Record option A acceptance and R1 execution in the UI proposal
Why: the user picked option A (task-centric) after reviewing the demos; the proposal status must reflect the decision and where R1 landed. Evidence: R1 delivered on feature/task-sidebar-r1 across core/backend/ frontend (contract flags, migration v8, task list APIs, TaskSidebar); headless walk and test suites green there. Impact: status line only; no design content change.
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
# 界面重构与多用户认证 —— 设计提案(2026-09-30)
|
||||
|
||||
状态:**proposed**(本文为方案对比稿,待用户裁定方向后另立实施提案);owner:weichen;主任务:Dev 仓 `feature/ui-redesign-proposals`。
|
||||
状态:**accepted(方向)**——2026-09-30 用户裁定采用**方案 A 任务中心**;认证阶段 2 范围在 R2 启动时再确认。R1(左栏重构)已实施:Dev 仓 `feature/task-sidebar-r1`(Core 契约 +pinned/archived、Backend 迁移 v8 与 `GET /api/conversations`+`/api/me`、Frontend TaskSidebar 重构;验证证据见该任务 PR)。owner:weichen。
|
||||
前置:[界面交互底座](2026-09-30-ui-inbox-command-workspace.md)(D25–D33)、[双档存储、多租户与规模化](2026-09-30-dual-tier-storage-and-multitenancy.md)(D17–D24)。
|
||||
配套 demo:`ui-redesign-demos/`(index.html 为入口,本地浏览器直接打开)。
|
||||
|
||||
|
||||
Reference in New Issue
Block a user