Why: The user ruled 2026-10-11 to evaluate the landed U1-U5 capability through real use before deciding U6 - the four-step plan reaches its user-controlled boundary: steps 1-3 (controlled trial, read-only loop, interactive loop) are merged and closed; step 4 (workspace) waits on the owner benefit verdict that the plan itself requires.
Evidence: Task card carries precheck/task-sync/make test receipts (make evidence, SELF; one flaky runmgr recovery test failed once and passed on rerun, noted); CI ci/test on PR HEAD is the authoritative gate. Documents PR #72 carries the master-record gate note.
Why: The user ruled 2026-10-11 to evaluate the landed U1-U5 capability through real use before deciding U6 - the four-step plan reaches its user-controlled boundary: steps 1-3 (controlled trial, read-only loop, interactive loop) are merged and closed; step 4 (workspace) waits on the owner benefit verdict that the plan itself requires.
Evidence: Task card carries precheck/task-sync/make test receipts (make evidence, SELF; one flaky runmgr recovery test failed once and passed on rerun, noted); CI ci/test on PR HEAD is the authoritative gate. Documents PR #72 carries the master-record gate note.
Impact: documents gitlink + task card only.
Refs: modules/documents/docs/proposals/2026-10-10-generative-ui-plugin.md (r2 U6 note); task card feature/generative-ui-u6-gate-record
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-generative-ui-u6-gate-record.md; R0=fefb3e060ec05cdadc6ee8bc55abff730fe79e21.
Impact: task metadata only; the feature workspace starts at fefb3e060e.
Refs: .task/feature-generative-ui-u6-gate-record.md
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Why: The user ruled 2026-10-11 to evaluate the landed U1-U5 capability through real use before deciding U6 - the four-step plan reaches its user-controlled boundary: steps 1-3 (controlled trial, read-only loop, interactive loop) are merged and closed; step 4 (workspace) waits on the owner benefit verdict that the plan itself requires.
Evidence: Task card carries precheck/task-sync/make test receipts (make evidence, SELF; one flaky runmgr recovery test failed once and passed on rerun, noted); CI ci/test on PR HEAD is the authoritative gate. Documents PR #72 carries the master-record gate note.
Impact: documents gitlink + task card only.
Refs: modules/documents/docs/proposals/2026-10-10-generative-ui-plugin.md (r2 U6 note); task card feature/generative-ui-u6-gate-record