Commit Graph
103 Commits
Author SHA1 Message Date
weichen da59ccff04 Track the merged svc-autorecover outcome in the review record and index
Why: between the review round and the approval decision another session completed and merged svc-autorecover (PR #396/#400/#401/#402), so the (a)-decision tracking must reflect the landed slice and the remaining U2 delta.

Evidence: SELF - merged main history c622372 and archived card .task/archive/feature-svc-autorecover.md (10/10 tests, 146/146 governance, CI green on e0b49d1).

Impact: review record, INDEX; proposal r2 body unchanged.

Refs: PR #396 #401
2026-10-12 01:29:31 +00:00
weichen 5a807933c2 Record the r2 approval and the svc-autorecover vehicle decision
Why: the human gate resolved on 2026-10-12 - r2 approved (five stages at once) and option (a) adopted; the review record, proposal index and status navigation must reflect it.

Evidence: SELF - user decision relayed in conversation; stage-review details in the Dev task card; proposal r2 body unchanged (SHA256 9cfda252...).

Impact: review record, INDEX entry; no plan content change.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-12 01:26:50 +00:00
weichen 71cd9d1db2 Record the post-sync drift check and svc-autorecover in-flight findings in the review record
Why: the reviewer record must reflect that all r2 gap claims hold at the post-sync backend pin 25fbea85, and that the svc-autorecover ownership decision now has 373 lines of unregistered, partially failing in-flight work to weigh.

Evidence: SELF - drift-check receipt in the Dev task card (exit 0, all cited gaps hold); svc-autorecover suite observed 5 of 10 tests failing on 2026-10-11.

Impact: review record addendum only; proposal r2 (SHA256 9cfda252...) unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:51:54 +00:00
weichen cbc64eb8ab Revise the recovery proposal to r2 with external review findings
Why: absorb the external source-review round - pin the shutdown budget change, close the U1 acceptance gap for program/cwd changes, gate U4 public states on a mapping table, and make the svc-autorecover coordination an explicit human decision.

Evidence: SELF - external review round 2 in the review record; r2 SHA256 9cfda2520b913e6966c68fb3f66fb7bc8382a8f7a2b69cb364122216dcdb72cd; all reviewed claims re-verified against the pinned baselines.

Impact: documents only; four targeted amendments (U1/U3/U4/section 9) plus version bump and INDEX update; requirements and metrics unchanged.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:45:09 +00:00
weichen 54fc24e4d5 Add the service restart and recovery proposal r1 with review record
Why: pin the reviewed candidate as a fixed git object before human review (external review P1.1); untracked drafts made check-evidence report unverified.

Evidence: SELF - proposal SHA256 cfc9b768a4596a268810e20101cddc2a6040e24a640e6e34dbda17b838cd45ed matches the review record; source baseline Dev 5e57029b, Backend eb12f102, Core 89f3906c, Frontend aaced879, Documents 23e2276.

Impact: documents repo only; adds proposal r1, six-lens review record and INDEX entry; no implementation, NOT_RUN statuses preserved.

Refs: Dev task card .task/feature-service-restart-recovery-plan.md
2026-10-11 16:42:23 +00:00
weichen 2085447701 Record U5 progress and mark U1-U5 implementation complete in the master plan
Why: U5 landed via RDM PR #213 (merge 1dce69d); all five implementation units now complete.

Evidence: RDM PR #213 merged=True.

Impact: plan status + U5 progress + INDEX.

Refs: RDM PR #213
2026-10-11 15:57:13 +00:00
weichen 895a7204b9 Record U4 progress in the two-trees master plan and index
Why: U4 landed via Dev PR #368 (merge 7aa8fd9).

Evidence: Dev PR #368 merged; CI green.

Impact: status line + U4 progress + INDEX only.

Refs: Dev PR #368
2026-10-11 15:07:53 +00:00
weichen b6b6059222 Record the user ruling to gate U6 on owner experience
Why: The U6 precondition (benefit evidence from U4/U5) resolves to the
owner actually using the landed U1-U5 capability - the human usability
comparison marked NOT_RUN since U1 finds its execution path here; the
user ruled 2026-10-11 to evaluate first and decide U6 after.

Evidence: Ruling collected via the session question panel on
2026-10-11; U1-U5 all merged (Dev #329/#336/#345/#351/#367).

Impact: Documents-only (master record U6 gate note + index status).

Refs: r2 U6 clause; Dev task feature/generative-ui-u6-gate-record
EOF
)
2026-10-11 15:01:08 +00:00
weichen aba1d6a3d6 Record the user approval of the U5 action scope
Why: The user ruled on the three questions (categories and ranges
approved as proposed; C-class limited to plugin KV plus task ledger;
confirm UX reuses the inline card); the proposal becomes the approved
scope and unblocks the U5 implementation task.

Evidence: Ruling collected via the session question panel on
2026-10-11; implementation task feature/generative-ui-u5 starts under
policy/delivery.md.

Impact: Documents-only (proposal r2 + index status).

Refs: r2 master record U5; Dev task feature/generative-ui-u5
EOF
)
2026-10-11 14:09:20 +00:00
weichen c7c5f94b64 Propose the U5 action scope for user review
Why: The r2 U5 clause requires a human review of the action scope
before implementation; this draft grounds the decision in the current
command inventory and existing safety machinery.

Evidence: Source facts cited inline (builtin command list with risk
levels, DangerHigh inline-confirm flow with pendingStore, audit
envelope) verified against backend main on 2026-10-11.

Impact: Documents-only (new proposal + index entry); no code changes.

Refs: 2026-10-10-generative-ui-plugin.md (r2 U5); Dev task
feature/generative-ui-u5-scope
2026-10-11 13:50:10 +00:00
weichen a8f1096e78 Record U3 progress in the two-trees master plan and index
Why: U3 landed via RDM PR #201 (merge dbc41b6); the master record must reflect actual progress.

Evidence: SELF U3 closeout doc check exit 0 (receipt in Dev closeout task card).

Impact: proposal status line, U3 progress paragraph, INDEX row only.

Refs: RDM PR #201; Dev feature/rdm-u3-closeout
2026-10-11 13:40:12 +00:00
weichen 9cb09b967c Merge the template/final-target planning branch into main lineage
Why: Dev PR #340 pinned this Documents branch tip while it was never merged into Documents main (cross-repo pin discipline); this reconciliation unifies both planning lineages.

Evidence: merge-base 2a5f658; INDEX conflict resolved as union (U1+U2 progress row + two new plan entries).

Impact: docs only.

Refs: Dev #340
2026-10-11 13:10:38 +00:00
weichen 1673f3cea6 Record U2 progress in the two-trees master plan and index
Why: U2 landed via RDM PR #197 (merge fe8a75b); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF U2 closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #197 merged=True via API.

Impact: proposal status line, U2 progress paragraph, and INDEX row only.

Refs: RDM PR #197; Dev feature/rdm-u2-closeout
2026-10-11 11:22:59 +00:00
weichen 10b0dbe908 Merge the current Documents baseline and preserve both planning entries
Why: retain the newly merged RDM U1 progress alongside the final-target plan.

Evidence: resolved the single index conflict by keeping the updated U1 entry and both new plan links; diff check passed.

Impact: documentation merge only; business validation NOT_RUN.

Refs: docs/proposals/INDEX.md
2026-10-11 08:54:39 +00:00
weichen 6183e99cdb Plan full RDM delivery around shared projects and controlled documents
Why: reconcile the confirmed project, privacy and duty rules with all approved product requirements.

Evidence: current RDM d8d7e743 source review, recorded source receipt, and exact 34 UR/68 SR/10 F matrix checks; business validation NOT_RUN.

Impact: reviewed planning documents only, covering all 69 template types and the existing XLSX asset; no runtime changes.

Refs: docs/proposals/2026-10-11-rdm-final-target-completion.md
2026-10-11 08:54:07 +00:00
weichen 6efdd7dbc7 Record U1 progress in the two-trees master plan and index
Why: U1 landed via RDM PR #195 (merge 05b7d1a); delivery policy requires the master record to reflect actual progress at task completion.

Evidence: SELF closeout doc check exit 0 (receipt in the Dev closeout task card); RDM PR #195 merged=True via API.

Impact: proposal status line, U1 progress paragraph, and INDEX row only; no scope or requirement change.

Refs: RDM PR #195; Dev feature/rdm-u1-closeout
2026-10-11 08:44:18 +00:00
weichen 90f73ba4e8 Record the confirmed pilot documents and full-catalog direction
Why: preserve the user decision from the previous planning turn before expanding scope.

Evidence: r1.1 records the explicit user response; prior documentation-check receipt is in the Dev task card.

Impact: planning metadata only; no business changes.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:39:47 +00:00
weichen ca9b128f18 Document the storage-migrate tool and the switch/drill runbook (U4)
Why: U4 ships the managed migration entry; the runbook is the operator-facing contract for inventory/backup/migrate, migration identity and resume rules, verification semantics, and the authorized-window switch sequence.

Evidence: backend branch feature/collab-storage-u4-migrator - integration tests green against real PostgreSQL (idempotent rerun, resume, foreign-data refusal, wrong-snapshot refusal, unknown-owner block).

Impact: docs only.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md U4 and section 6.
2026-10-11 08:29:38 +00:00
weichen db6daafde4 Plan template-driven document generation through project conversations
Why: connect the existing RDM assets and two-trees model to a reviewable document workflow.

Evidence: source inventory at RDM 0081628a; document structure and local link checks recorded as SELF in the Dev task card; business validation NOT_RUN.

Impact: planning and inventory documents only; no implementation or deployment.

Refs: docs/proposals/2026-10-11-rdm-template-dialog-generation.md
2026-10-11 08:23:53 +00:00
weichen 0be6c2d3ee Document the execution budget settings and the KTD13 action-authz compat plan
Why: U3 slice 2 ships admission budgets (runtime.* keys, lease semantics, yield/reacquire) and the host-side action matrix; the runbook is the single source for operators and records the versioned public-contract plan KTD13 requires.

Evidence: backend branch feature/collab-storage-u3-budget-authz (admission.go, action matrix in server.go) with admission/matrix tests green.

Impact: docs only.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md KTD13/R8, section 5 U3.
2026-10-11 05:15:49 +00:00
weichen 76f49b2bc7 Merge authoritative main into the task branch
Why: branch protection requires the head to contain the current base before merge.

Evidence: fetched origin/main=336a90f0ade0ffe049879ca5159a61f0a3948708.

Impact: integrate upstream changes without rewriting task history.

Refs: Documents PR #63
2026-10-11 04:43:23 +00:00
weichen 474955b64d Revise the Generative UI proposal to r2 with the U1 trial results
Why: The U1 controlled trial (three arms on synthetic materials,
MiniMax M3 + M2.7-highspeed, CNY 3 spent of the 200 cap) finished on
2026-10-11; its evidence changes the plan and must live in the master
record: goal-driven structure divergence holds (6/6), generation must
go through tool arguments (text-channel JSON discipline is the floor),
highspeed is rejected as the generator, and the first release keeps the
in-house renderer.

Evidence: Full data and failure taxonomy in Dev task
feature/generative-ui-u1 (.task/genui-u1/report.md, SELF; CI gate on
the Dev PR). Tool-channel and response_format probes recorded there.

Impact: Proposal r1 -> r2 (new results section, catalog/model/channel
revisions); INDEX entry updated. No code or contract changes.

Refs: Dev task feature/generative-ui-u1; Documents PR #60 (r1)
2026-10-11 04:42:37 +00:00
weichen b857595025 Publish the approved two-trees traceability plan r1 with user rulings
Why: the user reviewed and approved the plan (2026-10-11, five stages bundled) and chose a two-tier admin model for KTD4 instead of strict ledger separation.

Evidence: SELF user session rulings recorded in the Dev task card; document-check receipt follows in the task card evidence section.

Impact: proposal r1 and INDEX now record approval and the two-tier admin ruling; no code or deployment change.

Refs: Dev feature/rdm-two-trees-audit-plan
2026-10-11 04:41:29 +00:00
weichen b3171b3d51 Plan RDM project traceability and audit integration
Why: assess existing two-tree and trace-network capabilities and define project-scoped inspection.

Evidence: SELF source receipt and document checks; business and runtime verification were not run.

Impact: pending-review proposal and index only; no product implementation or deployment.

Refs: Dev feature/rdm-two-trees-audit-plan
2026-10-11 04:02:38 +00:00
weichen a47ef7ffcf Merge authoritative main into the task branch 2026-10-11 03:14:06 +00:00
weichen 4ca58c3d8a Add the team-storage runbook for U1 and cross-link usage
Why: the approved collaboration plan U1 requires a fixed deployment manifest, tier config contract, migration mapping, capacity contract, isolation test scheme and KTD14 copy-protection contract as the single source of truth for team-tier operations.

Evidence: contract keys match backend config.go tier/pool fields (U2, backend branch feature/collab-storage-pg-tier); local verification used svc.sh collabtest on 127.0.0.1:8897 and Redis on 6399.

Impact: docs only (new guide + usage.md cross-links); no code change.

Refs: proposals/2026-10-11-collaboration-storage-and-distribution.md sections 5 (U1/U2), KTD1/KTD8/KTD12/KTD14.
2026-10-11 03:10:45 +00:00
weichen 95a7c111d5 Add the Generative UI research and plugin proposal r1 with user rulings
Why: The user ruled on 2026-10-11 the three open product choices (first
pilot = full analysis page inside the conversation; enable/disable via a
trusted compiled plugin; U1 trial on MiniMax M3 + M2.7-highspeed with
sanitized materials and a CNY 200 cap), so the proposal now publishes as
the direction's master record instead of a local draft.

Evidence: Doc self-check receipts live in the Dev task card
feature/generative-ui-research; the rulings are recorded in the doc's
"用户裁定记录" section and mirrored in INDEX.md.

Impact: Documents-only change (new proposal + index entry). No runtime,
contract, or code changes; U1 trial start and deployment stay separately
reviewed.

Refs: Dev task feature/generative-ui-research
2026-10-11 03:10:16 +00:00
weichen 228cf74468 Merge authoritative main into the task branch 2026-10-11 02:40:54 +00:00
weichen 0f5df5147e Add the approved collaboration storage and distribution plan r1
Why: freeze the direction for 10-100 user multi-project collaboration storage (PostgreSQL team tier, migration, staged multi-instance) before U1+U2 implementation starts.

Evidence: static review record and SELF audit receipt included; user approval recorded in Dev task card 2026-10-11 (instruction to start the transformation per the plan).

Impact: docs only - new proposal, index entry, review record, audit receipt; no code or runtime change.

Refs: Dev .task/feature-collaboration-storage-plan.md; plan section 5 names U1+U2 as the first increment.
2026-10-11 02:40:02 +00:00
weichen 4a3ca0eb5a Backfill the S0-1 completion in the plan and index 2026-10-11 02:29:16 +00:00
weichen cc54cdac76 Backfill the E4 completion in the plan and index 2026-10-11 01:34:07 +00:00
weichen 077ebdf184 Backfill the E5 MiniMax-family A/B result in the plan and index 2026-10-10 17:27:25 +00:00
weichen 19b77a28bc Backfill the E3 completion in the plan and index 2026-10-10 16:39:02 +00:00
weichen 352b7aa540 Backfill the E1 completion status in the index row too 2026-10-10 09:47:50 +00:00
weichen a379a9fbe6 Backfill the E1 increment completion in the plan and index
Why: The E1 quick-fix increment landed (delegate full text, MiniMax
reasoning split, sandbox deps layer, parallel tool execution with kernel
ordering) and the proposal is the master record, so its stage table and
the index row must reflect the actual progress with links.

Evidence: Agent-Native #42/#43/#44, Backend #127, Dev task
feature/agent-e1-parallel-fixes (live verification receipts: F2 zero
think-leak, F3 sandbox IMPORTS-OK, F5 concurrent overlap; eval
toolFailures 19->11, unverifiedFacts 7->12 recorded honestly).

Impact: Documents-only progress backfill; E2-E5/S0 remain unauthorized.
2026-10-10 09:47:25 +00:00
weichen 3947a12700 Propose the delegation, model-routing and task-sandbox plan
Why: The user asked for a researched design covering subagent use,
tiered model routing (Claude via dmxapi for complex work, MiniMax for
the rest), a millisecond/sub-second task sandbox (record-only), and a
verdict on why the agent still feels weaker than codex/claude-code/kimi.
Why: Four research threads (external frontier survey, subagent/routing
evidence, harness-vs-model attribution, local code audit and probes)
converge on role/stage routing instead of whole-task routing, and on
three corrections to the sandbox assumptions (overlay is not a snapshot;
snapshots defer conflicts to merge time; destroy must follow sealing).

Evidence: Local measurements are SELF receipts in the Dev task card
(bwrap namespace ~7ms, overlay same, docker ~142ms; MiniMax reasoning
split; dmxapi /v1/messages cache_read; EXT-16 sandbox missing the
python-docx layer). External claims carry per-item source URLs in the
proposal's section 8.

Impact: Documents-only addition: new proposal 2026-10-10 (E1-E5/S0
increments, D/R workstreams, sandbox tiers L0-L2) plus INDEX rows for it
and the previously unlisted G1 package. No product code changes; all
implementation increments stay unauthorized until approved.

Refs: proposals/2026-10-09-agent-quality-improvement-plan.md (P4/P5,
model A/B), 2026-10-09-ext-g1-b1-b3-exec-backend.md (EXT-16),
Dev task feature/agent-exec-routing-sandbox-plan.
2026-10-10 07:39:56 +00:00
weichen 1f8ad3b99b Propose the G1 extension package: shared in-run retrieval, commands-as-tools, shared project list, exec backend
Why: RDM G1/G2 are blocked on four base capabilities - the member agent
cannot see published project knowledge inside a run, plugin commands are
unreachable as tools, members cannot see or open conversations in shared
projects, and the isolated exec tier needs a backend seam.
Evidence: SELF - code citations verified at Dev main (runmgr.go:726-736
owner-only Retrieve; hostcaps.go:64-66 owner-only search; server.go:438-441
owner-only listProjects; store/projects.go:124-130 owner-scoped conversation
creation); bwrap availability tested on this host (2026-10-09).
Impact: Docs only. New proposal docs/proposals/2026-10-09-ext-g1-b1-b3-exec-backend.md
registering EXT-13..EXT-16 per the compat-policy template; no code change.
Refs: RDM plan V1.1 sections 3.3/3.4/5.3; owner Q1-Q8 (Q4=option A, Q2)
2026-10-09 14:49:56 +00:00
weichen 238f90e92a Record the agent quality improvement plan and its six user rulings
Why: The 2026-10-09 diagnosis on real run transcripts identified the direct
conversation path's failure chain and a phased plan was approved with six
explicit user rulings (open up tools, kernel-transcript-authoritative context,
markdown-source deliverables with all file types retained, gate demotions,
uncapped stronger-model evals, real-model eval required for behavior changes).
The plan needs a durable main record per the long-term-direction policy, and
the 2026-09-30 preview proposal's "fs tools hidden by default" ruling is
superseded by ruling 1, which must be discoverable from the index.

Evidence: SELF - the record cites the diagnosis session, the transcript
sources (pg1 + legacy SQLite, 62 assistant turns) and the before-baseline
report location on the task card; no code or pointers changed in this repo.

Impact: New proposal 2026-10-09-agent-quality-improvement-plan.md plus one
index row. Subsequent phase tasks reference this record instead of restating
the plan.

Refs: Dev task feature/agent-quality-phase01; supersedes the fs-tool default
in 2026-09-30-file-preview-and-reserved-capabilities.md §2.3.
2026-10-09 12:42:33 +00:00
weichen 176db44c4b Record the v0.2.0 base release scope and owner tag steps
Why: v0.2.0 is the hard prerequisite for RDM shared work, and the release
checklist referenced a stale SurfaceVersion and tag message.
Evidence: SELF - scope lines are tied to merged Backend PRs (#66-#110);
Backend #110 CI success; UI composite run 1369 shows 14 files/103 tests.
Impact: Adds docs/records/2026-10-09-base-v0.2.0-release.md and points the
compat policy and the EXT-1 proposal at the actual 2.5.0-experimental line.
Tag creation and push stay with the owner (dual-key rule).
Refs: Dev feature/base-v020-release; Backend #110
2026-10-09 10:44:33 +00:00
weichen 9995552152 Propose the C1-C7 base extension package for RDM shared contracts
Why: U0 (merged in RDM) rules that domain logic stays downstream and the base needs seven minimal generic capabilities; the formal four-element applications are the only legal path to base changes.
Evidence: All current-state citations re-verified at Dev 34a2bbe (backend fe7c245); RDM requirement source pinned at RDM main ca72cfc.
Impact: New proposal doc + one INDEX row; no code, no surface change in this PR.
Refs: RDM U0 proposal section 5 / ruling D1; extension-compat-policy; phase-plan section 3.3.
2026-10-08 14:44:56 +00:00
weichen 4ce8155161 Expand guides with worked examples for intents, runs, and squads
Why: 补充实例让导览可对照实操:意图打分/填槽/多意图裁决给出
intentctl explain 实测轨迹(含样例意图、歧义、优先级 tie-break、
能力目录),任务执行给出工具清单与典型回合走查(含 ClaimGate
三类拦截),小队给出 agent-squad demo 全流程实测与真实工作区
目录树/TASK.md 实拍;并修正事实:默认意图目录为空、插件 overlay
与 registry loader 两种文件形态不同。

Evidence: intentctl explain/catalog 与 agent-squad demo 为 2026-10-08
本地实测输出(命令见各节);锚点仍为 Dev R0 218fc4b1;git diff
--check 通过;五篇互链全部可解析。SRC=SELF。

Impact: 仅文档增补(02/03/04/05 四篇),无代码影响。

Refs: Dev 任务分支 feature/architecture-guides。
2026-10-08 09:33:13 +00:00
weichen 09d968cb2f Add architecture guide set for overview, intent, runs, and squads
Why: 系统缺少面向新人与新任务的现状导览;把结构/意图识别/任务执行/小队
四条主线的架构、模型与调用链整理成五篇参考文档,降低跨仓定位成本。

Evidence: 锚点核验于 Dev 组合 218fc4b1ba00b0a03b5bb79f292b3eba6c987a58
(2026-10-08,引用的函数入口行号逐一 grep 定位);git diff --check 通过;
五篇互链相对路径全部可解析。SRC=SELF(本地核验,任务卡有记录)。

Impact: 纯文档新增(docs/guides 五篇),无代码/契约/配置影响。

Refs: Dev 任务分支 feature/architecture-guides(R0 218fc4b1)。
2026-10-08 09:33:13 +00:00
weichen cafd10b44b Backfill the RDM baseline review and MS1 acceptance audit
Why: The RDM plan's 2026-10-07 snapshot (downstream at zero, N1 in
flight, O1/O3/O7 blocked) was contradicted by the RDM repo's 103 merged
PRs; the planning index registered this as an open reconciliation item
and named it the preferred follow-up to the stage-record task.

Evidence: isolated clone replay at RDM 4feb2f0 (pins=v0.1.0) - make
test exit 0, -ms1 PASS (same-source gold caveat recorded), ms0
acceptance PASS=9/SKIP=0 on a disposable postgres container, five
upload probes, and entrance probes (chat 400 vs commands 200); card/
PR snapshot JSON; all receipts SELF (RDM has no CI), stored under
docs/records/2026-10-08-rdm-status-*.json. The private minutes probe
receipt stays local by decision; only hashes and metrics are recorded.

Impact: adds plan SS2.3 (row-by-row re-verdict, MS1 seven-clause audit,
six registered gaps), marks SS2 as a historical snapshot, updates the
index milestone table and closes the RDM-snapshot open item, registers
the dual-main-record ruling and the missing-CI gap.

Refs: Dev task feature/rdm-status-review; Documents index next-step
(2026-10-08).
2026-10-08 09:21:45 +00:00
weichen ec5114d621 Backfill N1/Q1/I1/I2 stage status and scope differences
Why: The planning index listed the stage-record reconciliation as the
preferred next task: N1 WP6b/6c transfers, the Q1 platform-task vs
squad-run boundary, I1 reserved command consumption, and the I2 card's
dangling reference all feed N2/Q3 and RDM dependency judgments.

Evidence: Dev merges #230/#231/#234/#235/#237/#240/#242 verified in
main via git log --merges on 2026-10-08; stage claims are SELF-level
card statements, explicitly not replayed; intent command.go:18-25/78-84
checked for the Cancel/Handoff ruling.

Impact: Adds a status-backfill section (SS7) to the N1/Q1/I1 plan with
per-item done/transferred/todo ownership, an I2 status note in the
stack completion plan (the sole I2 main record), and INDEX navigation
updates; registers the truncated Q2/Q3 archive lines as a new open
item.

Refs: Dev task feature/agent-stack-stage-records; planning index
"next-step" recommendation (2026-10-08).
2026-10-08 06:28:19 +00:00
weichen b825945c1d Record N3 and Q2/Q3 plans in the planning index
Why: documents main gained two plans after the index snapshot, and Dev has since merged N2, N3, Q2, and Q3.
Evidence: 21 markdown proposals are present at HEAD; merge SHAs were read from Dev origin/main git log --merges.
Impact: navigation only; proposal bodies and acceptance claims are unchanged.
Refs: Documents #43 #44; Dev #244 #247 #248 #249 #250 #251 #253
2026-10-08 05:25:44 +00:00
weichen b9590150cc Merge authoritative documents main into the planning index
Why: the index branch was cut before N3 and Q2/Q3 plans landed on main.
Evidence: merge-tree reported no content conflicts against origin/main 16795ed598.
Impact: bring those two proposal files into the index branch without rewriting history.
Refs: documents main
2026-10-08 05:20:23 +00:00
weichen a042edaa73 Propose the Q2 and Q3 implementation plans: topologies and convergence
Why: N1-N3/Q1/I1-I2 are closed; per the completion doc dependency
order Q2 then Q3 are next. Both need plans grounded in current code:
squad has no topology abstraction (two modes, dormant Cond
combinators, dead FactItem.Verified), RespondDecision has no actor
attribution (the mailbox acceptance attack surface), WorkflowDef
execution compresses steps into SpawnSubagent, and adapters/a2a does
not exist.
Evidence: three-area survey with file:line citations at the pinned
baselines (agent-squad c462bc4, backend 6e02a1f); the review
equivalence baseline is quoted from backend runReview with its test
anchors; the P4 ruling is quoted verbatim from agent-harness.md.
Impact: documentation only; Q2 implementation starts after merge,
Q3 after Q2 closes.
Refs: 2026-10-02-agent-stack-completion.md Q2/Q3 sections
2026-10-07 23:27:56 +00:00
weichen c13c79ebac Propose the N3 implementation plan: durability and observability
Why: N2 is closed; per the completion doc's dependency order N3 is
next and needs a plan grounded in current code (the crash window
between persist and intent commit is unprotected, the product
conversation path has zero durability, span names/attributes do not
follow the GenAI convention, the memory port does not exist).
Evidence: five-area survey with file:line citations at the pinned
baselines (agent-native 74aa60b, backend 7980a8a, core 0b5c774);
audit N1/N21 verified fixed, N6/N20 verified still open.
Impact: documentation only; work starts after this plan merges.
Refs: 2026-10-02-agent-stack-completion.md N3 section
2026-10-07 14:55:37 +00:00
weichen f8cc211296 Link historical milestones without overstating validation
Why: expose existing milestone records and distinguish source observations from combination tests.

Evidence: linked records exist at the fixed source version; proposal blobs and the observation receipt remain unchanged.

Impact: index wording and navigation only; no plan or acceptance decision changes.

Refs: docs/proposals/INDEX.md
2026-10-07 14:02:50 +00:00
weichen 8366668e44 Keep unassigned planning ownership explicit
Why: author and task-account names do not establish ownership of a plan.

Evidence: independent review found four missing owner fields in the adopted set and N2 also has none; fourteen source headers explicitly name weichen.

Impact: correct the index attribution and clarify the local N2 document adoption boundary; source proposals remain unchanged.

Refs: planning-index review P2; docs/proposals/INDEX.md
2026-10-07 13:58:35 +00:00