Record verified Backend U3 merge and downstream gate

Why: Backend PR #198 has merged, but U3 depends on a user-published trusted Backend tag before RDM can adopt the public contract.

Evidence: Tool-written postmerge receipt verifies PR merged=true, merge 2716b9e with expected base/head parents, current main and Gitea run 3190 at the tested head.

Impact: Backend component is merged; RDM pins, combined acceptance, production work and cleanup remain open.

Refs: IAM U3; Backend PR #198; policy/delivery.md Stage 9
This commit is contained in:
2026-10-14 15:07:01 +00:00
parent fd9d4fde90
commit f313dfb7a4
File diff suppressed because one or more lines are too long