Advance the RDM pin to the current mainline head #711

Merged
weichen merged 2 commits from fix/rdm-pin-advance-latest-2 into main 2026-10-23 01:11:25 +00:00
Owner

Why: the pinned RDM artifact is 73 commits behind the mainline, so the daily instance and everything built from the composed product are missing everything merged there since the last follow-up.

Evidence:

  • sha advances to the current RDM main head, whose own CI (runs 4946 and 4947, push) is green on both jobs — this is not an unvalidated commit.
  • Both selection constraints still hold, and they were checked before choosing the pair rather than discovered afterwards. The pins layout is unchanged at six, and there is zero schema or migration difference between the old pin and the new one. The second one matters because scripts/svc.sh refuses an incompatible switch before stopping the old service; the first is what the per-pin CI materialization requires.
  • The delivered lifecycle work is still present in the new pin: managementCeilingDenial and txProjectManaged both resolve in its tree.
  • The span is genuinely useful this time: prev_sha becomes the previously pinned commit, 73 commits back, so the round-trip identity test covers a real upgrade distance rather than two adjacent merges.
  • legacy_sha is untouched since it carries the no-identity semantics.
  • The pin comment states the new span and both constraints instead of the stale numbers it carried before.

Refs: Dev PR #690 (the previous pin follow-up).

Why: the pinned RDM artifact is 73 commits behind the mainline, so the daily instance and everything built from the composed product are missing everything merged there since the last follow-up. Evidence: - `sha` advances to the current RDM main head, whose own CI (runs 4946 and 4947, push) is green on both jobs — this is not an unvalidated commit. - Both selection constraints still hold, and they were checked before choosing the pair rather than discovered afterwards. The pins layout is unchanged at six, and there is **zero** schema or migration difference between the old pin and the new one. The second one matters because `scripts/svc.sh` refuses an incompatible switch before stopping the old service; the first is what the per-pin CI materialization requires. - The delivered lifecycle work is still present in the new pin: `managementCeilingDenial` and `txProjectManaged` both resolve in its tree. - The span is genuinely useful this time: `prev_sha` becomes the previously pinned commit, 73 commits back, so the round-trip identity test covers a real upgrade distance rather than two adjacent merges. - `legacy_sha` is untouched since it carries the no-identity semantics. - The pin comment states the new span and both constraints instead of the stale numbers it carried before. Refs: Dev PR #690 (the previous pin follow-up).
weichen added 2 commits 2026-10-23 00:58:06 +00:00
Why: establish the authorized task workspace and its initial baseline.

Evidence: preserved precheck receipt in .task/fix-rdm-pin-advance-latest-2.md; R0=6ced938a126981ee2a4fab671a2da94f49cb56c5.

Impact: task metadata only; the feature workspace starts at 6ced938a12.

Refs: .task/fix-rdm-pin-advance-latest-2.md
agent-exec transport fae3d09f32451db005c252425ef451ca/81a69440b07c
ci / svc-realcombo (pull_request) Successful in 2m48s
ci / test (pull_request) Successful in 9m21s
ci / test-pg (pull_request) Successful in 12m29s
e5c491a693
weichen merged commit c3fbf85732 into main 2026-10-23 01:11:25 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Dev#711