Record the approved progressive workbench design and plan #91

Merged
weichen merged 4 commits from feature/work-companion-ui into main 2026-10-12 19:30:26 +00:00
Owner

Summary

记录已批准界面设计 r0.2、实施计划 r1 与 UI01–UI13 验收映射;实现进展和后续快慢通道依赖有明确边界,交付状态由 Dev 任务主记录维护。

设计 r0.2 → 计划 r1 → Dev 任务主记录

Evidence

SELF:文档随固定 Dev 组合通过边界、固定版本、全量测试与构建。REPLAY:独立 Dev/Docs 一致性 addendum 未发现有效问题。GATE:Dev run2724 的 test、test-pg、svc-realcombo 全三作业成功,精确 b0424f563ede624b92bc4d87344fa481c71b44d2 固定本组件 cf74a200e877d898d928052e6738681be2b670fc,home-runner/runner_id=3。

对象:cf74a200e877d898d928052e6738681be2b670fc;完整脱敏原始收据见 Dev 任务卡。合入前按最新 base/head、独立 Review 和固定组合平台 GATE 核验。

Merge Danger

Door: two-way

Blast Radius: documentation

沿用既有后端能力、权限和数据;不部署服务。可通过组件版本回退。

Why: 让非专业用户先看工作结果,再按需查看依据和执行记录。
Evidence: Dev 任务卡中的固定对象、原始 evidence 收据和复审记录。
Impact: 设计与计划记录;不改变模型路由或业务权限。
Refs: UI01–UI13,U1–U5,work-companion-ui r0.2 / r1。

## Summary 记录已批准界面设计 r0.2、实施计划 r1 与 UI01–UI13 验收映射;实现进展和后续快慢通道依赖有明确边界,交付状态由 Dev 任务主记录维护。 ```text 设计 r0.2 → 计划 r1 → Dev 任务主记录 ``` ## Evidence SELF:文档随固定 Dev 组合通过边界、固定版本、全量测试与构建。REPLAY:独立 Dev/Docs 一致性 addendum 未发现有效问题。GATE:Dev run2724 的 test、test-pg、svc-realcombo 全三作业成功,精确 b0424f563ede624b92bc4d87344fa481c71b44d2 固定本组件 cf74a200e877d898d928052e6738681be2b670fc,home-runner/runner_id=3。 对象:`cf74a200e877d898d928052e6738681be2b670fc`;完整脱敏原始收据见 [Dev 任务卡](https://git-home.u1680832.nyat.app:30319/weichen/Agent-System-Dev/src/branch/main/.task/archive/feature-work-companion-ui.md)。合入前按最新 base/head、独立 Review 和固定组合平台 GATE 核验。 ## Merge Danger **Door:** two-way **Blast Radius:** documentation 沿用既有后端能力、权限和数据;不部署服务。可通过组件版本回退。 Why: 让非专业用户先看工作结果,再按需查看依据和执行记录。 Evidence: Dev 任务卡中的固定对象、原始 evidence 收据和复审记录。 Impact: 设计与计划记录;不改变模型路由或业务权限。 Refs: UI01–UI13,U1–U5,work-companion-ui r0.2 / r1。
weichen added 4 commits 2026-10-12 19:20:03 +00:00
Why: implement a simple workbench for nontechnical users under continuous authorization.

Evidence: current source audit and the reviewed r0.1 prototype; runtime verification remains pending.

Impact: design and plan only; task execution state stays in the Dev task card.

Refs: UI01-UI13 and the existing fast-slow display design r1.1.
Why: preserve concurrent planning records before the Dev combination sync.

Evidence: fetched authoritative Documents main f76cce9e32.

Impact: planning record integration without rewriting history.

Refs: work-companion-ui U5.
Why: Keep the approved design and implementation plan consistent with the current candidate.

Evidence: Reference actual SELF verification and pending independent Review and GATE, without copying command output.

Impact: Planning progress only; inherited live-model capabilities and deployment remain separate.

Refs: UI01-UI13, work-companion-ui U5
Why: Keep planning progress aligned with actual implemented corrections without duplicating CI and merge state.

Evidence: Reference UI155, Frontend210 and 19 local browser cases via Dev native receipts; final GATE remains separately tracked.

Impact: Planning metadata only; no deployment or model-routing claim.

Refs: work-companion-ui r0.2/r1, UI01-UI13
weichen marked the pull request as ready for review 2026-10-12 19:30:25 +00:00
weichen merged commit cf74a200e8 into main 2026-10-12 19:30:26 +00:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: weichen/Agent-System-Documents#91