Dev now records the approved DHF r0.1 plan and the current U1 asset increment against a fixed Documents component. The project entry and task card distinguish the owner-accepted four Word packages from the unpublished 44-asset catalog and the remaining fidelity work. This PR updates the Documents gitlink and delivery record; the RDM asset loader is delivered by its separate merged PR.
Evidence
Dev fixes modules/documents at 6619835a65adb7c9864ea794f1bb465885fde7b8. Documents PR #102 merged at 9062445db8082976a124e54a0000007b6391d6cf. RDM PR #365 independently merged at 57d2214feb0ac4a534fa58623fff7d02f93a860a.
Stage 8 cross-repository reviewer independently ran make test at clean Dev head 889f64f881 before reading author evidence; exit 0. The reviewer recovered the approved r0.1 plan bytes after removing only the dated status addendum, checked links, and verified the exact Documents gitlink. Local make test/build at the synced component combination are recorded as SELF in the task card.
PR-head run 3092 completed test, test-pg and svc-realcombo successfully at exact head 889f64f881 on home-runner (GATE). Final manual window sync used make evidence, returned changed=0 on base d23fb4363d, and preserved the same head and gitlink.
Merge Danger
Door: two-way. Blast Radius: Dev planning entry and Documents gitlink. Four exact Word packages have owner decisions, while 14 DOC Word fidelity remains NOT_PASSED, 40 other packages await review, all 44 assets remain needs-review and 0 templates are published. No runtime implementation, database migration, deployment or release is included in this Dev PR.
## Summary
Dev now records the approved DHF r0.1 plan and the current U1 asset increment against a fixed Documents component. The project entry and task card distinguish the owner-accepted four Word packages from the unpublished 44-asset catalog and the remaining fidelity work. This PR updates the Documents gitlink and delivery record; the RDM asset loader is delivered by its separate merged PR.
## Evidence
- Dev fixes modules/documents at 6619835a65adb7c9864ea794f1bb465885fde7b8. [Documents PR #102](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/102) merged at 9062445db8082976a124e54a0000007b6391d6cf. [RDM PR #365](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-RDM/pulls/365) independently merged at 57d2214feb0ac4a534fa58623fff7d02f93a860a.
- Stage 8 cross-repository reviewer independently ran make test at clean Dev head 889f64f88167a5314ebfa42a41f9c7a57f91b404 before reading author evidence; exit 0. The reviewer recovered the approved r0.1 plan bytes after removing only the dated status addendum, checked links, and verified the exact Documents gitlink. Local make test/build at the synced component combination are recorded as SELF in the task card.
- The owner accepted the affected [Stage 7 recheck package](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/540#issuecomment-6049) SHA256 2ade2bf456d79fa103d37a2d015b4c23a7b717a423b1c1b4115a03ce6e962757; [decision record](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/540#issuecomment-6051).
- [PR-head run 3092](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/actions/runs/3092) completed test, test-pg and svc-realcombo successfully at exact head 889f64f88167a5314ebfa42a41f9c7a57f91b404 on home-runner (GATE). Final [manual window](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/issues/518#issuecomment-6059) sync used make evidence, returned changed=0 on base d23fb4363dcc0a206e71e47f9cd23a644c7e1c70, and preserved the same head and gitlink.
## Merge Danger
**Door:** two-way. **Blast Radius:** Dev planning entry and Documents gitlink. Four exact Word packages have owner decisions, while 14 DOC Word fidelity remains NOT_PASSED, 40 other packages await review, all 44 assets remain needs-review and 0 templates are published. No runtime implementation, database migration, deployment or release is included in this Dev PR.
Why: establish the authorized task workspace and its initial baseline.
Evidence: preserved precheck receipt in .task/feature-dhf-template-pipeline-plan.md; R0=add097d06137c4912a4ed9279e98ca353e4e4cf1.
Impact: task metadata only; the feature workspace starts at add097d061.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: Resume the approved DHF work from saved planning artifacts and a clean task tree.
Evidence: Startup failure and combination-check receipts are retained in the task card.
Impact: Planning entry, task authorization and Documents composition only.
Refs: feature/dhf-template-pipeline-plan; DHF plan r0.1
Why: Keep the Dev project entry and task record aligned with the approved DHF implementation and saved U1 evidence.
Evidence: SELF make test passed on the Dev combination with Documents c256558; the complete output is in the task card.
Impact: Advances only the Documents pin and progress metadata; no template publication, migration, or deployment.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the Dev project entry and task record aligned with the owner semantic decision and the RDM pilot package.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on df17ed1; the exact receipts are in the RDM task card.
Impact: Progress metadata only; E1 fidelity, publication, U2-U6, and deployment remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration project entry aligned with the owner-approved pilot package while preserving the unpublished state.
Evidence: SELF RDM make test passed on e21a82b; owner acceptance and four artifact digests are recorded in the RDM task card.
Impact: Progress metadata only; E1, F01/F02 purpose, U1 completion and release remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration project entry aligned with the owner F01/F02 purpose and stage decisions.
Evidence: SELF RDM make test passed on cdb66c5; detailed source and dictionary checks are in the RDM task card.
Impact: Progress metadata only; no dictionary registration, running data migration, or template publication.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration task aligned with the two unpublished process-validation Word packages and their owner review boundary.
Evidence: SELF RDM make task-sync and GOWORK=off make test passed on 10933dc; receipts remain in the RDM task card.
Impact: Progress metadata only; no Documents pin, dictionary, live data, or publication change.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: Keep the integration entry aligned with the separate project-proposal, F01 and F02 package decisions.
Evidence: SELF RDM make test passed on 87fa010; owner four-hash decisions are recorded in the RDM task card.
Impact: Progress metadata only; 44 assets remain unpublished and 14 DOC fidelity reviews remain open.
Refs: DHF r0.1 U1, feature/dhf-template-pipeline-plan
Why: The Dev project entry and task card still described only three accepted packages after the DI owner review.
Evidence: RDM DI catalog binds four exact hashes and RDM local tests/build passed at 9997990; Dev git diff --check receipt is in this task card.
Impact: Progress record only; Documents pin, publication state, deployment and runtime data are unchanged.
Refs: PROJECT.md; .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=4f84c2e1630cd0311643529fae1c3a99f1dd5d64.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Dev main and component pins advanced before the U1 increment review, so the new combination needed its own test and build evidence.
Evidence: make task-sync, make test, and make build exited 0 with SELF receipts at the synchronized Dev checkpoint 71fabf3120.
Impact: Task evidence only; no component or plan-body changes beyond the synchronized main composition.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The Dev task card must preserve the manual stage boundary before formal verification begins.
Evidence: Owner confirmed the fixed U1 review object with 14 DOC fidelity and 40 assets still open.
Impact: Stage state only; no component, publication or deployment change.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=427e9faf47641a427c5f2173244f65b8867c4500.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The synchronized Dev combination has a new exact test/build receipt for the current DHF increment.
Evidence: make task-sync, make test and make build at 6b5cc2de58 exited 0; source is SELF in the task card.
Impact: Task record only; PR HEAD CI, owner acceptance and deployment remain pending.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The Documents main gained an unrelated merge-queue report before PR submission, so the feature branch must include the current authoritative base.
Evidence: Comparing c256558 and fdca353 shows only the merge-queue report changed; the DHF plan, index and asset inventory retain their bytes. Dev combination tests follow on this exact pin.
Impact: Update the Documents gitlink and stage-seven trace; no DHF package, publication or runtime data change.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: The updated Documents pin needed fresh combined tests before its PR candidate could be fixed.
Evidence: make task-sync changed=0; make test and make build exited 0 at f628e6b with SELF receipts.
Impact: Task evidence only; publication and deployment remain untouched.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d40579ed7fe3bbca68d3c6fcd1bce6707688d59e.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: Dev main advanced before the WIP PR, so the fixed Documents pin needed fresh combination evidence on the new base.
Evidence: make task-sync incorporated d40579e; make test and make build exited 0 at 5f88fd6 with SELF receipts.
Impact: Task evidence only; CI/GATE and final merge window remain pending.
Refs: .task/feature-dhf-template-pipeline-plan.md
Why: Stage 8 review found that the main plan still described the approved increment as a draft.
Evidence: Documents commit 6619835 adds a dated status note without changing the approved plan body; the first pre-commit combination check correctly rejected the uncommitted pin drift.
Impact: Dev now records the exact Documents component SHA for renewed combination validation.
Refs: Documents PR #102; Dev PR #540; DHF U1 Stage 8 review
Why: include the current integration baseline before verification.
Evidence: fetched origin/main=d23fb4363dcc0a206e71e47f9cd23a644c7e1c70.
Impact: integrate upstream changes without rewriting task history.
Refs: task-sync
Why: The Documents pin and authoritative base changed after the prior Stage 7 GATE.
Evidence: make evidence captured sync, make test, and make build on the new component combination; the initial uncommitted-pin failure remains recorded.
Impact: Dev task card identifies the tested Documents SHA and awaits current-head CI and review.
Refs: Dev PR #540; Documents PR #102; DHF U1 Stage 8 review
该结论覆盖 Documents #102 head 6619835、RDM #365 head a0024d1、Dev #540 head 889f64f 的当前增量验证;RDM GATE run3093 与 Dev GATE run3092 绑定各自精确 HEAD。Stage 8 独立 Spec/Standards/Crossrepo Review 已 PASS。14 DOC Word 保真 NOT_PASSED,40 项待包级评审、0 模板发布;不授权发布、部署、数据库迁移或 U1 全量收官。合入前仍须最终同步、最终 HEAD CI 和 #518 手动窗口核验。
<!-- dhf-u1-stage7-recheck-20261014-01a137f8 -->
DHF U1 当前增量阶段 7 受影响复核:owner 在本聊天对[确切审阅包](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/pulls/540#issuecomment-6049) SHA256 2ade2bf456d79fa103d37a2d015b4c23a7b717a423b1c1b4115a03ce6e962757 答复:“接受当前增量复核,继续合入核验”。本条于 2026-10-14T08:02:08Z 后登记,时间仅为记录时刻。
该结论覆盖 Documents #102 head 6619835、RDM #365 head a0024d1、Dev #540 head 889f64f 的当前增量验证;RDM GATE run3093 与 Dev GATE run3092 绑定各自精确 HEAD。Stage 8 独立 Spec/Standards/Crossrepo Review 已 PASS。14 DOC Word 保真 NOT_PASSED,40 项待包级评审、0 模板发布;不授权发布、部署、数据库迁移或 U1 全量收官。合入前仍须最终同步、最终 HEAD CI 和 #518 手动窗口核验。
weichen
changed title from WIP: Track DHF delivery against fixed Documents plan to Track DHF delivery against the fixed Documents plan2026-10-14 08:07:49 +00:00
weichen
merged commit 11aa76a3bc into main2026-10-14 08:08:07 +00:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Summary
Dev now records the approved DHF r0.1 plan and the current U1 asset increment against a fixed Documents component. The project entry and task card distinguish the owner-accepted four Word packages from the unpublished 44-asset catalog and the remaining fidelity work. This PR updates the Documents gitlink and delivery record; the RDM asset loader is delivered by its separate merged PR.
Evidence
889f64f881before reading author evidence; exit 0. The reviewer recovered the approved r0.1 plan bytes after removing only the dated status addendum, checked links, and verified the exact Documents gitlink. Local make test/build at the synced component combination are recorded as SELF in the task card.889f64f881on home-runner (GATE). Final manual window sync used make evidence, returned changed=0 on based23fb4363d, and preserved the same head and gitlink.Merge Danger
Door: two-way. Blast Radius: Dev planning entry and Documents gitlink. Four exact Word packages have owner decisions, while 14 DOC Word fidelity remains NOT_PASSED, 40 other packages await review, all 44 assets remain needs-review and 0 templates are published. No runtime implementation, database migration, deployment or release is included in this Dev PR.
DHF U1 当前增量:阶段 8 整改后的阶段 7 影响复核
日期:2026-10-14;对象仅为阶段 6 已确认的 U1 资产合同、E1/E1-R1 真实结果与四份 owner 已接受的固定 Word 包。旧阶段 7 审阅索引 SHA256 706d10a44b09191e37d7efef417481d8401b25616187bb18ebc2ca336428b2a4;owner 曾答复“接受当前增量验证,进入 Review”。本次因 Stage 8 修正而重新固定受影响对象。
889f64f881旧 RDM 3467a178a13cc858c632bf34369d2e79221ac576/run 3086 与旧 Dev 6463ef430640c56940b82776adb504ee272f030c/run 3088 仅为历史;本次不借用旧 GATE。新平台回读包含 PR、完整 HEAD、run、actor、runner、所有 job 与结论,原始 JSON SHA256 bfce44c17dec34bd577997d6214e6bceef3b07517cd131b464cd25ea18105a58,保存在同目录 gate.json。RDM 同步检查点 75a57dd 上 GOWORK=off make test/build 均 SELF exit 0;Dev 同步检查点
5368460上 make test/build 均 SELF exit 0,原始输出由各自任务卡 make evidence 保存。独立 Stage 8 审阅结论:RDM 规格审阅者在 8c4179e 重放直接相关正反例 exit 0,并在最终 a0024d1 核对后续仅文档/任务卡变化,Spec PASS;标准审阅者在 a0024d1 重放相关测试 exit 0,核对 7 份审阅索引与旧 GATE JSON 从 Git 取回且 8/8 字节一致,Standards PASS。跨仓审阅者在读取作者证据前于 Dev
889f64f独立执行 make test exit 0,核对 Documents 正文与批准 SHA、gitlink、主干祖先,PASS。旧索引中的 PDF/PNG 链接仍是本机历史附件;仓内保留确切索引文本和四份包的原件/规范化/结构/渲染文件。仍开放:14 份 DOC 转换候选的 Word 保真 NOT_PASSED,40 项包级评审待办;44 项目录均 needs-review、0 published,四包 publication-authorization open。F01/F02 正式类型注册、真实三角色生成/审签/导出、U2–U6、运行库迁移与部署均未由本次验证证明。
请求裁定:是否接受上述新固定对象的当前 U1 增量阶段 7 验证结果,并允许智能体按已通过的 Stage 8 Review 继续阶段 9 合入核验?此裁定不批准模板发布、部署、数据库迁移、14 DOC 保真或 U1 全量收官。合入前仍需重新同步目标、当前最终 HEAD CI、平台准入与 Dev #518 手动窗口核验;若只产生任务卡同步提交且代码/包/组件不变,则按影响判断重验,不自动继承旧 CI。
DHF U1 当前增量阶段 7 受影响复核:owner 在本聊天对确切审阅包 SHA256 2ade2bf456d79fa103d37a2d015b4c23a7b717a423b1c1b4115a03ce6e962757 答复:“接受当前增量复核,继续合入核验”。本条于 2026-10-14T08:02:08Z 后登记,时间仅为记录时刻。
该结论覆盖 Documents #102 head 6619835、RDM #365 head a0024d1、Dev #540 head
889f64f的当前增量验证;RDM GATE run3093 与 Dev GATE run3092 绑定各自精确 HEAD。Stage 8 独立 Spec/Standards/Crossrepo Review 已 PASS。14 DOC Word 保真 NOT_PASSED,40 项待包级评审、0 模板发布;不授权发布、部署、数据库迁移或 U1 全量收官。合入前仍须最终同步、最终 HEAD CI 和 #518 手动窗口核验。WIP: Track DHF delivery against fixed Documents planto Track DHF delivery against the fixed Documents planDHF U1 当前增量:阶段 10 合入核验与安全收口审阅
日期:2026-10-14;对象是已获 owner 阶段 6、两次阶段 7 当前增量结论及 Stage 8 独立 Review 的 U1 资产合同、E1/E1-R1 结果和四份确切人工接受包。此记录只申请收口已合入的任务工作区与任务卡,不扩大为模板发布、部署、迁移或 U1 全量验收。
11aa76a3bcGit 远端回读显示三个 merge commit 均以各自固定 base 和 PR head 为双亲,合入后 main 树与对应 head 完全一致。Dev main 的 modules/documents gitlink 为 6619835a65adb7c9864ea794f1bb465885fde7b8。Dev #518 窗口结果已登记并释放。owner 对阶段 8 整改后的阶段 7 确切审阅包答复“接受当前增量复核,继续合入核验”,决议已持久记录。
待清理现场
获批准后执行的限定步骤
当前边界与下一步
44 项目录仍 needs-review、0 published;14 份 DOC 的 Word 保真 NOT_PASSED,40 项还需逐包审阅。F01/F02 正式类型与存量升级、U2–U6 真实生成/采纳/审签/导出、部署和数据库迁移未由本轮合入完成。下一增量优先安排 U1 剩余 40 项包级语义/版式裁定,尤其 14 DOC 的 owner Word 对照;完成后再评估类型注册和 U2–U6 接线。该建议不是新任务启动授权。
owner 对阶段 10 确切收口包 SHA256 f6a7a7f72088e750658aa9e5c0cb78d961a2fdd6eaedbf49259c6c53d64423a0 答复:“确认写者已退出,批准安全收口”。本条于 2026-10-14T08:24:34Z 后登记;这是记录时刻,不代替 owner 的实际确认时刻。
授权范围限于 Dev、nested Documents、RDM 本次任务工作树与分支的安全回收、ignored 产物归档和两张任务卡的独立闭卡 PR。Dev 忙碌主检出及其他任务工作树保留;不授权模板发布、部署、迁移或 U1 全量收官。