Revise the Generative UI proposal to r2 with the U1 trial results #62

Merged
weichen merged 1 commits from feature/generative-ui-u1 into main 2026-10-11 04:42:49 +00:00
Owner

Why: U1 finished (three arms, synthetic materials, M3+highspeed, CNY 3 of 200); evidence changes the plan: divergence 6/6, generation must use tool arguments, highspeed rejected as generator, in-house renderer kept.

Evidence: Dev task feature/generative-ui-u1 .task/genui-u1/report.md (SELF); CI gate on the Dev PR.

Impact: Proposal r1->r2 + INDEX entry only.

Refs: Dev task feature/generative-ui-u1; Documents PR #60

Why: U1 finished (three arms, synthetic materials, M3+highspeed, CNY 3 of 200); evidence changes the plan: divergence 6/6, generation must use tool arguments, highspeed rejected as generator, in-house renderer kept. Evidence: Dev task feature/generative-ui-u1 .task/genui-u1/report.md (SELF); CI gate on the Dev PR. Impact: Proposal r1->r2 + INDEX entry only. Refs: Dev task feature/generative-ui-u1; Documents PR #60
weichen added 1 commit 2026-10-11 04:42:46 +00:00
Why: The U1 controlled trial (three arms on synthetic materials,
MiniMax M3 + M2.7-highspeed, CNY 3 spent of the 200 cap) finished on
2026-10-11; its evidence changes the plan and must live in the master
record: goal-driven structure divergence holds (6/6), generation must
go through tool arguments (text-channel JSON discipline is the floor),
highspeed is rejected as the generator, and the first release keeps the
in-house renderer.

Evidence: Full data and failure taxonomy in Dev task
feature/generative-ui-u1 (.task/genui-u1/report.md, SELF; CI gate on
the Dev PR). Tool-channel and response_format probes recorded there.

Impact: Proposal r1 -> r2 (new results section, catalog/model/channel
revisions); INDEX entry updated. No code or contract changes.

Refs: Dev task feature/generative-ui-u1; Documents PR #60 (r1)
weichen merged commit 336a90f0ad into main 2026-10-11 04:42:49 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Documents#62