Why: include the current integration baseline before verification.
Evidence: fetched origin/main=b6307db015da4a3718baadb242c52cb66b024f74.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=9a9665b458916179df6d94066dfb9aa657a13d60.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: task-sync ahead of review; main advanced via #414/#415 (admin-zone
hosting, U1 instance identity).
Evidence: frontend merge verified (vitest/knip/build); dev-level make test
and e2e rerun on this head follow as evidence receipts.
Impact: resolves the modules/frontend gitlink to the component merge head.
Refs: parent evidence in this task card.
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=37e3229538d64867a6a074020a072da925244fcc.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: keep the dev-repo pin in lockstep with the unexport fix so make test
passes on the task HEAD.
Evidence: frontend vitest + knip pass; full make test evidence row follows.
Impact: modules/frontend pin follows the unexport head.
Refs: 2026-10-12 diagnostic report, increment 2.
Why: keep the dev-repo pin in lockstep with the spec fix.
Evidence: frontend commit follows; full e2e rerun recorded in the task card.
Impact: modules/frontend pin 986ebdb -> spec-fix head.
Refs: 2026-10-12 diagnostic report, increment 2.
Why: the rdm-audit entry must hide on plain bases lacking rdm.inspect.*
commands (2026-10-12 diagnostic, increment 2), and the dev-repo e2e driver
needs a plain-base phase to prove it end to end.
Evidence: frontend e058adc carries the gating (vitest 23 files / 112 tests
incl. new contract matrix; tsc -b && vite build pass); full e2e rerun
follows this commit (RDM combo + plain base phases).
Impact: modules/frontend pin 360d640 -> e058adc; scripts/e2e.sh gains
phase 4 (same $DATA served by the base CLI, plain-base.playwright.ts);
task card records scope, authorization chain and stage table.
Refs: 2026-10-12 diagnostic report, increment 2.
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-rdm-audit-capability-gate.md; R0=475654363de3ec72df68d246ffab8217b1cfeab6.
Impact: task metadata only; the feature workspace starts at 475654363d.
Refs: .task/feature-rdm-audit-capability-gate.md