Why: The failed A01 needs a documented next design while the six PRs remain draft and unmerged. Evidence: Independent semantic FAIL and the committed r0.3 spec with resolved links and explicit no-paid/no-implementation boundary. Impact: Project entry and task card point to a pending design review; no new semantic behavior is enabled. Refs: U3 r0.2 A01 assessment, r0.3 design
ui
@ cbbef5075e