Commit Graph
170 Commits
Author SHA1 Message Date
weichen ebf655c4d7 Merge Documents main into fast-slow display design branch
Why: Dev #451 cannot pin modules/documents while feature tip and main diverge.
Evidence: merge-tree reports submodule conflict 1048e7c vs 9e4ee27.
Impact: Documents #84 tip includes main@1048e7c plus r1.1/U1 plan.
Refs: Dev PR #451; Documents PR #84
2026-10-12 12:07:02 +00:00
weichen fe8d08be21 Record the final baseline and isolated candidate data
Why: distinguish timed observations from current service ownership.

Evidence: SELF task-sync and read-only observations at 18:14 Beijing time.

Impact: planning metadata only; runtime and component deployment unchanged by this task.

Refs: account r2; recovery r3
2026-10-12 10:16:32 +00:00
weichen dca4265e37 Plan stable accounts and durable service recovery
Why: account help, dev credential writes and crash recovery need a current, reviewable contract.

Evidence: SELF source and sanitized runtime observations; seven document review lenses; business and fault validation NOT_RUN.

Impact: revise two planning documents only; preserve prior approvals and mark additions pending review.

Refs: Dev feature/svc-account-durability-plan; account r2; recovery r3
2026-10-12 10:09:49 +00:00
weichen a183e663de Propose RDM function implementation plan r1
Why: 2026-10-12 全系统核对产出的功能/实现矩阵与 U1-U9 整改方案需入仓评审;独立文件已过期于共享门禁解除。
Evidence: 报告含冻结源码/运行时快照与逐条需求索引;发布补记记录冻结后部署时序与 U2 已合入切片(RDM PR #251/#254/#256/#258)。
Impact: 仅新增 docs/proposals 一份方案与 README 入口;不改代码与既有文档。
Refs: RDM docs/requirements V2.2、Documents 2026-10-11-rdm-final-target-completion.md
2026-10-12 09:28:44 +00:00
weichen 9e4ee27c7e Mark fast-slow U1 plan approved for implementation
Why: User authorized stage-5 start; record plan status for executors.
Evidence: Chat authorization "开始"; no runtime tests.
Impact: Documents proposal status only.
Refs: 2026-10-12-fast-slow-channel-display-u1-plan.md
2026-10-12 07:39:03 +00:00
weichen 5b71525818 Merge Documents main into fast-slow display design branch 2026-10-12 07:33:22 +00:00
weichenandCursor f9d96dfc59 Add fast-slow display design r1.1 and U1 plan
Why: Record approved stage-4 design with R03 splits and U1 exit
whitelist, plus stage-5 U1 implementation plan for review.
Evidence: Document edits only; no runtime verification.
Impact: Documents proposals INDEX; no business code.
Refs: feature/fast-slow-display-design

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 07:31:46 +00:00
weichenandCursor 2cec59016a Update collab storage plan progress to r2 after U1-U7
Why: Delivery requires writing planning progress back after U7
landed; the proposal still claimed U1+U2 start / NOT_RUN.
Evidence: SELF doc edit against archived U7 cards and release
checklist A1-A7/B1 facts.
Impact: Readers see code-done vs capacity-window-pending; adds
HTTP multi-instance vs Manager-test lesson.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 06:39:26 +00:00
weichen 9d9b1523c8 Merge Documents main into svc unified-deploy proposal branch
Why: Dev #422 conflicted on modules/documents gitlink after main advanced past the proposal pin.
2026-10-12 05:26:12 +00:00
weichen e39d327850 Record GenUI prod-acceptance action fixes on the usage guide
Why: Capture nil-card panic and intent data-flatten field fixes found
during local prod acceptance without revising the final closure verdict.
Evidence: Backend#173 #174; prod action checklist
Impact: Field-fix log lists the two hotfixes and their PRs.
Refs: GenUI prod deploy; fix track
2026-10-12 04:17:07 +00:00
weichen 66ddd37870 Note Generative UI prod instance acceptance on the usage guide
Why: Record that the known-boundary production deploy/acceptance ran
on the local prod svc instance with auth and PG.
Evidence: scripts/svc.sh prod list; acceptance API checklist
Impact: Usage guide boundary list no longer says deploy is pending.
Refs: GenUI prod deploy task
2026-10-12 04:08:58 +00:00
weichenandCursor 16cafca00c Approve Generative UI auto-trigger opt-in design
Why: Capture the fixed opt-in/budget/anti-self-trigger decisions and
update the usage guide boundary list.
Evidence: proposal r1 status approved
Impact: Authority for backend auto-present implementation.
Refs: plan GenUI boundaries T2/T3

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:46:26 +00:00
weichenandCursor 7df7d786d0 Record r1 approval for svc unified deploy proposal
Why: user approved the proposal and U1/U4 specs and authorized push/PRs
plus U1/U4 implementation start.
Evidence: SELF conversation approval 2026-10-12; implementation still NOT_RUN.
Impact: planning status only.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:32:55 +00:00
weichenandCursor 923537e9a1 Add svc unified deploy and one-time login key proposal r1
Why: capture the reviewed design for binary/source install, env prep,
and passwordless activation via one-time restricted sessions.
Evidence: SELF source review against Dev af9c2de; implementation NOT_RUN.
Impact: Documents planning index only; no runtime change.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:28:37 +00:00
weichen 0b314e2029 Record the admin-zone partition delivery in the two-trees plan progress
Why: policy requires updating applicable plan progress on task
completion; WP3-I3 landed the admin-zone entrance via the generic
declaration mechanism.
Evidence: Dev PR #414 and live verification comment (R5, SELF).
Impact: progress line of 2026-10-11-rdm-two-trees-trace-audit-integration.md only.
Refs: WP3-I3/KTD4.
2026-10-12 03:24:50 +00:00
weichenandCursor 7fbfad1851 Approve B-class allowlist for help and intent actions
Why: Record the independent U5-style review for the first two B-class
surface actions and update the usage guide allowlist note.
Evidence: proposal r1 status approved; usage doc API table updated.
Impact: Documents authority for backend whitelist implementation.
Refs: U5 action-scope r2; plan GenUI boundaries 2026-10-12

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:19:03 +00:00
weichen 877d0683cd Add the Generative UI usage guide and U1-U6 evaluation record (final)
Why: The direction closes at U7 - the master record needs its
companion usage guide (enable/generate/revise/act/disable for owners)
and the combined evaluation record covering every landed increment
with its evidence chain and known boundaries.

Evidence: Live E2E on dev@b634a27 (real MiniMax-M3): progress page
presented autonomously, conversation surfaces=2, project aggregation
returns cross-conversation pages under the owner scope; receipts in
Dev task feature/generative-ui-u7-acceptance.

Impact: Documents-only (new guide + index closeout).

Refs: r2 master record; U5 scope r2; Dev task
feature/generative-ui-u7-acceptance
2026-10-12 02:47:27 +00:00
weichen da59ccff04 Track the merged svc-autorecover outcome in the review record and index
Why: between the review round and the approval decision another session completed and merged svc-autorecover (PR #396/#400/#401/#402), so the (a)-decision tracking must reflect the landed slice and the remaining U2 delta.

Evidence: SELF - merged main history c622372 and archived card .task/archive/feature-svc-autorecover.md (10/10 tests, 146/146 governance, CI green on e0b49d1).

Impact: review record, INDEX; proposal r2 body unchanged.

Refs: PR #396 #401
2026-10-12 01:29:31 +00:00
weichen 5a807933c2 Record the r2 approval and the svc-autorecover vehicle decision
Why: the human gate resolved on 2026-10-12 - r2 approved (five stages at once) and option (a) adopted; the review record, proposal index and status navigation must reflect it.

Evidence: SELF - user decision relayed in conversation; stage-review details in the Dev task card; proposal r2 body unchanged (SHA256 9cfda252...).

Impact: review record, INDEX entry; no plan content change.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-12 01:26:50 +00:00
weichen 71cd9d1db2 Record the post-sync drift check and svc-autorecover in-flight findings in the review record
Why: the reviewer record must reflect that all r2 gap claims hold at the post-sync backend pin 25fbea85, and that the svc-autorecover ownership decision now has 373 lines of unregistered, partially failing in-flight work to weigh.

Evidence: SELF - drift-check receipt in the Dev task card (exit 0, all cited gaps hold); svc-autorecover suite observed 5 of 10 tests failing on 2026-10-11.

Impact: review record addendum only; proposal r2 (SHA256 9cfda252...) unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:51:54 +00:00
weichen cbc64eb8ab Revise the recovery proposal to r2 with external review findings
Why: absorb the external source-review round - pin the shutdown budget change, close the U1 acceptance gap for program/cwd changes, gate U4 public states on a mapping table, and make the svc-autorecover coordination an explicit human decision.

Evidence: SELF - external review round 2 in the review record; r2 SHA256 9cfda2520b913e6966c68fb3f66fb7bc8382a8f7a2b69cb364122216dcdb72cd; all reviewed claims re-verified against the pinned baselines.

Impact: documents only; four targeted amendments (U1/U3/U4/section 9) plus version bump and INDEX update; requirements and metrics unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:45:09 +00:00
weichen 54fc24e4d5 Add the service restart and recovery proposal r1 with review record
Why: pin the reviewed candidate as a fixed git object before human review (external review P1.1); untracked drafts made check-evidence report unverified.

Evidence: SELF - proposal SHA256 cfc9b768a4596a268810e20101cddc2a6040e24a640e6e34dbda17b838cd45ed matches the review record; source baseline Dev 5e57029b, Backend eb12f102, Core 89f3906c, Frontend aaced879, Documents 23e2276.

Impact: documents repo only; adds proposal r1, six-lens review record and INDEX entry; no implementation, NOT_RUN statuses preserved.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:42:23 +00:00
weichen 2085447701 Record U5 progress and mark U1-U5 implementation complete in the master plan
Why: U5 landed via RDM PR #213 (merge 1dce69d); all five implementation units now complete.

Evidence: RDM PR #213 merged=True.

Impact: plan status + U5 progress + INDEX.

Refs: RDM PR #213
2026-10-11 15:57:13 +00:00
weichen 895a7204b9 Record U4 progress in the two-trees master plan and index
Why: U4 landed via Dev PR #368 (merge 7aa8fd9).

Evidence: Dev PR #368 merged; CI green.

Impact: status line + U4 progress + INDEX only.

Refs: Dev PR #368
2026-10-11 15:07:53 +00:00
weichen b6b6059222 Record the user ruling to gate U6 on owner experience
Why: The U6 precondition (benefit evidence from U4/U5) resolves to the
owner actually using the landed U1-U5 capability - the human usability
comparison marked NOT_RUN since U1 finds its execution path here; the
user ruled 2026-10-11 to evaluate first and decide U6 after.

Evidence: Ruling collected via the session question panel on
2026-10-11; U1-U5 all merged (Dev #329/#336/#345/#351/#367).

Impact: Documents-only (master record U6 gate note + index status).

Refs: r2 U6 clause; Dev task feature/generative-ui-u6-gate-record
EOF
)
2026-10-11 15:01:08 +00:00
weichen aba1d6a3d6 Record the user approval of the U5 action scope
Why: The user ruled on the three questions (categories and ranges
approved as proposed; C-class limited to plugin KV plus task ledger;
confirm UX reuses the inline card); the proposal becomes the approved
scope and unblocks the U5 implementation task.

Evidence: Ruling collected via the session question panel on
2026-10-11; implementation task feature/generative-ui-u5 starts under
policy/delivery.md.

Impact: Documents-only (proposal r2 + index status).

Refs: r2 master record U5; Dev task feature/generative-ui-u5
EOF
)
2026-10-11 14:09:20 +00:00
weichen c7c5f94b64 Propose the U5 action scope for user review
Why: The r2 U5 clause requires a human review of the action scope
before implementation; this draft grounds the decision in the current
command inventory and existing safety machinery.

Evidence: Source facts cited inline (builtin command list with risk
levels, DangerHigh inline-confirm flow with pendingStore, audit
envelope) verified against backend main on 2026-10-11.

Impact: Documents-only (new proposal + index entry); no code changes.

Refs: 2026-10-10-generative-ui-plugin.md (r2 U5); Dev task
feature/generative-ui-u5-scope
2026-10-11 13:50:10 +00:00
weichen a8f1096e78 Record U3 progress in the two-trees master plan and index
Why: U3 landed via RDM PR #201 (merge dbc41b6); the master record must reflect actual progress.

Evidence: SELF U3 closeout doc check exit 0 (receipt in Dev closeout task card).

Impact: proposal status line, U3 progress paragraph, INDEX row only.

Refs: RDM PR #201; Dev feature/rdm-u3-closeout
2026-10-11 13:40:12 +00:00
weichen 9cb09b967c Merge the template/final-target planning branch into main lineage
Why: Dev PR #340 pinned this Documents branch tip while it was never merged into Documents main (cross-repo pin discipline); this reconciliation unifies both planning lineages.

Evidence: merge-base 2a5f658; INDEX conflict resolved as union (U1+U2 progress row + two new plan entries).

Impact: docs only.

Refs: Dev #340
2026-10-11 13:10:38 +00:00
weichen 1673f3cea6 Record U2 progress in the two-trees master plan and index
Why: U2 landed via RDM PR #197 (merge fe8a75b); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF U2 closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #197 merged=True via API.

Impact: proposal status line, U2 progress paragraph, and INDEX row only.

Refs: RDM PR #197; Dev feature/rdm-u2-closeout
2026-10-11 11:22:59 +00:00
weichen 10b0dbe908 Merge the current Documents baseline and preserve both planning entries
Why: retain the newly merged RDM U1 progress alongside the final-target plan.

Evidence: resolved the single index conflict by keeping the updated U1 entry and both new plan links; diff check passed.

Impact: documentation merge only; business validation NOT_RUN.

Refs: docs/proposals/INDEX.md
2026-10-11 08:54:39 +00:00
weichen 6183e99cdb Plan full RDM delivery around shared projects and controlled documents
Why: reconcile the confirmed project, privacy and duty rules with all approved product requirements.

Evidence: current RDM d8d7e743 source review, recorded source receipt, and exact 34 UR/68 SR/10 F matrix checks; business validation NOT_RUN.

Impact: reviewed planning documents only, covering all 69 template types and the existing XLSX asset; no runtime changes.

Refs: docs/proposals/2026-10-11-rdm-final-target-completion.md
2026-10-11 08:54:07 +00:00
weichen 6efdd7dbc7 Record U1 progress in the two-trees master plan and index
Why: U1 landed via RDM PR #195 (merge 05b7d1a); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #195 merged=True via API.

Impact: proposal status line, U1 progress paragraph, and INDEX row only; no scope or requirement change.

Refs: RDM PR #195; Dev feature/rdm-u1-closeout
2026-10-11 08:44:18 +00:00
weichen 90f73ba4e8 Record the confirmed pilot documents and full-catalog direction
Why: preserve the user decision from the previous planning turn before expanding scope.

Evidence: r1.1 records the explicit user response; prior documentation-check receipt is in the Dev task card.

Impact: planning metadata only; no business changes.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:39:47 +00:00
weichen ca9b128f18 Document the storage-migrate tool and the switch/drill runbook (U4)
Why: U4 ships the managed migration entry; the runbook is the operator-facing contract for inventory/backup/migrate, migration identity and resume rules, verification semantics, and the authorized-window switch sequence.

Evidence: backend branch feature/collab-storage-u4-migrator - integration tests green against real PostgreSQL (idempotent rerun, resume, foreign-data refusal, wrong-snapshot refusal, unknown-owner block).

Impact: docs only.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md U4 and section 6.
2026-10-11 08:29:38 +00:00
weichen db6daafde4 Plan template-driven document generation through project conversations
Why: connect the existing RDM assets and two-trees model to a reviewable document workflow.

Evidence: source inventory at RDM 0081628a; document structure and local link checks recorded as SELF in the Dev task card; business validation NOT_RUN.

Impact: planning and inventory documents only; no implementation or deployment.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:23:53 +00:00
weichen 0be6c2d3ee Document the execution budget settings and the KTD13 action-authz compat plan
Why: U3 slice 2 ships admission budgets (runtime.* keys, lease semantics, yield/reacquire) and the host-side action matrix; the runbook is the single source for operators and records the versioned public-contract plan KTD13 requires.

Evidence: backend branch feature/collab-storage-u3-budget-authz (admission.go, action matrix in server.go) with admission/matrix tests green.

Impact: docs only.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md KTD13/R8, section 5 U3.
2026-10-11 05:15:49 +00:00
weichen 76f49b2bc7 Merge authoritative main into the task branch
Why: branch protection requires the head to contain the current base before merge.

Evidence: fetched origin/main=336a90f0ade0ffe049879ca5159a61f0a3948708.

Impact: integrate upstream changes without rewriting task history.

Refs: Documents PR #63
2026-10-11 04:43:23 +00:00
weichen 474955b64d Revise the Generative UI proposal to r2 with the U1 trial results
Why: The U1 controlled trial (three arms on synthetic materials,
MiniMax M3 + M2.7-highspeed, CNY 3 spent of the 200 cap) finished on
2026-10-11; its evidence changes the plan and must live in the master
record: goal-driven structure divergence holds (6/6), generation must
go through tool arguments (text-channel JSON discipline is the floor),
highspeed is rejected as the generator, and the first release keeps the
in-house renderer.

Evidence: Full data and failure taxonomy in Dev task
feature/generative-ui-u1 (.task/genui-u1/report.md, SELF; CI gate on
the Dev PR). Tool-channel and response_format probes recorded there.

Impact: Proposal r1 -> r2 (new results section, catalog/model/channel
revisions); INDEX entry updated. No code or contract changes.

Refs: Dev task feature/generative-ui-u1; Documents PR #60 (r1)
2026-10-11 04:42:37 +00:00
weichen b857595025 Publish the approved two-trees traceability plan r1 with user rulings
Why: the user reviewed and approved the plan (2026-10-11, five stages bundled) and chose a two-tier admin model for KTD4 instead of strict ledger separation.

Evidence: SELF user session rulings recorded in the Dev task card; document-check receipt follows in the task card evidence section.

Impact: proposal r1 and INDEX now record approval and the two-tier admin ruling; no code or deployment change.

Refs: Dev feature/rdm-two-trees-audit-plan
2026-10-11 04:41:29 +00:00
weichen b3171b3d51 Plan RDM project traceability and audit integration
Why: assess existing two-tree and trace-network capabilities and define project-scoped inspection.

Evidence: SELF source receipt and document checks; business and runtime verification were not run.

Impact: pending-review proposal and index only; no product implementation or deployment.

Refs: Dev feature/rdm-two-trees-audit-plan
2026-10-11 04:02:38 +00:00
weichen a47ef7ffcf Merge authoritative main into the task branch 2026-10-11 03:14:06 +00:00
weichen 4ca58c3d8a Add the team-storage runbook for U1 and cross-link usage
Why: the approved collaboration plan U1 requires a fixed deployment manifest, tier config contract, migration mapping, capacity contract, isolation test scheme and KTD14 copy-protection contract as the single source of truth for team-tier operations.

Evidence: contract keys match backend config.go tier/pool fields (U2, backend branch feature/collab-storage-pg-tier); local verification used svc.sh collabtest on 127.0.0.1:8897 and Redis on 6399.

Impact: docs only (new guide + usage.md cross-links); no code change.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md sections 5 (U1/U2), KTD1/KTD8/KTD12/KTD14.
2026-10-11 03:10:45 +00:00
weichen 95a7c111d5 Add the Generative UI research and plugin proposal r1 with user rulings
Why: The user ruled on 2026-10-11 the three open product choices (first
pilot = full analysis page inside the conversation; enable/disable via a
trusted compiled plugin; U1 trial on MiniMax M3 + M2.7-highspeed with
sanitized materials and a CNY 200 cap), so the proposal now publishes as
the direction's master record instead of a local draft.

Evidence: Doc self-check receipts live in the Dev task card
feature/generative-ui-research; the rulings are recorded in the doc's
"用户裁定记录" section and mirrored in INDEX.md.

Impact: Documents-only change (new proposal + index entry). No runtime,
contract, or code changes; U1 trial start and deployment stay separately
reviewed.

Refs: Dev task feature/generative-ui-research
2026-10-11 03:10:16 +00:00
weichen 228cf74468 Merge authoritative main into the task branch 2026-10-11 02:40:54 +00:00
weichen 0f5df5147e Add the approved collaboration storage and distribution plan r1
Why: freeze the direction for 10-100 user multi-project collaboration storage (PostgreSQL team tier, migration, staged multi-instance) before U1+U2 implementation starts.

Evidence: static review record and SELF audit receipt included; user approval recorded in Dev task card 2026-10-11 (instruction to start the transformation per the plan).

Impact: docs only - new proposal, index entry, review record, audit receipt; no code or runtime change.

Refs: Dev .task/feature-collaboration-storage-plan.md; plan section 5 names U1+U2 as the first increment.
2026-10-11 02:40:02 +00:00
weichen 4a3ca0eb5a Backfill the S0-1 completion in the plan and index 2026-10-11 02:29:16 +00:00
weichen cc54cdac76 Backfill the E4 completion in the plan and index 2026-10-11 01:34:07 +00:00
weichen 077ebdf184 Backfill the E5 MiniMax-family A/B result in the plan and index 2026-10-10 17:27:25 +00:00
weichen 19b77a28bc Backfill the E3 completion in the plan and index 2026-10-10 16:39:02 +00:00