Commit Graph
156 Commits
Author SHA1 Message Date
weichen 10b442169c Distinguish historical proposal limits from current authorization
Why: old r2 and r3 draft-stage paragraphs contradicted the retained approval records and current user takeover authorization.
Evidence: independent Documents review identified the ambiguity; targeted diff and link checks are captured outside the candidate.
Impact: label historical planning limits without changing genuine NOT_RUN results, deployment boundaries, or the newer login recovery implementation record.
Refs: Documents PR #89; Dev PR #489; independent review /tmp/mq-trial489-docs-independent-review-20261014.json
2026-10-14 01:08:51 +00:00
weichen b096191a84 Integrate approved proposal status with current documentation
Why: retain the approved recovery and account additions while preserving the newer login recovery record and all current documentation.
Evidence: diff checks and affected links are captured by the evidence tool; historical CI remains scoped to its original object and is not current admission.
Impact: merge the current document target into the existing status task, preserve r3 records, and apply the user mandate that agents execute merges.
Refs: Documents PR #89; Dev PR #489; merge queue Issue #518; user continuation authorization on 2026-10-14
2026-10-14 00:59:08 +00:00
weichen 1f3bd54cfb Define the approved single-project rename projection boundary
Why: Preserve delegated project settings while keeping physical Host mutations owner-scoped.

Evidence: User explicitly approved the independently reviewed amendment and repair plan; original amendment digest recorded in the contract.

Impact: Clarify actual-actor authorization and audit, single-target owner projection, durable recovery and masked metadata; no provider implementation or deployment claim.

Refs: IAM I1 host projection amendment r1; Documents PR 98; Dev policy/delivery.md affected stages 4-5.
2026-10-13 16:04:31 +00:00
weichen ba9d76426d Identify the provider snapshot used by the IAM contract
Why: Avoid presenting an earlier extension surface as the current provider after main advances.

Evidence: Independent documentation review identified a non-blocking version attribution issue.

Impact: Attribute the existing-capability table to Backend 0f192a48; preserve contract semantics and approved plan digest.

Refs: IAM I1 stage 8 document review.
2026-10-13 15:37:31 +00:00
weichen 30bceb748f Align IAM contract navigation with accepted delivery stage
Why: Remove stale local-review and pending-acceptance statements after user confirmation.

Evidence: Independent stage 8 documentation review identified the status mismatch.

Impact: Update delivery status only; preserve permission semantics and the approved plan digest.

Refs: 2026-10-13 IAM I1 acceptance record; Dev policy/delivery.md.
2026-10-13 15:34:16 +00:00
weichen b4a2573742 Record user acceptance of IAM I1 validation
Why: Preserve the explicit stage 7 decision before formal review and integration.

Evidence: User confirmation in this session; document consistency receipt 17a3542f8e69fc899a05a152d258b721a8aaab4cd0a3629f8f5cbb7364d77d84 (SELF).

Impact: Record acceptance of the fixed I1 candidate and its stated limitations; leave the approved plan unchanged.

Refs: Dev policy/delivery.md stages 7-9; IAM I1 permission contract.
2026-10-13 15:30:37 +00:00
weichen 1f83bb7ffe Merge remote-tracking branch 'origin/main' into feature/iam-i1-permission-contract 2026-10-13 15:27:22 +00:00
weichen 064d4b5f68 Present the bounded I1 acceptance candidate and evidence gaps
Why: Stage 6 is approved and formal command/API results need a version-bound human acceptance decision.

Evidence: Complete SELF receipts and independent replays are linked to fixed Dev/RDM subjects; the original implementation approval is retained.

Impact: Record test coverage, predicate corrections, immutable product digests and explicitly untested later scopes. Do not mark user acceptance or shipping complete.

Refs: IAM I1 U1-U2; phase 7 acceptance
2026-10-13 14:52:43 +00:00
weichen 2d5398e988 Record user approval of the I1 implementation
Why: The user approved the previously delivered local implementation and compatibility effects.

Evidence: This chat reply says approval; its objects remain c023551 Documents, b93908e RDM and 72ed8b4 Dev. Execution receipts are separate from this human decision.

Impact: Stage 6 passes and planned stage 7 begins; acceptance, shipping, later increments and production operations are not approved by substitution.

Refs: I1 implementation review on 2026-10-13
2026-10-13 14:31:56 +00:00
weichen 8375057829 Merge commit '047d362c72ec2c095ec14e1d2f2d152f94471faf' into feature/iam-i1-permission-contract 2026-10-13 14:21:43 +00:00
weichen 32d6c8487a Merge the authoritative document baseline before delivery
Why: The process-document main branch advanced with project membership and privacy records after this implementation plan was reviewed.

Evidence: origin/main was freshly fetched; the reviewed plan remains the same and the final combined document checks will be replayed on the resulting head.

Impact: Preserve the other task's proposal and index entries alongside the approved merge queue plan, without changing its scope or execution authorization.

Refs: Documents PR #96; origin/main 047d362; independent review docs_delivery_review
2026-10-13 14:20:31 +00:00
weichen 6c096b9360 Record project event privacy and duty replay refinements
Why: Legacy upload events and synced duty flows need the same private-data and current-state guarantees as new member work.

Evidence: Real legacy SSE leakage and independent duty replay findings; correction evidence remains in the canonical task record.

Impact: Describe trusted per-event sharing and durable duty versions without new mandatory downstream interfaces or runtime changes.

Refs: system-project-membership r1.1; Dev feature/project-member-access
2026-10-13 11:06:42 +00:00
weichen c023551f2a Record verified I1 local checks and pending human review
Why: Separate observed local implementation and test results from formal acceptance, CI and deployment.

Evidence: Complete SELF outputs and fixed subjects are in the owning Dev and RDM task cards; independent preliminary review passed on dfb9c407.

Impact: Update review progress and explicit follow-up boundaries only; preserve approved plan and permission contract.

Refs: IAM I1 U1-U2
2026-10-13 10:46:39 +00:00
weichen b8fcf01062 Record the I1 local implementation candidate and review boundaries
Why: The approved plan needs traceable local progress and explicit capability limitations before human implementation review.

Evidence: The owning task cards retain full local SELF startup, sync, red and green outputs; final combination checks and independent review are pending in this checkpoint.

Impact: Preserve the original approved plan and identify I1 behavior, deferred capabilities and the next separately authorized unit.

Refs: IAM plan r1; I1 U1-U2
2026-10-13 10:39:21 +00:00
weichen f1a44fdac6 Clarify the implementation plan observations as their authoring baseline
Why: Historical observations in the approved plan used current-tense wording after implementation advanced, making the progress pointer harder to interpret.

Evidence: Independent documentation review identified the wording; the diff changes only baseline time and references current task/PR evidence. Document replay follows on the new candidate.

Impact: No change to approved units, interfaces, authorization or acceptance criteria; actual progress remains in the task and fixed-candidate records.

Refs: Documentation review Minor finding; approved plan ba4044d; U1-U6
2026-10-13 10:30:39 +00:00
weichen b91e298c15 Clarify fail-closed I1 host capability boundaries
Why: Existing public host contracts cannot prove source ownership, scoped revocation or private artifact filtering.

Evidence: The I1 documentation consistency checker preserves the approved plan digest and fixed RDM core rules; behavior verification is recorded in the owning task.

Impact: Record conservative I1 defaults and explicit follow-up provider requirements without adding public implementations.

Refs: IAM plan r1, I1 U1-U2
2026-10-13 10:27:09 +00:00
weichen 61e0aef39c Specify system project membership and shared knowledge boundaries
Why: Joined members must see one globally named project and keep private conversations and source documents.\n\nEvidence: Proposal links the fixed implementation plan, explicit authorization and task evidence without claiming deployment or CI success.\n\nImpact: Define optional lifecycle extension, identity recovery, private reads and published knowledge for U2/U3/U5.\n\nRefs: Dev feature/project-member-access
2026-10-13 09:56:06 +00:00
weichen 2cc00da9e0 Define the I1 permission and public extension contract
Why: separate protected system actions from project authority and freeze the approved identity and resource boundaries.

Evidence: SELF document check recorded by Dev evidence; approved plan digest retained and fixed-base core rules preserved.

Impact: contract and navigation only; provider implementations, multi-role migration and deployment remain later increments.

Refs: IAM plan r1 U1; Agent-System-Dev feature/iam-i1-permission-boundaries
2026-10-13 09:30:34 +00:00
weichen a088809dc8 Preserve the approved identity and permission plan
Why: provide the approved contract for the I1 implementation without altering its accepted content.

Evidence: SELF source artifact SHA-256 39b8e9a6e078dc509bd80118c1807ce6ed23e4466e5902b51f4bfa255d55c0a1; user approved the plan and authorized U1-U2.

Impact: documentation checkpoint only; no production code or runtime changes.

Refs: Agent-System-Dev feature/iam-i1-permission-boundaries
2026-10-13 09:08:51 +00:00
weichen 407e49d2ba Remove trailing blank lines from merge queue candidate documents
Why: Validation of the complete candidate against origin/main detected added blank lines at the end of the authored documents.

Evidence: git diff --check origin/main validates the final candidate format; unchanged semantic content remains covered by the approved specification and implementation plan.

Impact: Document whitespace only; no version obligations, execution mode or authorization change.

Refs: Merge queue implementation plan U4; formal document validation
2026-10-13 08:59:34 +00:00
weichen 652be93a60 Record plan approval and link implementation evidence
Why: preserve the approved plan and point readers to the actual task objects instead of treating historical planning state as current delivery status.

Evidence: user approval of plan r1 and Dev task-card receipts; actual platform activation and real trial remain NOT_RUN.

Impact: plan metadata, test-file organization and navigation only; task state remains authoritative in Dev.

Refs: docs/proposals/2026-10-13-merge-queue-implementation-plan.md; Dev .task/feature-merge-queue-policy-draft.md
2026-10-13 08:22:35 +00:00
weichen ba4044d57e Plan serial delivery windows and compatible task recovery
Why: turn the confirmed scheduling specification into sequenced work with explicit interfaces, evidence handling and admission validation.

Evidence: SELF plan checks verified fixed source commits, 83 relative links, six units and four Python example blocks; implementation and runtime checks remain NOT_RUN.

Impact: reviewable implementation plan and navigation only; no task scripts, workflow, platform settings or business behavior are implemented.

Refs: docs/proposals/2026-10-13-merge-queue-implementation-plan.md; Dev policy/merge-queue.md r1; Development-Guidelines draft.11
2026-10-13 06:40:14 +00:00
weichen 0b290b7461 Record the login recovery implementation as proposal r3
Why: The 2026-10-13 login recovery flow was approved and merged
(Backend #187, Frontend #76, Dev #504); the master proposal must carry
the three adjudications, implementation record, and evidence pointers
per the repo's lineage conventions.

Evidence: Dev #504 HEAD CI (test/test-pg/svc-realcombo) success; browser
acceptance receipts be7ae9a2/b3a9e691 bound to Dev HEAD 268ef29 (SELF).

Impact: r3 is an implementation record only; R/KTD/U numbering semantics
unchanged; U7 explicitly NOT marked complete (atomic bootstrap and CLI
credential delivery remain). INDEX.md status line updated.

Refs: Dev docs/svc-deploy/2026-10-13-login-recovery-contract.md
2026-10-13 04:30:04 +00:00
weichen a73c84b5be Add RDM settings, members, duties and permissions increment plan r1
Why: 固化 2026-10-13 评审通过的 RDM 完善增量方案(承接总案 U3/U4/U6,衔接 U5),含三处技术评审补充与顺序裁定。
Evidence: 方案核查记录见提案文末;源码锚点 Backend settings.go / RDM perms.go, plugin.go / Frontend adminRdmSections.tsx。
Impact: 仅新增提案文档与索引条目,无代码变更。
Refs: 2026-10-12-rdm-function-implementation-plan.md
2026-10-13 03:22:46 +00:00
weichenandCursor 53354996f2 Record the K4 artifact retest in the collaboration plan
Why: the 2026-10-12 drill left artifact recovery failed, and the retest changed that SELF result without changing the write-traffic gate.
Evidence: backup-20261013-013354 on Dev a83588dd and backend 46073d30; K1-K7 true, RPO 65s, RTO 3s, five artifacts matched and cross-user access returned 404. SELF.
Impact: proposal moves to r2.3. Second-instance writes stay closed until REPLAY or CI and the second host exist.
Refs: docs/records/2026-10-12-u7-ops-drill-report.md docs/proposals/2026-10-11-collaboration-storage-and-distribution.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-13 01:44:03 +00:00
weichen cf74a200e8 Record the corrected workbench candidate and single delivery record
Why: Keep planning progress aligned with actual implemented corrections without duplicating CI and merge state.

Evidence: Reference UI155, Frontend210 and 19 local browser cases via Dev native receipts; final GATE remains separately tracked.

Impact: Planning metadata only; no deployment or model-routing claim.

Refs: work-companion-ui r0.2/r1, UI01-UI13
2026-10-12 19:07:32 +00:00
weichen f7ae1ecce6 Record workbench implementation evidence and remaining delivery gates
Why: Keep the approved design and implementation plan consistent with the current candidate.

Evidence: Reference actual SELF verification and pending independent Review and GATE, without copying command output.

Impact: Planning progress only; inherited live-model capabilities and deployment remain separate.

Refs: UI01-UI13, work-companion-ui U5
2026-10-12 16:59:30 +00:00
weichen b184bfb109 Merge current Documents main into the workbench design branch
Why: preserve concurrent planning records before the Dev combination sync.

Evidence: fetched authoritative Documents main f76cce9e32.

Impact: planning record integration without rewriting history.

Refs: work-companion-ui U5.
2026-10-12 16:32:44 +00:00
weichenandCursor 95c2ec260c Record the U7 ops drill and advance the storage plan to r2.2
Why: B6, C4, and C5 now have same-host results, and the plan still said the ops drills were not done and that replay was the next step.
Evidence: Dev results pgbench-20261012-131948, fault-20261012-142734, and backup-20261012-153441 (SELF). The user declined a capacity replay on 2026-10-12.
Impact: Second-instance writes stay closed. K4 remains a product defect. Replay and C3 are not started.
Refs: feature/u7-ops-drills
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 15:49:44 +00:00
weichenandCursor b8df6f3c2a Record the approved U8, U7, and export status
Why: the 2026-10-12 approval covers the recovery U8 and account U7 additions, and the RDM U5 note still treated the lifecycle pull request as the whole export.
Evidence: Backend 183 and 185 plus Dev 486 were already green; Dev 482, RDM 301, Frontend 73, and Dev 488 remain open and are not marked merged.
Impact: proposal status only. No implementation or deployment claim changes.
Refs: docs/proposals/2026-10-12-service-restart-data-recovery.md, docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md, docs/proposals/2026-10-11-rdm-two-trees-trace-audit-integration.md
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 15:40:45 +00:00
weichen 8d8600024d Record the approved progressive workbench design and implementation plan
Why: implement a simple workbench for nontechnical users under continuous authorization.

Evidence: current source audit and the reviewed r0.1 prototype; runtime verification remains pending.

Impact: design and plan only; task execution state stays in the Dev task card.

Refs: UI01-UI13 and the existing fast-slow display design r1.1.
2026-10-12 15:03:27 +00:00
weichenandCursor cb7e25439a Record D1-D3 deploy remediation on the recovery plan
Why: the 2026-10-12 batch-update failure still had identity, rollback, and real-combo gaps after Dev #474, Backend #180, and RDM #276. The recovery plan is the single record for that work, and the rdmcand data-ownership check needed a written result before any restore.
Evidence: read-only queries on runtime-backups/{dev,rdm1,rdmcand}/20261012T133921Z and the matching domain backups. No business rows were moved.
Impact: adds r3.1 sections D1/D2/D3 and the ownership finding that dev conversations predate rdmcand's use of dev/data, so no cross-instance restore is indicated. r3's earlier unapproved text stays unapproved.
Refs: Dev feature/svc-d1-identity-flow; Backend feature/d1-identity-open
Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 13:47:46 +00:00
weichen 3cc6438030 Merge pull request 'Revise svc account durability and recovery plans (r2/r3)' (#87) from feature/svc-account-durability-plan into main
Reviewed-on: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/87
2026-10-12 12:18:24 +00:00
weichen 0952b50aef Merge pull request 'Add fast-slow channel display design r1.1 and U1 plan' (#84) from feature/fast-slow-display-design into main
Reviewed-on: https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Documents/pulls/84
2026-10-12 12:16:07 +00:00
weichen 9c31d3c308 Merge Documents main into account durability plan branch
Why: keep r2/r3 proposal updates rebase-friendly before PR.
Evidence: origin/main at fetch time.
Impact: Documents feature tip includes latest main.
Refs: feature/svc-account-durability-plan
2026-10-12 12:11:40 +00:00
weichenandCursor dbdec82466 Record U7 capacity window SELF report and plan r2.1
Why: Capacity ladder/60m/2h dual-instance windows finished; planning
progress must reflect SELF-pass vs remaining GATE/REPLAY/C3 gaps.
Evidence: SELF load results summarized in the new capacity report.
Impact: Preferred next becomes independent REPLAY or C3/C4/C5.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 12:07:12 +00:00
weichen ebf655c4d7 Merge Documents main into fast-slow display design branch
Why: Dev #451 cannot pin modules/documents while feature tip and main diverge.
Evidence: merge-tree reports submodule conflict 1048e7c vs 9e4ee27.
Impact: Documents #84 tip includes main@1048e7c plus r1.1/U1 plan.
Refs: Dev PR #451; Documents PR #84
2026-10-12 12:07:02 +00:00
weichen fe8d08be21 Record the final baseline and isolated candidate data
Why: distinguish timed observations from current service ownership.

Evidence: SELF task-sync and read-only observations at 18:14 Beijing time.

Impact: planning metadata only; runtime and component deployment unchanged by this task.

Refs: account r2; recovery r3
2026-10-12 10:16:32 +00:00
weichen dca4265e37 Plan stable accounts and durable service recovery
Why: account help, dev credential writes and crash recovery need a current, reviewable contract.

Evidence: SELF source and sanitized runtime observations; seven document review lenses; business and fault validation NOT_RUN.

Impact: revise two planning documents only; preserve prior approvals and mark additions pending review.

Refs: Dev feature/svc-account-durability-plan; account r2; recovery r3
2026-10-12 10:09:49 +00:00
weichen a183e663de Propose RDM function implementation plan r1
Why: 2026-10-12 全系统核对产出的功能/实现矩阵与 U1-U9 整改方案需入仓评审;独立文件已过期于共享门禁解除。
Evidence: 报告含冻结源码/运行时快照与逐条需求索引;发布补记记录冻结后部署时序与 U2 已合入切片(RDM PR #251/#254/#256/#258)。
Impact: 仅新增 docs/proposals 一份方案与 README 入口;不改代码与既有文档。
Refs: RDM docs/requirements V2.2、Documents 2026-10-11-rdm-final-target-completion.md
2026-10-12 09:28:44 +00:00
weichen 9e4ee27c7e Mark fast-slow U1 plan approved for implementation
Why: User authorized stage-5 start; record plan status for executors.
Evidence: Chat authorization "开始"; no runtime tests.
Impact: Documents proposal status only.
Refs: 2026-10-12-fast-slow-channel-display-u1-plan.md
2026-10-12 07:39:03 +00:00
weichen 5b71525818 Merge Documents main into fast-slow display design branch 2026-10-12 07:33:22 +00:00
weichenandCursor f9d96dfc59 Add fast-slow display design r1.1 and U1 plan
Why: Record approved stage-4 design with R03 splits and U1 exit
whitelist, plus stage-5 U1 implementation plan for review.
Evidence: Document edits only; no runtime verification.
Impact: Documents proposals INDEX; no business code.
Refs: feature/fast-slow-display-design

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 07:31:46 +00:00
weichenandCursor 2cec59016a Update collab storage plan progress to r2 after U1-U7
Why: Delivery requires writing planning progress back after U7
landed; the proposal still claimed U1+U2 start / NOT_RUN.
Evidence: SELF doc edit against archived U7 cards and release
checklist A1-A7/B1 facts.
Impact: Readers see code-done vs capacity-window-pending; adds
HTTP multi-instance vs Manager-test lesson.
Refs: Dev feature/u7-capacity-wrap-measure; release-multi-instance.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 06:39:26 +00:00
weichen 9d9b1523c8 Merge Documents main into svc unified-deploy proposal branch
Why: Dev #422 conflicted on modules/documents gitlink after main advanced past the proposal pin.
2026-10-12 05:26:12 +00:00
weichen e39d327850 Record GenUI prod-acceptance action fixes on the usage guide
Why: Capture nil-card panic and intent data-flatten field fixes found
during local prod acceptance without revising the final closure verdict.
Evidence: Backend#173 #174; prod action checklist
Impact: Field-fix log lists the two hotfixes and their PRs.
Refs: GenUI prod deploy; fix track
2026-10-12 04:17:07 +00:00
weichen 66ddd37870 Note Generative UI prod instance acceptance on the usage guide
Why: Record that the known-boundary production deploy/acceptance ran
on the local prod svc instance with auth and PG.
Evidence: scripts/svc.sh prod list; acceptance API checklist
Impact: Usage guide boundary list no longer says deploy is pending.
Refs: GenUI prod deploy task
2026-10-12 04:08:58 +00:00
weichenandCursor 16cafca00c Approve Generative UI auto-trigger opt-in design
Why: Capture the fixed opt-in/budget/anti-self-trigger decisions and
update the usage guide boundary list.
Evidence: proposal r1 status approved
Impact: Authority for backend auto-present implementation.
Refs: plan GenUI boundaries T2/T3

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:46:26 +00:00
weichenandCursor 7df7d786d0 Record r1 approval for svc unified deploy proposal
Why: user approved the proposal and U1/U4 specs and authorized push/PRs
plus U1/U4 implementation start.
Evidence: SELF conversation approval 2026-10-12; implementation still NOT_RUN.
Impact: planning status only.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:32:55 +00:00
weichenandCursor 923537e9a1 Add svc unified deploy and one-time login key proposal r1
Why: capture the reviewed design for binary/source install, env prep,
and passwordless activation via one-time restricted sessions.
Evidence: SELF source review against Dev af9c2de; implementation NOT_RUN.
Impact: Documents planning index only; no runtime change.
Refs: docs/proposals/2026-10-12-svc-unified-deploy-and-login-key.md

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-12 03:28:37 +00:00