence: documents origin/main=95e5c9d307626727db2d1df3b42d74873bc8bbe4 containing proposal r1, index entry, review record, audit receipt.
Impact: gitlink only; no code or runtime change.
Refs: documents PR #59.
Why: cross-repo gitlink changes require combined make test evidence before the Dev PR.
Evidence: make test exit 0 recorded by the evidence tool (governance, pins, libs, modules all green).
Impact: task card evidence table only.
Refs: documents PR #59; gitlink pin 45e08b9.
Why: the card and PR description are one document; the PR link must be recorded on the branch before merge.
Evidence: Dev PR #320 and documents PR #59 created via Gitea API.
Impact: task metadata only.
Refs: PR #320.
weichen
merged commit f7bfbc78a1 into main2026-10-11 02:44:47 +00:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Docs + pins only. Plan r1 approved by the user on 2026-10-11 (instruction: start the transformation per the plan).
Task card: .task/feature-collaboration-storage-plan.md