Plan IAM U4 acceptance and protected delivery
Why: The approved role and permission implementation needs a focused, reviewable path through browser acceptance, component delivery, and guarded closure. Evidence: Structural audit confirms DR1-DR21, U1-U9, and KTD1-KTD6; git diff --check passes; six-lens document review findings are incorporated. Impact: Adds the stage 7-10 plan, records the focused specification approval, and indexes the plan without authorizing production migration or deployment. Refs: feature/iam-u4-role-authority
This commit is contained in:
@@ -2,7 +2,8 @@
|
||||
title: 聚焦版角色与分层权限系统规格
|
||||
date: 2026-10-15
|
||||
type: feature
|
||||
status: review
|
||||
status: approved
|
||||
approved_at: 2026-10-15
|
||||
supersedes_scope: 2026-10-13-identity-role-permission-plan.md U4-U7 中超出本文的部分
|
||||
---
|
||||
|
||||
|
||||
@@ -0,0 +1,368 @@
|
||||
---
|
||||
title: IAM U4 Stage 7-10 Delivery - Plan
|
||||
type: feat
|
||||
date: 2026-10-15
|
||||
artifact_contract: ce-unified-plan/v1
|
||||
product_contract_source: specialized-project-spec
|
||||
execution: code
|
||||
origin: docs/proposals/2026-10-15-iam-focused-role-permission-spec.md
|
||||
---
|
||||
|
||||
# IAM U4 Stage 7-10 Delivery - Plan
|
||||
|
||||
## Goal Capsule
|
||||
|
||||
- **Objective:** The approved IAM U4 role and permission behavior is accepted in a real browser, merged through each protected repository at reviewed commits, and closed with traceable evidence and clean workspaces.
|
||||
- **Means:** Use the repository's existing Playwright stack against an isolated RDM product composition, then deliver Backend, Frontend, Documents, RDM, and Dev in dependency order with exact-head review and CI. (KTD1–KTD5)
|
||||
- **Authority:** The focused specification approved at Documents `e9ce9a5` owns behavior; this plan owns delivery mechanics; `Agent-System-Dev/policy/delivery.md` and `policy/merge-queue.md` own stage and merge gates; the task card owns current evidence.
|
||||
- **Execution profile:** The agent prepares and performs testing, review, PRs, conflict resolution, CI checks, merges, and cleanup. The user retains stage 7 and stage 10 decisions and personally publishes any trusted tag.
|
||||
- **Stop conditions:** Stop on a changed requirement, cross-project access success, stale or mismatched candidate SHA, unresolved browser or CI failure, a conflicting merge window, a mismatched existing tag, or any request to touch production data or deployment.
|
||||
|
||||
---
|
||||
|
||||
## Product Contract
|
||||
|
||||
### Summary
|
||||
|
||||
Stage 7 proves the implemented role model and permission boundaries through the real React interface and live Backend/RDM authorization path.
|
||||
Stages 8–10 then carry the same behavior through component PRs, a trusted Backend release tag, RDM pins, the Dev fixed combination, protected-branch CI, and safe task closure.
|
||||
|
||||
### Problem Frame
|
||||
|
||||
The implementation candidate has passed SQLite, isolated PostgreSQL, RDM overlay, Frontend/UI, and Dev combination checks, but those checks do not prove browser behavior or protected-repository delivery.
|
||||
The repositories also move independently: RDM consumes a published Backend extension contract, while Dev pins Backend, Frontend, UI, and Documents but does not pin RDM.
|
||||
Delivery must preserve those dependency and evidence boundaries without turning production migration or deployment into an implied part of acceptance.
|
||||
|
||||
### Requirements
|
||||
|
||||
**Candidate identity and formal acceptance**
|
||||
|
||||
- DR1. Stage 7 starts only after each task branch is synchronized with its current `origin/main` and the tested component commits are recorded together.
|
||||
- DR2. Formal browser acceptance runs on a fresh isolated data root and random loopback ports, never on a registered or production service.
|
||||
- DR3. Browser evidence uses the existing Frontend Playwright stack against the exact Backend, RDM, Frontend, and UI sources under review.
|
||||
- DR4. Every acceptance result records the command, component SHAs, environment shape, exit code, sanitized screenshots or traces where applicable, and evidence source. Browser credentials are synthetic; artifacts use owner-restricted external storage and expire after stage 10.
|
||||
- DR5. Stage 7 requires user review of the requirement-to-evidence map before any component merge begins.
|
||||
|
||||
**Role, user, and permission behavior**
|
||||
|
||||
- DR6. The browser creates and edits a role with a description while its stable `roleId` remains unchanged. Before disabling a role, the UI names it, shows the bound-user count and authorization impact, supports cancellation without a request, and sends one versioned request only after confirmation; success preserves a usable selection, while conflict or failure preserves context for retry.
|
||||
- DR7. Two users can share one role, one user can be moved to another role, and the system never exposes two active roles for one user.
|
||||
- DR8. Name, phone, email, staff number, department, and notes remain optional and searchable without becoming authorization identifiers.
|
||||
- DR9. Exact and fuzzy role search, status and action filters, pagination, single-role editing, matrix default/cap editing, visible-page batch changes, preview, and 409 rebasing work through the rendered UI. Drafts are keyed by `roleId`: permission grouping/paging, role filters, role paging, and single/matrix switching preserve them; switching roles never transfers a draft; leaving the administration area or refreshing requires an explicit save/discard decision; a 409 rebases only the same role's draft.
|
||||
- DR10. Delegated system actions expose only their permitted user, role, or permission controls; a manager without view authority cannot replace data with an empty set. Loading, stale, empty, partial-failure, retry, and success states are distinct; destructive controls remain unavailable without authoritative data. The core flow works by keyboard with named controls, announced status changes, stable focus after save/conflict/error, and a usable narrow viewport including matrix navigation.
|
||||
- DR11. `project.create` works only through an explicit system grant or an enabled role default within its cap.
|
||||
- DR12. Project A's creator can manage A's members, overrides, and document duties, but A's creator relation and an untrusted owner label never authorize project B. A separate valid B-side membership, current role grant, cap, and project override continue to authorize only the B actions they explicitly allow.
|
||||
- DR13. System administrator identity alone cannot read another user's project business content, private conversations, originals, drafts, controlled document bodies, business audit records, or exports, and cannot create a business-content export artifact.
|
||||
- DR14. Document author, reviewer, and approver assignments require current account and role eligibility, and approval remains separate from document publication.
|
||||
- DR15. Missing providers, incompatible schemas, stale authority epochs, disabled accounts, disabled roles, unknown actions, and out-of-cap overrides fail closed. Version-conflict, unknown-action, and out-of-cap batch updates perform zero partial writes, with the same resulting state and migration outcome on SQLite and PostgreSQL.
|
||||
|
||||
**Protected delivery**
|
||||
|
||||
- DR16. Component branches merge in dependency order; a downstream pin never points to an unmerged commit or unpublished required tag.
|
||||
- DR17. Backend's trusted tag is created only by the user after the reviewed Backend PR merge commit is verified on `origin/main`; an existing tag is never rewritten.
|
||||
- DR18. RDM updates its pins only after Backend and Frontend commits are merged, then builds the product from committed Git objects or a strictly clean tracked/untracked/ignored source tree, records digests of the copied content as well as Git SHAs, and replays affected acceptance. Dirty or untracked source must fail before packaging.
|
||||
- DR19. Dev enters the manual merge queue only after all component dependencies are merged and the final gitlinks point to their authoritative commits.
|
||||
- DR20. Dev merge requires exact-head `test`, `test-pg`, and `svc-realcombo` GATE success, current Review, no conflicting main advance, and an explicit queue claim.
|
||||
- DR21. Task closure records the actual merge commits and retains every failed, skipped, and not-run result at its real evidence level. Any source, base, pin, candidate manifest, or test-definition change after stage 7 updates the manifest, replays affected evidence, and requires a renewed stage 7 conclusion before the first component merge.
|
||||
|
||||
### Actors
|
||||
|
||||
- A1. **System administrator:** manages platform accounts, roles, explicit system grants, and platform permission ceilings.
|
||||
- A2. **Delegated manager:** holds a selected subset of system actions and sees only the matching administration controls.
|
||||
- A3. **Project creator:** manages only the project identified by immutable creation metadata.
|
||||
- A4. **Project member:** receives project behavior from the current professional role, project override, resource relation, lifecycle state, and document duty.
|
||||
- A5. **Delivery agent:** executes tests, review, PRs, CI checks, merges, and cleanup within the approved scope.
|
||||
- A6. **User reviewer:** approves stage 7 evidence, personally publishes a trusted tag, and approves stage 10 cleanup.
|
||||
|
||||
### Key Decisions
|
||||
|
||||
- **One effective role remains the product model.** The delivery does not introduce multi-role assignment. Governs DR7.
|
||||
- **System administration does not grant business-content access.** Project and resource authorization remain explicit. Governs DR12–DR15.
|
||||
- **Production migration and deployment remain outside this delivery.** The migration machinery is tested only on isolated databases. Governs DR2, DR21.
|
||||
|
||||
### Key Flows
|
||||
|
||||
- F1. **Formal acceptance**
|
||||
- **Trigger:** The synchronized component candidate is fixed.
|
||||
- **Actors:** A1–A5.
|
||||
- **Steps:** Build the isolated composition; seed accounts and projects; drive role, user, system grant, project, and document flows in Chromium; capture traces and API decisions; replay SQLite, PostgreSQL, and component suites.
|
||||
- **Outcome:** DR6–DR15 have exact-candidate evidence or stage 7 stops.
|
||||
- **Covers:** DR1–DR15.
|
||||
|
||||
- F2. **Serial protected delivery**
|
||||
- **Trigger:** The user approves stage 7.
|
||||
- **Actors:** A5, A6, Gitea.
|
||||
- **Steps:** Merge Backend; publish and verify its tag; merge Frontend and Documents; update and merge RDM pins; fix the Dev gitlinks; claim the Dev queue window; pass exact-head CI; merge and verify; finish registered worktrees; close the task card through its own reviewed PR.
|
||||
- **Outcome:** Every protected branch contains the reviewed behavior and the task record identifies the actual commits.
|
||||
- **Covers:** DR16–DR21.
|
||||
|
||||
### Acceptance Examples
|
||||
|
||||
- AE1. **Shared position:** Given two enabled users and one enabled software-engineer role, assigning both users succeeds; replacing one user's role leaves one active binding for each user and the original role still has one member. Covers DR7.
|
||||
- AE2. **Fine-grained manager:** Given `system.users.view` without role or permission view, the manager opens user details without a failing role request and cannot edit roles or grants. Covers DR10.
|
||||
- AE3. **Draft conflict:** Given a local matrix draft and a concurrent role update, saving returns 409, reloads the latest role version, replays the local draft against it, and never applies role A's draft to role B. Covers DR9.
|
||||
- AE4. **Creator isolation:** Given projects A and B with different creators, A's creator can change A's members, overrides, and author/reviewer/approver duties. With no valid B-side management grant, the same actor is denied for all three mutation families in B and B remains unchanged, even if the actor is a B member or carries an untrusted owner label. A separate fixture proves that a valid B-side grant authorizes only its declared B actions. Covers DR12, DR14.
|
||||
- AE5. **Administrator privacy:** Given an administrator with no project content grant, direct authenticated requests to B's private conversations, originals, drafts, controlled bodies, business-audit list/detail, and export create/status/download routes are denied with no payload or export artifact. A separately authorized project actor supplies positive controls for the same routes. Covers DR13.
|
||||
- AE6. **Fail-closed refresh:** Given an allowed cached role snapshot, tightening the role cap changes the authority epoch; the next project or knowledge read consumes the current Backend snapshot and denies the old permission. Covers DR15.
|
||||
- AE7. **Migration rehearsal:** Given a provenance-recorded frozen v35 fixture and oracle covering active and disabled roles, inactive bindings, revoked grants, explicit denies, owner mappings, and orphan/reference failures, a trusted non-production harness invokes the real Backend/RDM stores to freeze legacy writes, stage stable IDs and full owner-to-role mappings, compare source hashes and expected results, and activate by epoch. Compare mismatch or a concurrent legacy write blocks activation; a lost success response can be retried without duplicate bindings. SQLite and PostgreSQL produce the same final state. Covers DR2, DR15, DR21.
|
||||
|
||||
### Scope Boundaries
|
||||
|
||||
Included:
|
||||
|
||||
- Repeatable UI and live-composition browser acceptance for the approved U4 requirements.
|
||||
- Test-only adjustments needed to make that acceptance deterministic and reviewable.
|
||||
- Component sync, PRs, CI, Backend tag handoff, RDM pin updates, Dev queue delivery, and task cleanup.
|
||||
|
||||
Excluded:
|
||||
|
||||
- Production schema migration, legacy-role cutover, deployment, or 8788 service changes.
|
||||
- Account recovery, password flows beyond isolated fixture setup, multi-role support, Agent permissions, organization trees, SSO, and workflow redesign.
|
||||
- Branch-protection changes, tag rewriting, runner changes, or merge-queue automation.
|
||||
|
||||
---
|
||||
|
||||
## Planning Contract
|
||||
|
||||
### Key Technical Decisions
|
||||
|
||||
- KTD1. **Use repository-native Playwright as the formal browser gate.** `Agent-System-Frontend/playwright.config.ts` and the existing `e2e/` suite already define the project's real-browser contract. `agent-browser` may add an exploratory visible smoke when installed, but its absence does not replace or invalidate the repeatable Playwright run.
|
||||
- KTD2. **Run two browser layers.** Deterministic routed tests cover UI permission combinations, pagination, draft retention, and response ordering; a live isolated RDM product covers authentication, storage, Backend policy, RDM project boundaries, and embedded Frontend behavior.
|
||||
- KTD3. **Freeze evidence by component SHA and environment.** A branch sync, pin change, test-harness change, or target-main advance invalidates only the affected results; no receipt is copied to a different object.
|
||||
- KTD4. **Deliver dependencies serially.** Backend merges and receives a trusted tag before RDM updates its Backend pin. Frontend and Documents merge before RDM fixes its product pins. Dev pins only merged component commits and enters its final queue window last.
|
||||
- KTD5. **Keep high-consequence operations dual-keyed.** The agent prepares and verifies the proposed Backend tag command; the user executes tag publication. Production migration and deployment have no execution unit in this plan.
|
||||
- KTD6. **Treat missing component CI honestly.** Backend, RDM, and Dev consume their repository workflows. Frontend and Documents use their repository verification plus downstream Dev GATE when no repository-local workflow exists; they are not labeled GATE without a real platform run.
|
||||
|
||||
### High-Level Technical Design
|
||||
|
||||
The diagrams are delivery guidance rather than implementation specifications.
|
||||
|
||||
```mermaid
|
||||
flowchart TB
|
||||
BE[Backend reviewed commit] --> BET[User-published Backend tag]
|
||||
BET --> RP[RDM Backend pin]
|
||||
FE[Frontend reviewed commit] --> RP
|
||||
UI[UI commit already on main] --> RP
|
||||
DOC[Documents plan/spec commit] --> DEV[Dev final gitlinks]
|
||||
BE --> DEV
|
||||
FE --> DEV
|
||||
UI --> DEV
|
||||
RP --> RDM[RDM protected main]
|
||||
DEV --> DCI[Dev test + test-pg + svc-realcombo]
|
||||
DCI --> DM[Dev protected main]
|
||||
```
|
||||
|
||||
```mermaid
|
||||
sequenceDiagram
|
||||
participant Agent as Delivery agent
|
||||
participant Browser as Playwright Chromium
|
||||
participant Product as Isolated RDM product
|
||||
participant User as User reviewer
|
||||
participant Gitea as Protected repositories
|
||||
Agent->>Product: Build exact component composition
|
||||
Agent->>Browser: Run deterministic and live U4 scenarios
|
||||
Browser->>Product: Role, user, grant, project, and duty requests
|
||||
Product-->>Browser: Current policy decisions and rendered results
|
||||
Agent->>User: Stage 7 requirement-to-evidence map
|
||||
User-->>Agent: Stage 7 conclusion
|
||||
Agent->>Gitea: Review, CI, and serial component PR merges
|
||||
Agent->>User: Exact Backend merge commit and tag command
|
||||
User-->>Gitea: Publish trusted tag
|
||||
Agent->>Gitea: RDM pins, Dev queue CI, merge, and verification
|
||||
```
|
||||
|
||||
### Sequencing
|
||||
|
||||
1. Fix and accept the synchronized stage 7 candidate.
|
||||
2. Complete stage 7 browser and database evidence and obtain the user's conclusion.
|
||||
3. Re-review any files changed by acceptance work.
|
||||
4. Merge Backend, then complete the user-owned tag gate.
|
||||
5. Merge Frontend and Documents.
|
||||
6. Sync RDM, update pins, replay the product and browser gates, then merge RDM.
|
||||
7. Fix Dev gitlinks, claim the manual queue window, run exact-head CI, and merge Dev.
|
||||
8. Verify merged content, preserve receipts, clean registered worktrees, and then close the task card through its own reviewed PR after stage 10 approval.
|
||||
|
||||
### Risks and Dependencies
|
||||
|
||||
- Backend, RDM, Documents, and Dev main may advance before their windows. Each affected branch must sync once at its delivery boundary and rerun affected evidence.
|
||||
- RDM currently trails its authoritative main substantially. Conflict resolution must preserve upstream behavior and may invalidate the pre-sync RDM review.
|
||||
- Browser execution requires the repository Playwright runtime and Chromium. If the runtime cannot launch, stage 7 stops with the launch error; another browser stack is not substituted.
|
||||
- The recommended Backend version is `v0.6.0` because U4 adds public surface 2.15 and schema v36. If that remote tag exists or the release convention has changed, stop for a new user-selected version and never rewrite the ref.
|
||||
- Gitea API or Actions may fail transiently. A retry is allowed only after reading the actual PR/run state; unknown results are reconciled before resubmission.
|
||||
- The current Dev merge queue has no active window after the recorded release of the workbench visual task. This fact must be re-read immediately before U8 claims a new window.
|
||||
|
||||
---
|
||||
|
||||
## Implementation Units
|
||||
|
||||
### U1. Record approval and fix the stage 7 candidate
|
||||
|
||||
- **Goal:** Record the user's stage 6 approval and produce one synchronized candidate manifest for formal acceptance.
|
||||
- **Requirements:** DR1, DR4, DR5.
|
||||
- **Files:** `Agent-System-Dev/.task/feature-iam-u4-role-authority.md`, `Agent-System-Documents/docs/proposals/2026-10-15-iam-u4-stage7-10-delivery-plan.md`, `Agent-System-Documents/docs/proposals/INDEX.md`.
|
||||
- **Approach:** Update the stage table with the approved component versions and date. Run the required task sync in each branch before its evidence is treated as current. Record base, head, component commits, test definitions, and browser-harness commit in one candidate manifest.
|
||||
- **Test scenarios:** A clean same-base sync leaves the candidate unchanged; a moving target updates the manifest and invalidates affected evidence; a dirty or drifting component stops the unit.
|
||||
- **Verification:** Dev precheck/task-resume receipt, `make task-sync` evidence, recursive worktree verification, and Documents `git diff --check`.
|
||||
- **Dependencies:** None.
|
||||
|
||||
### U2. Add the repeatable IAM browser acceptance slice
|
||||
|
||||
- **Goal:** Make DR6–DR15 reproducible in the existing browser-test stack without production services.
|
||||
- **Requirements:** DR2–DR4, DR6–DR15.
|
||||
- **Files:** `Agent-System-Frontend/e2e/iam-role-authority.playwright.ts`, `Agent-System-RDM/scripts/iam-u4-role-acceptance.sh`, and only the smallest supporting test fixtures required by those files.
|
||||
- **Approach:** Add deterministic route-driven cases for fine-grained navigation, filters, matrix edits, role-scoped draft lifetime, 409 rebasing, pagination, late-response rejection, role-disable impact confirmation, and independently loading role/permission data. Cover keyboard operation, focus, accessible names and announcements, and a narrow viewport with horizontal matrix navigation. Add a live harness that materializes exact committed candidate sources into a temporary build root, builds the embedded RDM product, initializes a fresh SQLite database, starts on loopback random ports, and runs the same Playwright file in live mode. Synthetic credentials and activation material remain in the temporary root and are deleted on exit; traces and screenshots are sanitized before owner-restricted retention.
|
||||
- **Execution note:** Add failure-first cases for the previously reviewed permission combinations and race paths before changing the harness or UI assertions.
|
||||
- **Test scenarios:** Roles-only viewer; users-only viewer; permissions viewer without manager; permissions manager without view; shared-role assignment and reassignment; exact/fuzzy/action/status filters; multi-page role selection; matrix default/cap and visible-page batch edits; draft-preserving and explicit-discard transitions; concurrent 409 rebase; stale response after role switch; role-disable cancel/success/conflict/failure; initial loading; filtered and catalog-empty states; independent role-list and permission-catalog failure; failed create/save retry; keyboard-only core flow; narrow viewport; current epoch denial; isolated service startup failure and cleanup.
|
||||
- **Verification:** Focused Playwright run with trace retention, Frontend unit tests/build/design guard, harness shell check, and a clean-process check after success and failure.
|
||||
- **Dependencies:** U1.
|
||||
|
||||
### U3. Execute stage 7 formal acceptance
|
||||
|
||||
- **Goal:** Produce the requirement-to-evidence map the user can approve without reading implementation details.
|
||||
- **Requirements:** DR2–DR15.
|
||||
- **Files:** `Agent-System-Dev/.task/feature-iam-u4-role-authority.md`; screenshots, traces, and receipts remain outside source and are linked by digest or durable run URL.
|
||||
- **Approach:** Run deterministic Playwright and the live isolated product. Replay Backend SQLite and isolated PostgreSQL role-policy tests, RDM full tests against the fixed Backend, Frontend/UI suites, and Dev combination tests. Exercise migration through an isolated cross-component harness that calls the real trusted Backend/RDM store path for freeze, stage, compare, activate, failure, and retry against the frozen v35 fixture and oracle. Record each DR-ID as PASS, FAIL, SKIP, or NOT_RUN against the exact candidate.
|
||||
- **Test scenarios:** AE1–AE7 plus missing provider, incompatible schema, disabled account/role, final permission-manager protection, project-override cap, document-duty cap, administrator audit/export denial, dirty product-source rejection, and SQLite/PostgreSQL batch failures for version conflict, unknown action, and out-of-cap change with zero partial writes.
|
||||
- **Verification:** Evidence receipts and browser artifacts match the candidate manifest; an independent replay covers the minimum critical set; the user records the stage 7 conclusion in the task card.
|
||||
- **Dependencies:** U2.
|
||||
|
||||
### U4. Re-review and prepare component PRs
|
||||
|
||||
- **Goal:** Turn the stage 7 candidate into current, reviewable component branches without changing accepted behavior.
|
||||
- **Requirements:** DR4, DR16, DR21.
|
||||
- **Files:** Component diffs and task records in Backend, Frontend, Documents, and RDM.
|
||||
- **Approach:** Sync each component with its current main at its own delivery boundary. Resolve conflicts without weakening authorization. If source, base, dependency pin, candidate manifest, or test definition changes, update the manifest, rerun the affected U2/U3 evidence, and obtain a renewed stage 7 conclusion before any component merge. Then simplify only changed code, conduct independent code review, push the branch, and create a draft PR with the final behavior and evidence.
|
||||
- **Test scenarios:** Clean sync; source conflict; changed public surface; changed Frontend API type; changed RDM provider contract; target advance after review.
|
||||
- **Verification:** Each PR identifies base/head, component dependencies, review findings and closure, and current applicable CI or explicit absence of repository-local CI.
|
||||
- **Dependencies:** U3 and stage 7 user approval.
|
||||
|
||||
### U5. Merge Backend and publish its trusted tag
|
||||
|
||||
- **Goal:** Establish the authoritative public role-policy contract RDM can consume.
|
||||
- **Requirements:** DR16, DR17.
|
||||
- **Files:** Backend PR and release tag; no production service files.
|
||||
- **Approach:** Confirm Backend PR HEAD contains current main, public surface 2.15, schema v36, staged migration, and the reviewed tests. Require the `vet-and-test` GATE on that exact HEAD, complete agent Review, merge without force, and verify the merge commit on `origin/main`. Prepare an annotated `v0.6.0` command bound to that merge commit; the user executes it. Read the remote peeled tag before proceeding.
|
||||
- **Test scenarios:** CI failure; main advance; merge conflict; tag absent; tag already exists at the same commit; tag exists at another commit; push result unknown.
|
||||
- **Verification:** PR merge URL, exact merge SHA, successful exact-head CI, remote annotated tag and peeled commit equality.
|
||||
- **Dependencies:** U4. The user-owned tag action is an internal completion gate after the Backend merge.
|
||||
|
||||
### U6. Merge Frontend and Documents
|
||||
|
||||
- **Goal:** Land the accepted administration UI and its authoritative records before RDM fixes product pins.
|
||||
- **Requirements:** DR3, DR6–DR10, DR16, DR21.
|
||||
- **Files:** Frontend PR, Documents PR, `Agent-System-Documents/docs/proposals/INDEX.md`.
|
||||
- **Approach:** Sync and revalidate Frontend, including the IAM Playwright slice, then merge the reviewed PR. Sync Documents, verify links and claims, and merge its PR. UI requires no U4 PR when `e295cae` remains on authoritative main.
|
||||
- **Test scenarios:** Frontend main changes affecting AdminZone, styles, API types, or test harness; Documents link drift; UI main no longer contains the expected token commit.
|
||||
- **Verification:** Frontend tests/build/Playwright and platform status, Documents `git diff --check`, merged commits on each main, and UI ancestry check.
|
||||
- **Dependencies:** U4; Backend may merge before or during this unit, but RDM pinning waits for both U5 and U6.
|
||||
|
||||
### U7. Update and merge the RDM composition
|
||||
|
||||
- **Goal:** Replace the development overlay with authoritative merged pins and prove the real product composition.
|
||||
- **Requirements:** DR12–DR18, DR21.
|
||||
- **Files:** `Agent-System-RDM/pins/agent-system-backend`, `pins/agent-system-frontend`, `pins/agent-system-ui`, public-contract references, product manifest, and RDM task evidence.
|
||||
- **Approach:** Sync the RDM branch with current main and resolve its known divergence. Pin Backend to the verified tagged merge commit, Frontend to its merged commit, and UI to current authoritative main. Remove reliance on the temporary `go.work` overlay. Harden product assembly so it materializes committed Git objects, or rejects any tracked, untracked, or relevant ignored drift before copying, and records copied-content digests in addition to Git SHAs. Run the full RDM suite, product build, product smoke, migration rehearsal, and live IAM Playwright acceptance; review the resulting pin diff and merge the RDM PR after `build-and-test` succeeds.
|
||||
- **Test scenarios:** Pin mismatch; tag/commit mismatch; tracked, untracked, or ignored source drift; copied-content digest mismatch; missing embedded assets; migration staging failure; source-hash mismatch; provider schema mismatch; browser regression after real pins.
|
||||
- **Verification:** `PRODUCT_MANIFEST.json` matches the three gitlinks, RDM HEAD, and actual copied-content digests; a dirty-source negative test fails before packaging; full local receipts and exact-head RDM CI pass; merged RDM main contains the reviewed pins.
|
||||
- **Dependencies:** U5, U6.
|
||||
|
||||
### U8. Deliver the final Dev combination through the manual queue
|
||||
|
||||
- **Goal:** Merge one Dev candidate that pins only authoritative component commits and carries current evidence.
|
||||
- **Requirements:** DR16, DR19, DR20, DR21.
|
||||
- **Files:** `Agent-System-Dev/modules/backend`, `modules/frontend`, `modules/ui`, `modules/documents`, task card, PR, and merge-queue issue #518.
|
||||
- **Approach:** Re-read #518 and claim the only Dev main window. Run `make task-sync`, update gitlinks to merged component commits, fix the candidate, and store final receipts outside source. Run local `make test` and `make build`, complete final independent Review, push the Dev branch, and require `test`, `test-pg`, and `svc-realcombo` on the exact PR HEAD. Recheck main/head immediately before a non-force PR merge, then read back main and the component tree.
|
||||
- **Test scenarios:** Active competing window; main advance after CI; component SHA drift; CI transient failure within retry budget; repeated failure; unknown merge response; merged main content mismatch.
|
||||
- **Verification:** Queue claim/release entries, current base/head, three successful GATE jobs, review receipt, PR merge URL, final main SHA, and exact `git ls-tree` component values.
|
||||
- **Dependencies:** U7 and merged component records from U5–U6.
|
||||
|
||||
### U9. Verify, close, and clean the task
|
||||
|
||||
- **Goal:** Leave authoritative records and no abandoned IAM workspaces or branches.
|
||||
- **Requirements:** DR21.
|
||||
- **Files:** Dev task card and archive entry; component task records where applicable.
|
||||
- **Approach:** Verify actual merged contents and component ancestry. Record browser, SQLite, PostgreSQL, component CI, Dev CI, tag, PR, and merge evidence with their real source levels, then request stage 10 approval. Preserve cleanup receipts outside the worktree; after all writers have exited, run `TASK_WRITERS_STOPPED=1 make task-finish` from the registered task worktree. Then run `make task-close` from clean main and deliver its card-close PR through the applicable queue, Review, CI, merge, and readback path. Never force-delete a refused cleanup.
|
||||
- **Test scenarios:** Uncommitted or untracked file; live writer; unmerged local or remote commit; missing task-card PR link; cleanup refusal; post-merge content mismatch.
|
||||
- **Verification:** Stage 10 conclusion, archived task card on main, clean recursive state, merged ancestry, removed task worktrees, and preserved external receipts.
|
||||
- **Dependencies:** U8. Stage 10 approval is an internal gate before cleanup.
|
||||
|
||||
---
|
||||
|
||||
## Verification Contract
|
||||
|
||||
| Gate | Command or platform check | Applies to | Done signal |
|
||||
|---|---|---|---|
|
||||
| Backend SQLite | `GOWORK=off go test ./... -count=1` | U3, U5 | All packages pass at the recorded Backend HEAD |
|
||||
| Backend PostgreSQL | Isolated PostgreSQL 16 with `AGENT_PG_TEST_DSN`, then role, migration, delegation, and lock-order store tests | U3, U5 | No skips in the selected PG set; container removed |
|
||||
| Cross-database atomicity | Force version-conflict, unknown-action, and out-of-cap batch failures against SQLite and isolated PostgreSQL | U3 | Both stores retain identical pre-request state with zero partial writes |
|
||||
| Migration oracle | Trusted isolated Backend/RDM store harness against the frozen v35 fixture and expected oracle | U3, U7 | Freeze/stage/compare/activate/failure/retry results match on SQLite and PostgreSQL; mismatches block activation |
|
||||
| Frontend unit/build | `npm test && npm run build && node scripts/check-knip.mjs` | U2, U3, U6 | Tests pass, build succeeds, knip stays within baseline |
|
||||
| UI | `npm test` plus the design guard through the Frontend/Dev suite | U3, U6 | UI tests and design guard pass at the fixed UI commit |
|
||||
| Browser deterministic | `npm run e2e -- e2e/iam-role-authority.playwright.ts` with isolated preview | U2, U3, U6 | Required scenarios pass; failure traces retained |
|
||||
| Browser live product | `scripts/iam-u4-role-acceptance.sh` with exact source SHAs | U3, U7 | Embedded product scenarios pass on a fresh data root; screenshot and manifest digests recorded |
|
||||
| RDM overlay | `GOWORK=<fixed overlay> go test ./... -count=1` | U3 | Development contract passes before authoritative pins exist |
|
||||
| RDM pinned product | Dirty-source negative test, then `make test`, `make product`, and `make product-smoke` from committed sources | U7 | Drift is rejected; full suite, embedded product, copied-content digests, and manifest smoke pass without overlay |
|
||||
| Documents | `git diff --check` plus link and version review | U1, U6 | No malformed diff or stale reference |
|
||||
| Dev local combination | `make test && make build` after `make task-sync` | U3, U8 | Exact fixed combination passes and builds |
|
||||
| Component CI | Backend `vet-and-test`; RDM `build-and-test`; current platform-required Frontend/Documents checks when present | U5–U7 | Each available GATE is successful on the merged candidate HEAD |
|
||||
| Dev CI | Gitea `test`, `test-pg`, `svc-realcombo` | U8 | All three jobs succeed on the same final PR HEAD |
|
||||
| Merge integrity | PR head/base readback, non-force merge, `origin/main` and component tree readback | U5–U8 | Actual protected main matches the reviewed candidate |
|
||||
| Cleanup | External receipt preservation; guarded `task-finish`; then `task-close` PR Review/CI/merge/readback | U9 | No writer, unique file, unmerged commit, active lock, or cleanup result is lost |
|
||||
|
||||
Evidence rules:
|
||||
|
||||
- Local commands remain `SELF` unless an independent reviewer replays them.
|
||||
- Gitea Actions counts as `GATE` only when the run identity, job, exact SHA, and result are recorded.
|
||||
- A Playwright screenshot or trace proves only the scenario and build identified by its receipt.
|
||||
- `SKIP` and `NOT_RUN` remain visible; they are never converted to PASS by another layer's test.
|
||||
- Any source, base, pin, manifest, or test-definition change updates the named candidate and reruns the gates it affects. A post-stage-7 change also requires a renewed stage 7 conclusion before component merge; a final Dev HEAD change invalidates its three required CI jobs.
|
||||
|
||||
---
|
||||
|
||||
## Definition of Done
|
||||
|
||||
Global completion requires all of the following:
|
||||
|
||||
- DR1–DR21 all have PASS evidence. These delivery requirements are mandatory; SKIP, NOT_RUN, and exclusions block completion.
|
||||
- The user has approved stage 7 and stage 10 on named candidate versions.
|
||||
- Independent final Review has no unresolved Critical or Important finding.
|
||||
- Backend, Frontend, Documents, RDM, and Dev PRs are merged in dependency order at the recorded commits.
|
||||
- The trusted Backend tag exists remotely and peels to the reviewed Backend merge commit.
|
||||
- RDM's product manifest uses authoritative merged pins and no development overlay.
|
||||
- Dev's final PR HEAD has successful `test`, `test-pg`, and `svc-realcombo` jobs.
|
||||
- Actual protected main branches and Dev gitlinks match the reviewed candidates.
|
||||
- Production migration and deployment remain NOT_RUN unless separately authorized.
|
||||
- Failed experiments, temporary build roots, credentials, processes, branches, and worktrees are removed or retained with an explicit reason; no abandoned attempt code remains in the diffs.
|
||||
- Task cards are archived through the guarded workflow and external receipts remain available.
|
||||
|
||||
Per-unit completion:
|
||||
|
||||
| Unit | Completion signal |
|
||||
|---|---|
|
||||
| U1 | Stage 6 approval and synchronized candidate manifest are recorded |
|
||||
| U2 | Repeatable deterministic and live IAM browser slices exist and pass locally |
|
||||
| U3 | User approves the exact stage 7 requirement-to-evidence map |
|
||||
| U4 | Current component PR candidates have valid review and applicable checks |
|
||||
| U5 | Backend is merged and the user-published tag is verified |
|
||||
| U6 | Frontend and Documents are merged; UI ancestry remains valid |
|
||||
| U7 | RDM is merged with authoritative pins and a matching product manifest |
|
||||
| U8 | Dev is merged through an exclusive queue window with three exact-head GATE jobs |
|
||||
| U9 | Stage 10 is approved, records are archived, and guarded cleanup succeeds |
|
||||
|
||||
---
|
||||
|
||||
## Appendix
|
||||
|
||||
### Sources
|
||||
|
||||
- `docs/proposals/2026-10-15-iam-focused-role-permission-spec.md`
|
||||
- `docs/proposals/2026-10-15-iam-focused-role-permission-implementation-plan.md`
|
||||
- `Agent-System-Dev/.task/feature-iam-u4-role-authority.md`
|
||||
- `Agent-System-Dev/policy/delivery.md`
|
||||
- `Agent-System-Dev/policy/merge-queue.md`
|
||||
- `Agent-System-Dev/.gitea/workflows/ci.yaml`
|
||||
- `Agent-System-Backend/.gitea/workflows/ci.yml`
|
||||
- `Agent-System-RDM/.gitea/workflows/ci.yml`
|
||||
- `Agent-System-RDM/scripts/build-product.sh`
|
||||
- `Agent-System-Frontend/playwright.config.ts`
|
||||
- `Agent-System-Frontend/e2e/rdm-duties.playwright.ts`
|
||||
@@ -6,6 +6,10 @@
|
||||
|
||||
## 先看哪一份
|
||||
|
||||
- [IAM U4 阶段 7–10 验收与交付计划](2026-10-15-iam-u4-stage7-10-delivery-plan.md):
|
||||
基于已批准的聚焦角色权限实现,安排真实浏览器验收、跨仓 Review/PR/CI、Backend 受信 tag、RDM 权威 pin、Dev 手工合入窗口及安全收口。
|
||||
生产迁移、部署、多角色、账号恢复、Agent 权限和工作流改造不在本计划内。
|
||||
|
||||
- [IAM I1 权限边界与公开扩展合同 r1](2026-10-13-iam-i1-permission-contract.md):
|
||||
依据已批准的[用户、职位角色与分层权限统一方案 r1](2026-10-13-identity-role-permission-plan.md)
|
||||
(Documents `a088809`)冻结系统/项目/资源边界、管理员无业务 bypass、创建者 cap、独立 `audit.read` 与公开扩展四要素。
|
||||
|
||||