Commit Graph
135 Commits
Author SHA1 Message Date
weichen 6c096b9360 Record project event privacy and duty replay refinements
Why: Legacy upload events and synced duty flows need the same private-data and current-state guarantees as new member work.

Evidence: Real legacy SSE leakage and independent duty replay findings; correction evidence remains in the canonical task record.

Impact: Describe trusted per-event sharing and durable duty versions without new mandatory downstream interfaces or runtime changes.

Refs: system-project-membership r1.1; Dev feature/project-member-access
2026-10-13 11:06:42 +00:00
weichen 61e0aef39c Specify system project membership and shared knowledge boundaries
Why: Joined members must see one globally named project and keep private conversations and source documents.\n\nEvidence: Proposal links the fixed implementation plan, explicit authorization and task evidence without claiming deployment or CI success.\n\nImpact: Define optional lifecycle extension, identity recovery, private reads and published knowledge for U2/U3/U5.\n\nRefs: Dev feature/project-member-access
2026-10-13 09:56:06 +00:00
weichen 0b290b7461 Record the login recovery implementation as proposal r3
Why: The 2026-10-13 login recovery flow was approved and merged
(Backend #187, Frontend #76, Dev #504); the master proposal must carry
the three adjudications, implementation record, and evidence pointers
per the repo's lineage conventions.

Evidence: Dev #504 HEAD CI (test/test-pg/svc-realcombo) success; browser
acceptance receipts be7ae9a2/b3a9e691 bound to Dev HEAD 268ef29 (SELF).

Impact: r3 is an implementation record only; R/KTD/U numbering semantics
unchanged; U7 explicitly NOT marked complete (atomic bootstrap and CLI
credential delivery remain). INDEX.md status line updated.

Refs: Dev docs/svc-deploy/2026-10-13-login-recovery-contract.md
2026-10-13 04:30:04 +00:00
weichen a73c84b5be Add RDM settings, members, duties and permissions increment plan r1
Why: 固化 2026-10-13 评审通过的 RDM 完善增量方案(承接总案 U3/U4/U6,衔接 U5),含三处技术评审补充与顺序裁定。
Evidence: 方案核查记录见提案文末;源码锚点 Backend settings.go / RDM perms.go, plugin.go / Frontend adminRdmSections.tsx。
Impact: 仅新增提案文档与索引条目,无代码变更。
Refs: 2026-10-12-rdm-function-implementation-plan.md
2026-10-13 03:22:46 +00:00
weichenandCursor 53354996f2 Record the K4 artifact retest in the collaboration plan
Why: the 2026-10-12 drill left artifact recovery failed, and the retest changed that SELF result without changing the write-traffic gate.
Evidence: backup-20261013-013354 on Dev a83588dd and backend 46073d30; K1-K7 true, RPO 65s, RTO 3s, five artifacts matched and cross-user access returned 404. SELF.
Impact: proposal moves to r2.3. Second-instance writes stay closed until REPLAY or CI and the second host exist.
Refs: docs/records/2026-10-12-u7-ops-drill-report.md docs/proposals/2026-10-11-collaboration-storage-and-distribution.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-13 01:44:03 +00:00
weichen cf74a200e8 Record the corrected workbench candidate and single delivery record
Why: Keep planning progress aligned with actual implemented corrections without duplicating CI and merge state.

Evidence: Reference UI155, Frontend210 and 19 local browser cases via Dev native receipts; final GATE remains separately tracked.

Impact: Planning metadata only; no deployment or model-routing claim.

Refs: work-companion-ui r0.2/r1, UI01-UI13
2026-10-12 19:07:32 +00:00
weichen f7ae1ecce6 Record workbench implementation evidence and remaining delivery gates
Why: Keep the approved design and implementation plan consistent with the current candidate.

Evidence: Reference actual SELF verification and pending independent Review and GATE, without copying command output.

Impact: Planning progress only; inherited live-model capabilities and deployment remain separate.

Refs: UI01-UI13, work-companion-ui U5
2026-10-12 16:59:30 +00:00
weichen b184bfb109 Merge current Documents main into the workbench design branch
Why: preserve concurrent planning records before the Dev combination sync.

Evidence: fetched authoritative Documents main f76cce9e32.

Impact: planning record integration without rewriting history.

Refs: work-companion-ui U5.
2026-10-12 16:32:44 +00:00
weichenandCursor 95c2ec260c Record the U7 ops drill and advance the storage plan to r2.2
Why: B6, C4, and C5 now have same-host results, and the plan still said the ops drills were not done and that replay was the next step.
Evidence: Dev results pgbench-20261012-131948, fault-20261012-142734, and backup-20261012-153441 (SELF). The user declined a capacity replay on 2026-10-12.
Impact: Second-instance writes stay closed. K4 remains a product defect. Replay and C3 are not started.
Refs: feature/u7-ops-drills
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 15:49:44 +00:00
weichen 8d8600024d Record the approved progressive workbench design and implementation plan
Why: implement a simple workbench for nontechnical users under continuous authorization.

Evidence: current source audit and the reviewed r0.1 prototype; runtime verification remains pending.

Impact: design and plan only; task execution state stays in the Dev task card.

Refs: UI01-UI13 and the existing fast-slow display design r1.1.
2026-10-12 15:03:27 +00:00
weichenandCursor cb7e25439a Record D1-D3 deploy remediation on the recovery plan
Why: the 2026-10-12 batch-update failure still had identity, rollback, and real-combo gaps after Dev #474, Backend #180, and RDM #276. The recovery plan is the single record for that work, and the rdmcand data-ownership check needed a written result before any restore.
Evidence: read-only queries on runtime-backups/{dev,rdm1,rdmcand}/20261012T133921Z and the matching domain backups. No business rows were moved.
Impact: adds r3.1 sections D1/D2/D3 and the ownership finding that dev conversations predate rdmcand's use of dev/data, so no cross-instance restore is indicated. r3's earlier unapproved text stays unapproved.
Refs: Dev feature/svc-d1-identity-flow; Backend feature/d1-identity-open
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 13:47:46 +00:00
weichen 3cc6438030 Merge pull request 'Revise svc account durability and recovery plans (r2/r3)' (#87) from feature/svc-account-durability-plan into main
Reviewed-on: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/87
2026-10-12 12:18:24 +00:00
weichen 0952b50aef Merge pull request 'Add fast-slow channel display design r1.1 and U1 plan' (#84) from feature/fast-slow-display-design into main
Reviewed-on: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/84
2026-10-12 12:16:07 +00:00
weichen 9c31d3c308 Merge Documents main into account durability plan branch
Why: keep r2/r3 proposal updates rebase-friendly before PR.
Evidence: origin/main at fetch time.
Impact: Documents feature tip includes latest main.
Refs: feature/svc-account-durability-plan
2026-10-12 12:11:40 +00:00
weichenandCursor dbdec82466 Record U7 capacity window SELF report and plan r2.1
Why: Capacity ladder/60m/2h dual-instance windows finished; planning
progress must reflect SELF-pass vs remaining GATE/REPLAY/C3 gaps.
Evidence: SELF load results summarized in the new capacity report.
Impact: Preferred next becomes independent REPLAY or C3/C4/C5.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 12:07:12 +00:00
weichen ebf655c4d7 Merge Documents main into fast-slow display design branch
Why: Dev #451 cannot pin modules/documents while feature tip and main diverge.
Evidence: merge-tree reports submodule conflict 1048e7c vs 9e4ee27.
Impact: Documents #84 tip includes main@1048e7c plus r1.1/U1 plan.
Refs: Dev PR #451; Documents PR #84
2026-10-12 12:07:02 +00:00
weichen fe8d08be21 Record the final baseline and isolated candidate data
Why: distinguish timed observations from current service ownership.

Evidence: SELF task-sync and read-only observations at 18:14 Beijing time.

Impact: planning metadata only; runtime and component deployment unchanged by this task.

Refs: account r2; recovery r3
2026-10-12 10:16:32 +00:00
weichen dca4265e37 Plan stable accounts and durable service recovery
Why: account help, dev credential writes and crash recovery need a current, reviewable contract.

Evidence: SELF source and sanitized runtime observations; seven document review lenses; business and fault validation NOT_RUN.

Impact: revise two planning documents only; preserve prior approvals and mark additions pending review.

Refs: Dev feature/svc-account-durability-plan; account r2; recovery r3
2026-10-12 10:09:49 +00:00
weichen a183e663de Propose RDM function implementation plan r1
Why: 2026-10-12 全系统核对产出的功能/实现矩阵与 U1-U9 整改方案需入仓评审;独立文件已过期于共享门禁解除。
Evidence: 报告含冻结源码/运行时快照与逐条需求索引;发布补记记录冻结后部署时序与 U2 已合入切片(RDM PR #251/#254/#256/#258)。
Impact: 仅新增 docs/proposals 一份方案与 README 入口;不改代码与既有文档。
Refs: RDM docs/requirements V2.2、Documents 2026-10-11-rdm-final-target-completion.md
2026-10-12 09:28:44 +00:00
weichen 9e4ee27c7e Mark fast-slow U1 plan approved for implementation
Why: User authorized stage-5 start; record plan status for executors.
Evidence: Chat authorization "开始"; no runtime tests.
Impact: Documents proposal status only.
Refs: 2026-10-12-fast-slow-channel-display-u1-plan.md
2026-10-12 07:39:03 +00:00
weichen 5b71525818 Merge Documents main into fast-slow display design branch 2026-10-12 07:33:22 +00:00
weichenandCursor f9d96dfc59 Add fast-slow display design r1.1 and U1 plan
Why: Record approved stage-4 design with R03 splits and U1 exit
whitelist, plus stage-5 U1 implementation plan for review.
Evidence: Document edits only; no runtime verification.
Impact: Documents proposals INDEX; no business code.
Refs: feature/fast-slow-display-design

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 07:31:46 +00:00
weichenandCursor 2cec59016a Update collab storage plan progress to r2 after U1-U7
Why: Delivery requires writing planning progress back after U7
landed; the proposal still claimed U1+U2 start / NOT_RUN.
Evidence: SELF doc edit against archived U7 cards and release
checklist A1-A7/B1 facts.
Impact: Readers see code-done vs capacity-window-pending; adds
HTTP multi-instance vs Manager-test lesson.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 06:39:26 +00:00
weichen 9d9b1523c8 Merge Documents main into svc unified-deploy proposal branch
Why: Dev #422 conflicted on modules/documents gitlink after main advanced past the proposal pin.
2026-10-12 05:26:12 +00:00
weichen e39d327850 Record GenUI prod-acceptance action fixes on the usage guide
Why: Capture nil-card panic and intent data-flatten field fixes found
during local prod acceptance without revising the final closure verdict.
Evidence: Backend#173 #174; prod action checklist
Impact: Field-fix log lists the two hotfixes and their PRs.
Refs: GenUI prod deploy; fix track
2026-10-12 04:17:07 +00:00
weichen 66ddd37870 Note Generative UI prod instance acceptance on the usage guide
Why: Record that the known-boundary production deploy/acceptance ran
on the local prod svc instance with auth and PG.
Evidence: scripts/svc.sh prod list; acceptance API checklist
Impact: Usage guide boundary list no longer says deploy is pending.
Refs: GenUI prod deploy task
2026-10-12 04:08:58 +00:00
weichenandCursor 16cafca00c Approve Generative UI auto-trigger opt-in design
Why: Capture the fixed opt-in/budget/anti-self-trigger decisions and
update the usage guide boundary list.
Evidence: proposal r1 status approved
Impact: Authority for backend auto-present implementation.
Refs: plan GenUI boundaries T2/T3

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:46:26 +00:00
weichenandCursor 7df7d786d0 Record r1 approval for svc unified deploy proposal
Why: user approved the proposal and U1/U4 specs and authorized push/PRs
plus U1/U4 implementation start.
Evidence: SELF conversation approval 2026-10-12; implementation still NOT_RUN.
Impact: planning status only.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:32:55 +00:00
weichenandCursor 923537e9a1 Add svc unified deploy and one-time login key proposal r1
Why: capture the reviewed design for binary/source install, env prep,
and passwordless activation via one-time restricted sessions.
Evidence: SELF source review against Dev af9c2de; implementation NOT_RUN.
Impact: Documents planning index only; no runtime change.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:28:37 +00:00
weichen 0b314e2029 Record the admin-zone partition delivery in the two-trees plan progress
Why: policy requires updating applicable plan progress on task
completion; WP3-I3 landed the admin-zone entrance via the generic
declaration mechanism.
Evidence: Dev PR #414 and live verification comment (R5, SELF).
Impact: progress line of 2026-10-11-rdm-two-trees-trace-audit-integration.md only.
Refs: WP3-I3/KTD4.
2026-10-12 03:24:50 +00:00
weichenandCursor 7fbfad1851 Approve B-class allowlist for help and intent actions
Why: Record the independent U5-style review for the first two B-class
surface actions and update the usage guide allowlist note.
Evidence: proposal r1 status approved; usage doc API table updated.
Impact: Documents authority for backend whitelist implementation.
Refs: U5 action-scope r2; plan GenUI boundaries 2026-10-12

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:19:03 +00:00
weichen 877d0683cd Add the Generative UI usage guide and U1-U6 evaluation record (final)
Why: The direction closes at U7 - the master record needs its
companion usage guide (enable/generate/revise/act/disable for owners)
and the combined evaluation record covering every landed increment
with its evidence chain and known boundaries.

Evidence: Live E2E on dev@b634a27 (real MiniMax-M3): progress page
presented autonomously, conversation surfaces=2, project aggregation
returns cross-conversation pages under the owner scope; receipts in
Dev task feature/generative-ui-u7-acceptance.

Impact: Documents-only (new guide + index closeout).

Refs: r2 master record; U5 scope r2; Dev task
feature/generative-ui-u7-acceptance
2026-10-12 02:47:27 +00:00
weichen da59ccff04 Track the merged svc-autorecover outcome in the review record and index
Why: between the review round and the approval decision another session completed and merged svc-autorecover (PR #396/#400/#401/#402), so the (a)-decision tracking must reflect the landed slice and the remaining U2 delta.

Evidence: SELF - merged main history c622372 and archived card .task/archive/feature-svc-autorecover.md (10/10 tests, 146/146 governance, CI green on e0b49d1).

Impact: review record, INDEX; proposal r2 body unchanged.

Refs: PR #396 #401
2026-10-12 01:29:31 +00:00
weichen 5a807933c2 Record the r2 approval and the svc-autorecover vehicle decision
Why: the human gate resolved on 2026-10-12 - r2 approved (five stages at once) and option (a) adopted; the review record, proposal index and status navigation must reflect it.

Evidence: SELF - user decision relayed in conversation; stage-review details in the Dev task card; proposal r2 body unchanged (SHA256 9cfda252...).

Impact: review record, INDEX entry; no plan content change.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-12 01:26:50 +00:00
weichen 71cd9d1db2 Record the post-sync drift check and svc-autorecover in-flight findings in the review record
Why: the reviewer record must reflect that all r2 gap claims hold at the post-sync backend pin 25fbea85, and that the svc-autorecover ownership decision now has 373 lines of unregistered, partially failing in-flight work to weigh.

Evidence: SELF - drift-check receipt in the Dev task card (exit 0, all cited gaps hold); svc-autorecover suite observed 5 of 10 tests failing on 2026-10-11.

Impact: review record addendum only; proposal r2 (SHA256 9cfda252...) unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:51:54 +00:00
weichen cbc64eb8ab Revise the recovery proposal to r2 with external review findings
Why: absorb the external source-review round - pin the shutdown budget change, close the U1 acceptance gap for program/cwd changes, gate U4 public states on a mapping table, and make the svc-autorecover coordination an explicit human decision.

Evidence: SELF - external review round 2 in the review record; r2 SHA256 9cfda2520b913e6966c68fb3f66fb7bc8382a8f7a2b69cb364122216dcdb72cd; all reviewed claims re-verified against the pinned baselines.

Impact: documents only; four targeted amendments (U1/U3/U4/section 9) plus version bump and INDEX update; requirements and metrics unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:45:09 +00:00
weichen 54fc24e4d5 Add the service restart and recovery proposal r1 with review record
Why: pin the reviewed candidate as a fixed git object before human review (external review P1.1); untracked drafts made check-evidence report unverified.

Evidence: SELF - proposal SHA256 cfc9b768a4596a268810e20101cddc2a6040e24a640e6e34dbda17b838cd45ed matches the review record; source baseline Dev 5e57029b, Backend eb12f102, Core 89f3906c, Frontend aaced879, Documents 23e2276.

Impact: documents repo only; adds proposal r1, six-lens review record and INDEX entry; no implementation, NOT_RUN statuses preserved.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:42:23 +00:00
weichen 2085447701 Record U5 progress and mark U1-U5 implementation complete in the master plan
Why: U5 landed via RDM PR #213 (merge 1dce69d); all five implementation units now complete.

Evidence: RDM PR #213 merged=True.

Impact: plan status + U5 progress + INDEX.

Refs: RDM PR #213
2026-10-11 15:57:13 +00:00
weichen 895a7204b9 Record U4 progress in the two-trees master plan and index
Why: U4 landed via Dev PR #368 (merge 7aa8fd9).

Evidence: Dev PR #368 merged; CI green.

Impact: status line + U4 progress + INDEX only.

Refs: Dev PR #368
2026-10-11 15:07:53 +00:00
weichen b6b6059222 Record the user ruling to gate U6 on owner experience
Why: The U6 precondition (benefit evidence from U4/U5) resolves to the
owner actually using the landed U1-U5 capability - the human usability
comparison marked NOT_RUN since U1 finds its execution path here; the
user ruled 2026-10-11 to evaluate first and decide U6 after.

Evidence: Ruling collected via the session question panel on
2026-10-11; U1-U5 all merged (Dev #329/#336/#345/#351/#367).

Impact: Documents-only (master record U6 gate note + index status).

Refs: r2 U6 clause; Dev task feature/generative-ui-u6-gate-record
EOF
)
2026-10-11 15:01:08 +00:00
weichen aba1d6a3d6 Record the user approval of the U5 action scope
Why: The user ruled on the three questions (categories and ranges
approved as proposed; C-class limited to plugin KV plus task ledger;
confirm UX reuses the inline card); the proposal becomes the approved
scope and unblocks the U5 implementation task.

Evidence: Ruling collected via the session question panel on
2026-10-11; implementation task feature/generative-ui-u5 starts under
policy/delivery.md.

Impact: Documents-only (proposal r2 + index status).

Refs: r2 master record U5; Dev task feature/generative-ui-u5
EOF
)
2026-10-11 14:09:20 +00:00
weichen c7c5f94b64 Propose the U5 action scope for user review
Why: The r2 U5 clause requires a human review of the action scope
before implementation; this draft grounds the decision in the current
command inventory and existing safety machinery.

Evidence: Source facts cited inline (builtin command list with risk
levels, DangerHigh inline-confirm flow with pendingStore, audit
envelope) verified against backend main on 2026-10-11.

Impact: Documents-only (new proposal + index entry); no code changes.

Refs: 2026-10-10-generative-ui-plugin.md (r2 U5); Dev task
feature/generative-ui-u5-scope
2026-10-11 13:50:10 +00:00
weichen a8f1096e78 Record U3 progress in the two-trees master plan and index
Why: U3 landed via RDM PR #201 (merge dbc41b6); the master record must reflect actual progress.

Evidence: SELF U3 closeout doc check exit 0 (receipt in Dev closeout task card).

Impact: proposal status line, U3 progress paragraph, INDEX row only.

Refs: RDM PR #201; Dev feature/rdm-u3-closeout
2026-10-11 13:40:12 +00:00
weichen 9cb09b967c Merge the template/final-target planning branch into main lineage
Why: Dev PR #340 pinned this Documents branch tip while it was never merged into Documents main (cross-repo pin discipline); this reconciliation unifies both planning lineages.

Evidence: merge-base 2a5f658; INDEX conflict resolved as union (U1+U2 progress row + two new plan entries).

Impact: docs only.

Refs: Dev #340
2026-10-11 13:10:38 +00:00
weichen 1673f3cea6 Record U2 progress in the two-trees master plan and index
Why: U2 landed via RDM PR #197 (merge fe8a75b); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF U2 closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #197 merged=True via API.

Impact: proposal status line, U2 progress paragraph, and INDEX row only.

Refs: RDM PR #197; Dev feature/rdm-u2-closeout
2026-10-11 11:22:59 +00:00
weichen 10b0dbe908 Merge the current Documents baseline and preserve both planning entries
Why: retain the newly merged RDM U1 progress alongside the final-target plan.

Evidence: resolved the single index conflict by keeping the updated U1 entry and both new plan links; diff check passed.

Impact: documentation merge only; business validation NOT_RUN.

Refs: docs/proposals/INDEX.md
2026-10-11 08:54:39 +00:00
weichen 6183e99cdb Plan full RDM delivery around shared projects and controlled documents
Why: reconcile the confirmed project, privacy and duty rules with all approved product requirements.

Evidence: current RDM d8d7e743 source review, recorded source receipt, and exact 34 UR/68 SR/10 F matrix checks; business validation NOT_RUN.

Impact: reviewed planning documents only, covering all 69 template types and the existing XLSX asset; no runtime changes.

Refs: docs/proposals/2026-10-11-rdm-final-target-completion.md
2026-10-11 08:54:07 +00:00
weichen 6efdd7dbc7 Record U1 progress in the two-trees master plan and index
Why: U1 landed via RDM PR #195 (merge 05b7d1a); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #195 merged=True via API.

Impact: proposal status line, U1 progress paragraph, and INDEX row only; no scope or requirement change.

Refs: RDM PR #195; Dev feature/rdm-u1-closeout
2026-10-11 08:44:18 +00:00
weichen 90f73ba4e8 Record the confirmed pilot documents and full-catalog direction
Why: preserve the user decision from the previous planning turn before expanding scope.

Evidence: r1.1 records the explicit user response; prior documentation-check receipt is in the Dev task card.

Impact: planning metadata only; no business changes.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:39:47 +00:00
weichen ca9b128f18 Document the storage-migrate tool and the switch/drill runbook (U4)
Why: U4 ships the managed migration entry; the runbook is the operator-facing contract for inventory/backup/migrate, migration identity and resume rules, verification semantics, and the authorized-window switch sequence.

Evidence: backend branch feature/collab-storage-u4-migrator - integration tests green against real PostgreSQL (idempotent rerun, resume, foreign-data refusal, wrong-snapshot refusal, unknown-owner block).

Impact: docs only.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md U4 and section 6.
2026-10-11 08:29:38 +00:00