Pin backend to d2bb936 for the dual-speed slow-lane observability merge
Why: Backend #125 (background subagent inbox card lifecycle, delegate/base-method dual-speed guidance, #background mock demo) merged into component main; the Dev gitlink must move to the merged head for the combo to build with it. Evidence: Backend PR #125 CI green (ci/vet-and-test on 43087a7); Dev-level make test to be rerun on the committed pin (previous run failed only the drift check that expects exactly this commit). Impact: modules/backend gitlink 421fee8 -> d2bb936; no other component moves. Refs: Backend PR #125; task card feature/dual-speed-tasks.
This commit is contained in:
+1
-1
Submodule modules/backend updated: 421fee81c3...d2bb936784
Reference in New Issue
Block a user