Backfill the material-intake task card (PR links, stage conclusions) #391

Merged
weichen merged 3 commits from feature/material-intake-flow into main 2026-10-11 17:59:24 +00:00
3 Commits
Author SHA1 Message Date
weichen 9f02016cc4 Record the sync checkpoint
ci / test-pg (pull_request) Successful in 1m1s
ci / test (pull_request) Successful in 2m28s
Why: bind the task validation checkpoint to the latest integration baseline.

Evidence: SELF recursive component checks; sync_base=cef97ce34e0c77c83d24c9b4f39b94fb7a19ee2c; candidate=f004e39ac5acea7a68a2df61ad405210a3015ab3.

Impact: task metadata only.

Refs: .task/feature-material-intake-flow.md
2026-10-11 17:56:05 +00:00
weichen f004e39ac5 Merge authoritative main into the task branch
Why: include the current integration baseline before verification.

Evidence: fetched origin/main=cef97ce34e0c77c83d24c9b4f39b94fb7a19ee2c.

Impact: integrate upstream changes without rewriting task history.

Refs: task-sync
2026-10-11 17:55:46 +00:00
weichen 740f711ee9 Backfill completion status, PR links, and stage conclusions
ci / test-pg (pull_request) Successful in 1m0s
ci / test (pull_request) Successful in 2m27s
Why: card closure requires the real PR link and completion backfill before archiving.
Evidence: links to merged PRs #48/#161/#390 and CI commit statuses (GATE).
Impact: task card only.
2026-10-11 17:48:35 +00:00