93587fe813e23e07c8660cac4e2a1f25939c1eec
Why: D49/D51 — aggregated project view (project cards + other conversations' pending) so todos survive conversation switches; D50 — subscribe the project channel via scope=project. Evidence: api endpoints (listProjectCards/cardToProject, card.* named SSE events — also fixes live card events previously dropped); store projectCards/inboxScope/applyProjectEvent/cardToProject with badge combining both scopes; Workbench scope tabs + grouped ProjectInbox; styles for scope control. Impact: existing conversation inbox behavior unchanged; badge now counts both scopes. Refs: documents proposal 2026-09-30-card-stream-artifact-unify-project-inbox.md (D48-D51).
Implement the three-column workbench frontend: resizable/collapsible nav with overshorthand collapse
Implement the three-column workbench frontend: resizable/collapsible nav with overshorthand collapse
Agent-System-Frontend
对话系统前端:React 19 + Vite + TypeScript 三栏工作台(项目会话 / 流式对话 / 计划与工件面板),含 HITL 卡片、sub-agent 追踪弹窗与 schema 驱动渲染;渲染协议由 agent-system-core 定义。
契约与架构见 Agent-System-Documents 设计方案与架构文档;开发规范见 development-guidelines(Dev 仓 development/guidelines)。本仓为 Agent-System 多仓组合的组成部分。
Description
对话系统前端:三栏工作台(项目会话 / 流式对话 / 计划与工件面板),含 HITL 卡片、sub-agent 追踪弹窗与 schema 驱动的设置/插件 UI 渲染;渲染协议由 Agent-System-Core 定义。
3.5 MiB
Languages
TypeScript
92.8%
CSS
6.8%
Shell
0.3%