Commit Graph
184 Commits
Author SHA1 Message Date
weichen c7cb2d8d89 Record U3 r0.3 combination and trial entry boundary
Why: Reviewers need the exact successful combination and a clear distinction between prepared evaluation code and paid authorization.

Evidence: Dev 6f91ca9 make test/build SELF receipt; Backend 5f83454 label regression RED→GREEN.

Impact: Documentation only; real-model quality remains NOT_RUN and six PRs stay drafts.

Refs: Dev task feature/fast-slow-u2-u3-plan; Documents PR #95
2026-10-13 18:00:26 +00:00
weichen b776fe1e4d Record accepted U3 code mechanism and remaining model gate
Why: Repeated independent semantic review required a conservative final source and analysis boundary.

Evidence: Backend 5f53f80 independent replay found no remaining Critical/Important; task-owned PostgreSQL and HTTP browser receipts identify separate fixed SHAs.

Impact: Code mechanism review is PASS, while real-model quality, exact Dev combination and platform gates remain pending.

Refs: Dev task feature/fast-slow-u2-u3-plan; Documents PR #95
2026-10-13 17:51:02 +00:00
weichen 53b1abdec8 Record independent U3 semantic findings and retests
Why: The first r0.3 code review found three unsafe inference paths despite green mechanism tests.

Evidence: Reviewer's read-only replay, Backend RED→GREEN counterexamples, isolated PostgreSQL and task-owned HTTP browser receipts are identified separately.

Impact: Keep the old review failure and new fix candidate traceable; real-model quality stays NOT_RUN.

Refs: Dev task feature/fast-slow-u2-u3-plan; Documents PR #95
2026-10-13 17:24:00 +00:00
weichen 21fbc9de34 Record U3 r0.3 zero-paid validation results
Why: The new evidence-bound checkpoint candidate needs a reviewable account of what the local and browser gates prove.

Evidence: Tool-imported Dev combination, isolated PostgreSQL and real HTTP fake-stream browser receipts; previous knip failure retained.

Impact: Documentation only; r0.2 model quality remains FAIL and r0.3 paid A01 remains NOT_RUN.

Refs: Dev task feature/fast-slow-u2-u3-plan; Documents PR #95
2026-10-13 17:05:00 +00:00
weichen f64fe11c55 Merge remote-tracking branch 'origin/main' into feature/fast-slow-u2-u3-plan 2026-10-13 16:29:25 +00:00
weichen 1f3bd54cfb Define the approved single-project rename projection boundary
Why: Preserve delegated project settings while keeping physical Host mutations owner-scoped.

Evidence: User explicitly approved the independently reviewed amendment and repair plan; original amendment digest recorded in the contract.

Impact: Clarify actual-actor authorization and audit, single-target owner projection, durable recovery and masked metadata; no provider implementation or deployment claim.

Refs: IAM I1 host projection amendment r1; Documents PR 98; Dev policy/delivery.md affected stages 4-5.
2026-10-13 16:04:31 +00:00
weichen 36ec4c1867 Record approval of the U3 r0.3 implementation plan
Why: The user approved zero-paid execution of the written plan.

Evidence: Approval response on 2026-10-13; git diff --cached --check passed.

Impact: Document status only; new paid A01 remains separately gated.

Refs: Documents PR #95; Dev task feature/fast-slow-u2-u3-plan
2026-10-13 15:57:32 +00:00
weichen 374ec45b72 Merge remote-tracking branch 'origin/main' into feature/fast-slow-u2-u3-plan 2026-10-13 15:49:25 +00:00
weichen ba9d76426d Identify the provider snapshot used by the IAM contract
Why: Avoid presenting an earlier extension surface as the current provider after main advances.

Evidence: Independent documentation review identified a non-blocking version attribution issue.

Impact: Attribute the existing-capability table to Backend 0f192a48; preserve contract semantics and approved plan digest.

Refs: IAM I1 stage 8 document review.
2026-10-13 15:37:31 +00:00
weichen 30bceb748f Align IAM contract navigation with accepted delivery stage
Why: Remove stale local-review and pending-acceptance statements after user confirmation.

Evidence: Independent stage 8 documentation review identified the status mismatch.

Impact: Update delivery status only; preserve permission semantics and the approved plan digest.

Refs: 2026-10-13 IAM I1 acceptance record; Dev policy/delivery.md.
2026-10-13 15:34:16 +00:00
weichen b4a2573742 Record user acceptance of IAM I1 validation
Why: Preserve the explicit stage 7 decision before formal review and integration.

Evidence: User confirmation in this session; document consistency receipt 17a3542f8e69fc899a05a152d258b721a8aaab4cd0a3629f8f5cbb7364d77d84 (SELF).

Impact: Record acceptance of the fixed I1 candidate and its stated limitations; leave the approved plan unchanged.

Refs: Dev policy/delivery.md stages 7-9; IAM I1 permission contract.
2026-10-13 15:30:37 +00:00
weichen 1f83bb7ffe Merge remote-tracking branch 'origin/main' into feature/iam-i1-permission-contract 2026-10-13 15:27:22 +00:00
weichen f608ae5b5b Document the U3 r0.3 evidence implementation plan
Why: The approved r0.3 design needs a reviewable implementation and validation path.

Evidence: Design approval recorded in the task conversation; plan self-reviewed against the spec and current Core/Backend interfaces; git diff --cached --check passed.

Impact: Documentation only; semantic code and paid model trials remain unapproved.

Refs: Dev task feature/fast-slow-u2-u3-plan; Documents PR #95
2026-10-13 15:19:38 +00:00
weichen 61bb93e813 Design evidence-backed U3 stage judgments
Why: The approved r0.2 A01 produced an unsupported set-membership claim despite an explicit prompt warning.

Evidence: Independent read-only replay of the fixed A01 result, source text, persisted checkpoints and final card; spec self-review and link checks.

Impact: Defines a conservative no-extra-model-call proposal for review, without authorizing semantic implementation or another paid sample.

Refs: U3 r0.2 A01 quality FAIL, user-approved r0.3 design direction
2026-10-13 15:04:15 +00:00
weichen 4971d0d13d Record durable A01 evidence archive
Why: The failed model sample must remain reviewable beyond the task-owned temporary directory.

Evidence: Eighteen copied files rehashed and checked at restrictive modes; protected route key was not copied.

Impact: The report points to a durable, access-restricted archive without upgrading the failed quality verdict.

Refs: U3 r0.2 A01 independent replay
2026-10-13 14:54:22 +00:00
weichen 064d4b5f68 Present the bounded I1 acceptance candidate and evidence gaps
Why: Stage 6 is approved and formal command/API results need a version-bound human acceptance decision.

Evidence: Complete SELF receipts and independent replays are linked to fixed Dev/RDM subjects; the original implementation approval is retained.

Impact: Record test coverage, predicate corrections, immutable product digests and explicitly untested later scopes. Do not mark user acceptance or shipping complete.

Refs: IAM I1 U1-U2; phase 7 acceptance
2026-10-13 14:52:43 +00:00
weichen 6d90860a83 Record the failed r0.2 A01 model acceptance
Why: The one authorized trial produced useful stages and a final answer but also an unsupported phase-membership claim.

Evidence: Fixed SQLite, provider and result hashes; tool-imported SELF receipts; independent read-only source-by-source replay.

Impact: Keep U3 quality FAIL, six PRs draft and the new diagnostic fix separate from the paid sample.

Refs: U3 quality implementation plan r0.2, Task 6
2026-10-13 14:45:56 +00:00
weichen 2d5398e988 Record user approval of the I1 implementation
Why: The user approved the previously delivered local implementation and compatibility effects.

Evidence: This chat reply says approval; its objects remain c023551 Documents, b93908e RDM and 72ed8b4 Dev. Execution receipts are separate from this human decision.

Impact: Stage 6 passes and planned stage 7 begins; acceptance, shipping, later increments and production operations are not approved by substitution.

Refs: I1 implementation review on 2026-10-13
2026-10-13 14:31:56 +00:00
weichen 8375057829 Merge commit '047d362c72ec2c095ec14e1d2f2d152f94471faf' into feature/iam-i1-permission-contract 2026-10-13 14:21:43 +00:00
weichen 32d6c8487a Merge the authoritative document baseline before delivery
Why: The process-document main branch advanced with project membership and privacy records after this implementation plan was reviewed.

Evidence: origin/main was freshly fetched; the reviewed plan remains the same and the final combined document checks will be replayed on the resulting head.

Impact: Preserve the other task's proposal and index entries alongside the approved merge queue plan, without changing its scope or execution authorization.

Refs: Documents PR #96; origin/main 047d362; independent review docs_delivery_review
2026-10-13 14:20:31 +00:00
weichen 6c096b9360 Record project event privacy and duty replay refinements
Why: Legacy upload events and synced duty flows need the same private-data and current-state guarantees as new member work.

Evidence: Real legacy SSE leakage and independent duty replay findings; correction evidence remains in the canonical task record.

Impact: Describe trusted per-event sharing and durable duty versions without new mandatory downstream interfaces or runtime changes.

Refs: system-project-membership r1.1; Dev feature/project-member-access
2026-10-13 11:06:42 +00:00
weichen 1a1c888229 Record independent U3 review fixes and replay
Why: The final zero-paid candidate incorporates three review findings and fresh browser/PostgreSQL evidence.

Evidence: Backend RED-to-GREEN regressions; task-card SELF receipts for HTTP/browser and isolated PostgreSQL reruns.

Impact: Real-model quality remains NOT_RUN and still blocks merge.

Refs: U3 quality revision r0.2
2026-10-13 10:53:58 +00:00
weichen c023551f2a Record verified I1 local checks and pending human review
Why: Separate observed local implementation and test results from formal acceptance, CI and deployment.

Evidence: Complete SELF outputs and fixed subjects are in the owning Dev and RDM task cards; independent preliminary review passed on dfb9c407.

Impact: Update review progress and explicit follow-up boundaries only; preserve approved plan and permission contract.

Refs: IAM I1 U1-U2
2026-10-13 10:46:39 +00:00
weichen b8fcf01062 Record the I1 local implementation candidate and review boundaries
Why: The approved plan needs traceable local progress and explicit capability limitations before human implementation review.

Evidence: The owning task cards retain full local SELF startup, sync, red and green outputs; final combination checks and independent review are pending in this checkpoint.

Impact: Preserve the original approved plan and identify I1 behavior, deferred capabilities and the next separately authorized unit.

Refs: IAM plan r1; I1 U1-U2
2026-10-13 10:39:21 +00:00
weichen 4a70ba8d57 Record full U3 composition and isolated PostgreSQL evidence
Why: The merged candidate now has complete local combination and task-owned PostgreSQL results.

Evidence: Imported SELF receipts for make test && make build and Backend runmgr/cardsvc/store on isolated PostgreSQL.

Impact: The report keeps final exact-head and model acceptance gates pending for the next candidate SHA.

Refs: U3 quality revision r0.2
2026-10-13 10:38:26 +00:00
weichen 2fdda63406 Record the merged U3 browser mechanism replay
Why: The resolved cross-component candidate now has actual HTTP/browser evidence and one diagnosed fixture failure.

Evidence: Task-card SELF sync and browser receipts, including manifest verification and two passing Playwright cases.

Impact: The report keeps model quality NOT_RUN for r0.2 and the older paid failure unchanged.

Refs: U3 quality revision r0.2
2026-10-13 10:31:38 +00:00
weichen f1a44fdac6 Clarify the implementation plan observations as their authoring baseline
Why: Historical observations in the approved plan used current-tense wording after implementation advanced, making the progress pointer harder to interpret.

Evidence: Independent documentation review identified the wording; the diff changes only baseline time and references current task/PR evidence. Document replay follows on the new candidate.

Impact: No change to approved units, interfaces, authorization or acceptance criteria; actual progress remains in the task and fixed-candidate records.

Refs: Documentation review Minor finding; approved plan ba4044d; U1-U6
2026-10-13 10:30:39 +00:00
weichen b91e298c15 Clarify fail-closed I1 host capability boundaries
Why: Existing public host contracts cannot prove source ownership, scoped revocation or private artifact filtering.

Evidence: The I1 documentation consistency checker preserves the approved plan digest and fixed RDM core rules; behavior verification is recorded in the owning task.

Impact: Record conservative I1 defaults and explicit follow-up provider requirements without adding public implementations.

Refs: IAM plan r1, I1 U1-U2
2026-10-13 10:27:09 +00:00
weichen 72e11c5eb8 Record approved U3 revision and zero-paid evidence
Why: The design and implementation plan were approved while the previous report still described them as pending.

Evidence: git diff --check; Backend, UI and affected Frontend tests recorded as SELF with their component SHAs.

Impact: The report distinguishes the new mechanism candidate from the failed paid v7 sample and keeps model QA NOT_RUN.

Refs: U3 quality revision r0.2
2026-10-13 10:17:03 +00:00
weichen 61e0aef39c Specify system project membership and shared knowledge boundaries
Why: Joined members must see one globally named project and keep private conversations and source documents.\n\nEvidence: Proposal links the fixed implementation plan, explicit authorization and task evidence without claiming deployment or CI success.\n\nImpact: Define optional lifecycle extension, identity recovery, private reads and published knowledge for U2/U3/U5.\n\nRefs: Dev feature/project-member-access
2026-10-13 09:56:06 +00:00
weichen 76651f6798 Keep the mechanism fixture aligned with source-once input
Why: The existing browser fixture parses the trailing source index that the approved source-once layout removes.

Evidence: A zero-paid parser probe matched the old format and rejected the planned inline format; the plan now owns a failing fixture test and adaptation.

Impact: Preserve real HTTP browser coverage without changing product contracts or model acceptance.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 09:33:43 +00:00
weichen 2cc00da9e0 Define the I1 permission and public extension contract
Why: separate protected system actions from project authority and freeze the approved identity and resource boundaries.

Evidence: SELF document check recorded by Dev evidence; approved plan digest retained and fixed-base core rules preserved.

Impact: contract and navigation only; provider implementations, multi-role migration and deployment remain later increments.

Refs: IAM plan r1 U1; Agent-System-Dev feature/iam-i1-permission-boundaries
2026-10-13 09:30:34 +00:00
weichen 0827b81026 Align final-reserve accounting with provider usage
Why: A provider may report prompt and completion tokens while leaving totalTokens zero; the reserve must not treat that usage as free.

Evidence: Existing budgetedStream falls back to prompt plus completion, while subRun usage accounting currently does not; the plan adds a focused regression.

Impact: Clarify the reviewed implementation scope without changing product code or authorizing a model sample.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 09:27:59 +00:00
weichen 3bb02a119b Guard final-only continuation in the U3 plan
Why: Hiding a tool declaration alone does not prevent a model from calling a tool already in the runtime registry.

Evidence: The agent-native loop continues after tool errors; the plan now requires a local stop latch before any later provider call.

Impact: Clarify the zero-paid test and implementation boundary without changing the approved design or authorizing model usage.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 09:21:29 +00:00
weichen dfe99d530e Plan the U3 quality revision implementation
Why: The approved written design needs testable work items before changing model behavior or spending another sample.

Evidence: The plan maps all three design duties to existing code seams, RED-to-GREEN checks, a fixed combination gate and a separately authorized real-model exit.

Impact: Record stage-five review material without modifying product code, using paid models, or opening merge gates.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 09:17:49 +00:00
weichen a088809dc8 Preserve the approved identity and permission plan
Why: provide the approved contract for the I1 implementation without altering its accepted content.

Evidence: SELF source artifact SHA-256 39b8e9a6e078dc509bd80118c1807ce6ed23e4466e5902b51f4bfa255d55c0a1; user approved the plan and authorized U1-U2.

Impact: documentation checkpoint only; no production code or runtime changes.

Refs: Agent-System-Dev feature/iam-i1-permission-boundaries
2026-10-13 09:08:51 +00:00
weichen 407e49d2ba Remove trailing blank lines from merge queue candidate documents
Why: Validation of the complete candidate against origin/main detected added blank lines at the end of the authored documents.

Evidence: git diff --check origin/main validates the final candidate format; unchanged semantic content remains covered by the approved specification and implementation plan.

Impact: Document whitespace only; no version obligations, execution mode or authorization change.

Refs: Merge queue implementation plan U4; formal document validation
2026-10-13 08:59:34 +00:00
weichen 67e924041e Draft the U3 quality revision design
Why: The approved model samples showed unsupported approval claims, repeated source input and no final answer before the run budget stopped.

Evidence: The design cites the preserved A01 provider usage, persisted findings and independent sample audit without claiming new model validation.

Impact: Define a reviewable source, claim and final-reserve revision while keeping code, paid trials and merge gated.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 08:51:35 +00:00
weichen 652be93a60 Record plan approval and link implementation evidence
Why: preserve the approved plan and point readers to the actual task objects instead of treating historical planning state as current delivery status.

Evidence: user approval of plan r1 and Dev task-card receipts; actual platform activation and real trial remain NOT_RUN.

Impact: plan metadata, test-file organization and navigation only; task state remains authoritative in Dev.

Refs: docs/proposals/2026-10-13-merge-queue-implementation-plan.md; Dev .task/feature-merge-queue-policy-draft.md
2026-10-13 08:22:35 +00:00
weichen 9cdb14010c Disclose the A01 stop-rule deviation
Why: The controlled trial made one more paid provider request after rejecting a nonliteral quote.

Evidence: Independent transcript audit found a 14231-token continuation within the same child run; original receipts and failed quality verdict remain intact.

Impact: Make the authorization deviation explicit and reference a zero-paid prevention guard; no additional model run is authorized.

Refs: Agent-System-Documents#95; Agent-System-Backend#193; Agent-System-Dev#512
2026-10-13 08:02:43 +00:00
weichen f7a68e5882 Record the failed bounded A01 follow-up
Why: The approved v7 sample saved two checkpoints but still missed semantic and final-result acceptance.

Evidence: Independent DB replay, provider usage reconciliation, source checks and the original failed evaluation receipt.

Impact: Preserve the exhausted one-shot boundary and keep all draft PRs unmerged.

Refs: Agent-System-Documents#95; Agent-System-Dev#512
2026-10-13 07:42:45 +00:00
weichen fb06fccfa2 Prepare a bounded review proposal after failed checkpoint delivery
Why: The approved extra sample ended with no valid saved findings and exhausted its per-run token threshold.

Evidence: Provider responses, strict-source rejections, Usage and independent analysis are retained; v7 has only local checks.

Impact: Define a separately approvable two-run 30000-token-per-run experiment without altering original acceptance rules or claiming model success.

Refs: Approved U2/U3 plan r0.1; independent extra A01 assessment
2026-10-13 06:50:16 +00:00
weichen ba4044d57e Plan serial delivery windows and compatible task recovery
Why: turn the confirmed scheduling specification into sequenced work with explicit interfaces, evidence handling and admission validation.

Evidence: SELF plan checks verified fixed source commits, 83 relative links, six units and four Python example blocks; implementation and runtime checks remain NOT_RUN.

Impact: reviewable implementation plan and navigation only; no task scripts, workflow, platform settings or business behavior are implemented.

Refs: docs/proposals/2026-10-13-merge-queue-implementation-plan.md; Dev policy/merge-queue.md r1; Development-Guidelines draft.11
2026-10-13 06:40:14 +00:00
weichen 4b20983ccd Update plan entry points and archive current verification
Why: The project and proposal indexes still said no U2/U3 implementation or experiment existed.

Evidence: Current combination, full PG backend, two HTTP browser cases and independent code review are linked with their actual statuses.

Impact: Documentation only; real-model acceptance is explicitly failed and no release is claimed.

Refs: Approved U2/U3 task card and validation report
2026-10-13 06:34:34 +00:00
weichen dd3b9da619 Archive current verification and the failed extra A01 assessment
Why: Keep the latest merged candidate reviewable without turning failed model findings into a release claim.

Evidence: Exact d06792c composition, two current browser cases and independent model review are linked and source-labeled.

Impact: Documentation only; model quality gate and merge remain closed.

Refs: Approved U2/U3 task card
2026-10-13 06:23:53 +00:00
weichen 1b296a1773 Record the failed approved A01 replay and next acceptance conditions
Why: The model produced no admissible findings, so release and further paid work remain gated.

Evidence: Original provider calls, 42203 tokens, independent SQLite replay and strict source rejection are linked from the validation report.

Impact: Correct planning status and recommend a bounded lower-complexity test design for separate approval.

Refs: Approved U2/U3 plan r0.1; extra A01 user approval 2026-10-13
2026-10-13 06:13:39 +00:00
weichen 7fe00e052f Merge current planning records before U2/U3 review
Why: Preserve other approved planning records and index updates.

Evidence: Exact current main fetched; no overlapping source behavior.

Impact: Retain both planning histories.

Refs: Agent-System-Dev U2/U3 delivery
2026-10-13 05:28:02 +00:00
weichen 0e9c6710e4 Archive the final code review and fixed combination evidence
Why: Make the current corrected candidate reviewable while preserving the failed model acceptance boundary.

Evidence: Native SELF receipt for exact source composition 7fd5288 is green; independent reviewer verifies Backend 6a2d85c and all fixed regressions.

Impact: Documentation only; the six failed or limited model samples remain unchanged and no merge or deployment is claimed.

Refs: Approved U2/U3 plan; pending explicit extra A01 test authorization
2026-10-13 04:45:51 +00:00
weichen 53a7d37e6c Record implemented work checkpoints and the pending model acceptance gate
Why: Planning-only status no longer matches the candidate, while failed model samples must remain explicit.

Evidence: Native SELF receipts and independent REPLAY reports distinguish code checks, six model cases and the failed quality/fidelity boundaries; relative links verified.

Impact: Update only this approved U2/U3 planning record and validation report; CI, merge, deployment and an extra sample remain pending.

Refs: User confirmation 2026-10-13; Dev feature-fast-slow-u2-u3-plan
2026-10-13 04:31:50 +00:00
weichen 0b290b7461 Record the login recovery implementation as proposal r3
Why: The 2026-10-13 login recovery flow was approved and merged
(Backend #187, Frontend #76, Dev #504); the master proposal must carry
the three adjudications, implementation record, and evidence pointers
per the repo's lineage conventions.

Evidence: Dev #504 HEAD CI (test/test-pg/svc-realcombo) success; browser
acceptance receipts be7ae9a2/b3a9e691 bound to Dev HEAD 268ef29 (SELF).

Impact: r3 is an implementation record only; R/KTD/U numbering semantics
unchanged; U7 explicitly NOT marked complete (atomic bootstrap and CLI
credential delivery remain). INDEX.md status line updated.

Refs: Dev docs/svc-deploy/2026-10-13-login-recovery-contract.md
2026-10-13 04:30:04 +00:00