Why: The U1 controlled trial finished; its fixtures, validator, runner, per-run results, report, and renderer spike must be reviewable from the task branch, and the task card needs the final PASS/FAIL record. Evidence: results/summary.json + report.md (SELF, MiniMax official channel, CNY 3 of 200 cap); make evidence receipts for precheck, task-sync, and make test follow in this branch. Impact: Task-scoped experiment artifacts only (.task/genui-u1/); no production code changes. Refs: Documents PR #62 (proposal r2); task card feature/generative-ui-u1
2.6 KiB
2.6 KiB
Agent-System-Dev 项目事实
- 用途:开发集成父仓(gitlink 权威);非分发单元。
- 组合:modules/{core,backend,frontend,ui,documents} + deps/{development-guidelines,agent-native,agent-squad,agent-intent,agent-command,error-code-system,logging-system}。
- 部署:非容器;Releases 仓从本仓固定提交导出版本。
方向与规划入口
长期方向、目标及跨任务规划从过程仓的 项目方向与规划索引 查找主记录、里程碑和关联任务;原始正文沿用 方案与规划目录。 确立或调整具体方向时,在本入口维护其主记录链接;正文、确认依据和进展仍以该主记录为准。 目录中的既有文档不因被收录而自动成为已批准规划。记录、任务关联及收尾建议按 交付规范的长期方向与任务衔接 执行。
新增方向:Generative UI 调研与插件方案 r2。 2026-10-11 用户裁定首试点(对话内分析页)、可信编译插件交付与试验参数;U1 受控试验当日完成 (结构分化 6/6、生成走工具参数通道、首期自研 renderer,详见方案「U1 结果与 r2 修订」); U2 起实施与部署分别评审。
- 多人协作存储与分布式演进方案: 10–100 人、多项目、多会话并行;PostgreSQL 团队档、迁移恢复与多实例执行。方案 r1 已批准 (2026-10-11,用户指示「按方案开始改造」),实施自首选增量 U1+U2 启动。
验证
make test 先核对子模块工作树与固定指针,再运行治理脚本、公开边界、跨仓指针、库及各模块
测试。实际目标以根 Makefile 为准。make test-governance 可独立检查开发门禁,使用临时
真实仓库,不访问生产数据;操作与证据要求见 开发门禁。
make build 在 backend 模块内编译,replace 指向该模块自己的 deps/;
scripts/check-pins.sh 核对这些 gitlink 与 Dev 顶层指针,make test-worktree 另核对
真正被测的组件工作树。两者分别验证固定组合与实际检出,不能相互替代。
未加 go.work:工作区最小版本选择会抬高 backend 单独构建使用的部分 golang.org/x 版本。
发布消费方须从固定 Dev 提交递归物化后运行 make build,再核验制品与实际运行状态。