Why: The user approved the r0.5 written design for detailed planning; the resulting plan must be traceable from the Dev task and project entry. Evidence: Documents 25a561b passed link and diff checks; staged Dev make test completed exit 0 through make evidence in the task card. Impact: Pin plan and approval status only. Product code, new paid model calls, merge, and deployment remain not run. Refs: U3 r0.5 plan; Documents PR #95; Dev PR #512
ui
@ ac5b617e9e