weichen
13fd7b3a55
Document the dual-tier storage
...
Details (original message):
Document the dual-tier storage, multitenancy, and scaling delivery (proposal, implementation record, test report, usage guide)
2026-09-30 02:39:50 +00:00
weichen
1683e17b20
Final 0.1.0 test report
...
Details (original message):
Final 0.1.0 test report: all 15 acceptance items achieved (squad engine integration, model-routing override chain, context observation); 44 automated tests + 15 live checks; refresh usage and implementation records.
2026-09-29 18:30:46 +00:00
weichen
d3a021391b
Update reports for the agent-intent gate integration: 36 automated tests
...
Details (original message):
Update reports for the agent-intent gate integration: 36 automated tests, 13 live checks, release sha a3128fe1.
2026-09-29 18:12:57 +00:00
weichen
196baf7c8c
Add the 0.1.0 usage report
...
Details (original message):
Add the 0.1.0 usage report, test report, plugin development guide, and P0-P5 implementation record; index the docs tree.
2026-09-29 18:07:44 +00:00
weichen
e13eb5c38e
R4: add the global native-deployment constraint
...
Details (original message):
R4: add the global native-deployment constraint (single static binary first, split native binaries only when necessary, no containers); storage becomes dual-profile (embedded SQLite default / optional native PostgreSQL); embed frontend via go:embed; native dev environment and release artifacts.
2026-09-29 17:26:34 +00:00
weichen
28278cd735
R3: add ingest parsing pipeline (MinerU as optional fallback/cross-check)
...
Details (original message):
R3: add ingest parsing pipeline (MinerU as optional fallback/cross-check), RAG retrieval, memory system designs; expand context management with budgeting; add model routing kinds for embedding/rerank.
2026-09-29 17:20:52 +00:00
weichen
8290cc6ef3
R2: defer domain plugins to the future roadmap
...
Details (original message):
R2: defer domain plugins to the future roadmap (fresh design, no legacy compat) and expand the skeleton extensibility and customizability design.
2026-09-29 17:16:29 +00:00
weichen
5b94550895
Add the system skeleton design, proposal, and phased implementation plan (pending review)
...
Details (original message):
Add the system skeleton design, proposal, and phased implementation plan (pending review).
2026-09-29 17:08:47 +00:00